Understand mid cost assistive technology (AT) funding
SGP KP Publishing
This document was released under the Freedom of Information Act 1982 by the National Disability Insurance Agency.
Exported on 2026-08-25 07:51:35
Page 81 of 175
Table of Contents
5 Understand when to include mid cost assistive technology in the participant’s plan . 8
-
5.1 What if the participant needs to replace AT they already use? 5.2 What if mid cost AT has been supplied that is damaged, faulty or doesn’t meet the
-
participant’s needs?
-
5.2.1 If the item is damaged on receipt or faulty and still under warranty
-
5.3 How to work out a reasonable and necessary budget for mid cost AT
-
5.4 How to fund new and replacement mid cost AT in the participant’s plan
-
5.5 How to fund AT repairs and maintenance in the participant’s plan
Understanding Mid-Cost Assistive Technology (AT) Funding
This article provides guidance for a planner delegate to:
- understand the importance of assistive technology
- understand what mid-cost assistive technology is
- understand when to include mid-cost assistive technology in the participant’s plan.
This document was released under the Freedom of Information Act 1982 by the National Disability Insurance Agency.
Recent updates – 3
Page 83 of 175
Recent updates
SGP KP Publishing – Understand mid cost assistive technology (AT) funding
15 December 2025 Link updated to article Understand, create and action a request for a replacement support.
10 November 2025 New guidance created to provide delegates with information about mid cost assistive technology and how to include it in the participant’s plan.
This document was released under the Freedom of Information Act 1982 by the National Disability Insurance Agency.
Recent updates – 4
Page 84 of 175
2 Before you start
You have:
- read and understood Our Guideline – Reasonable and necessary supports (external)
- read and understood Our Guideline – Assistive technology (external)
- read and understood the relevant assistive technology Would we fund it (external)
- read and understood article Support Categories
- discussed the participant’s assistive technology (AT) needs with them or reviewed their request. An AT advisor sometimes submits this on the participant’s behalf with their consent
- checked what AT the participant already has, and when it was funded
- checked the Technical Advice and Practice Improvement Branch (TAPIB) Mandatory and Non-Mandatory Advice Requests to see if the AT request needs mandatory TAPIB advice. If you need to request this advice, go to article Create a technical advice case.
Note: in the technical advice case, you should add the relevant subject, if applicable. For example, if:
- the participant has a diagnosis of Motor Neurone Disease (MND) and needs AT supports
- the request for AT relates to a review of a reviewable decision (s100 request) or a complaint about AT supports.
The request will be triaged and sent to the relevant team.
Other resources
- The Assistive Technology, Home Modifications and Consumables Code Guide (external) contains current claiming codes and descriptions of the most common assistive technology items.
- The Plan Conversation Support Tool (PCST) is used to record the budget for mid cost assistive technology items, repairs and maintenance.
- The AT Item Budget Tool in PANDA offers a quick look up for comments to use in the participant’s plan.
Understand the importance of Assistive Technology
More than 70% of participants use assistive technology (AT) to support their day-to-day activities. Some AT, including shower chairs, transfer hoists and wheelchairs, is essential to enable participants to perform everyday activities. This may include getting out of bed and going to the toilet. Other AT, such as communication, vision or cognitive support AT, enables participants to maintain their independence and manage other supports. For example, organising personal care or work and study supports. Sometimes, the participant’s disability, for example autism, doesn’t indicate a clear link to the need for AT supports. Consider if the AT advisor’s evidence shows the need for AT is linked to the participant’s impairment.
AT should be a key priority during all conversations with the participant about their support needs. If the participant doesn’t have the AT they need, they or their carers may be at risk of injury, social or economic isolation. The participant may not be able to perform a task, which could result in an increase in other support costs. There are similar risks if AT is poorly maintained or broken. It’s important supports are available to make sure the participant can use AT effectively for the duration of their plan.
Understand the importance of Assistive Technology – 6 Page 86 of 175
4 Understand what mid cost AT is
Mid cost assistive technology:
- costs between $1,500 and $15,000 per item
- is more specialised than low cost assistive technology and likely to be disability specific
- needs written evidence from an AT advisor
- often needs training or support to set up and use
- is added to the participant’s capital budget.
Note: everyday items, including iPads, smart watches, smartphones, tablet devices and standard commercially available household items, like a washing machine or dishwasher, are not NDIS supports. They can only be requested as replacement supports and need approval from TAPIB. Go to article Understand, create and action a request for a replacement support.
5 Understand when to include mid cost assistive technology in the participant’s plan
New participants may need funding for AT items in their plan. Or the participant’s needs may change and they may request AT they haven’t needed before.
Before you include funding for mid cost AT in the participant’s plan, you should:
- confirm the AT item is reasonable and necessary. To do this, review the written evidence from the participant’s AT advisor. This can be a letter, email or report. You don’t need a quote for mid cost assistive technology, but an estimate should be provided by the AT advisor. If you don’t receive an estimate, contact the participant to let them know you can’t include the funding until you have one.
- if you’ve asked for TAPIB mandatory advice for the AT item, find out from them if more information is needed to make a decision. You should contact the participant and other relevant parties, like the support coordinator or AT advisor. Let them know what they need to provide and ask them to email it to you.
Note: the participant can also bring information to a planning meeting or check-in, upload it to the NDIS participant portal or email it to enquiries@ndis.gov.au.
- consider if it would be more cost-effective for the participant to purchase, rent, or take out a subscription for the AT item. Advice from the participant’s AT advisor can help you decide the most suitable option.
Note: rental may be a suitable option if the participant needs the AT item while they wait for a custom item. Or if the participant’s condition is rapidly changing and they’re unlikely to need the AT item long term.
- consider capacity building supports for the AT item, including set-up, training for the participant, their family and carers, and annual review. Advice from the participant’s AT advisor will give you an accurate estimate of how many hours to add. Go to article Add or update capacity building assistive technology (AT) supports in a plan approval case.
If you decide the mid cost AT is an NDIS support for the participant, you’ll need to determine a budget and add funding in the participant’s plan. Go to section How to work out a reasonable and necessary budget for mid cost AT and section How to fund new and replacement mid cost AT in the participant’s plan in this article.
5.1 What if the participant needs to replace AT they already use?
Some participants have used AT for many years, and it supports them to achieve their goals. All AT needs maintenance, sometimes repair, and eventually to be replaced. To decide if it’s reasonable and necessary to replace AT, consider the following:
- Some AT components need to be replaced or adjusted regularly. For example, prostheses sockets often need to be replaced every 2 to 3 years, and more frequently
SGP KP Publishing – Understand mid cost assistive technology (AT) funding
- Other items can last 5 or more years if well maintained, particularly vehicle modifications.
- The lifespan of AT varies depending on the type, frequency and intensity of use and the participant’s environment. For example, participants who use their AT every day and live in rural and remote areas may need their AT replaced more frequently. Participants who use their AT once a day, indoors, may not need replacements as often.
- You should consider evidence from suitably qualified AT advisors before making a decision about replacing an item instead of repairing it. You can’t decide to replace an item based only on its age.
- If AT is at the end of its serviceable life, or has been damaged beyond economic repair, replacement can be fairly simple. To review the request, you’ll need evidence from the participant’s AT advisor, such as a letter or report, and an indication of the required budget. You should also consider if previous use of similar AT by the participant has been effective and shown value for money. This reflects continuity of support. You don’t need a quote for mid cost AT, but an estimate should be provided by the participant’s AT advisor. If you don’t receive an estimate, contact the participant to let them know you can’t include the funding until you have one.
- An AT advisor may recommend an AT upgrade or state that the participant’s existing AT is no longer suitable. The AT advisor will need to provide sufficient evidence to justify the recommended upgrade or replacement.
If you decide the replacement AT is an NDIS support for the participant, you’ll need to determine a budget and add funding in the participant’s plan. Go to section How to work out a reasonable and necessary budget for mid cost AT and section How to fund new and replacement mid cost AT in the participant’s plan in this article.
5.2 What if mid cost AT has been supplied that is damaged, faulty or doesn’t meet the participant’s needs?
5.2.1 If the item is damaged on receipt or faulty and still under warranty
The participant should contact the provider, who should refund or replace the item.
5.2.2 If the item is faulty and not under warranty
You could consider funding a replacement as soon as possible. You could also consider funding for rental of a suitable item if the participant needs to wait for a replacement. You don’t need evidence that the item isn’t under warranty, but you should consider:
- contacting the participant to discuss what they’ve done to get the fault resolved
- asking the participant if they have any photos of the condition of AT item, or a written description
- checking CRM or PACE to find out when the item was claimed for and if there are any claims for repairs and maintenance
- checking the warranty section in the Google user manual for the AT item.
Go to section How to work out a reasonable and necessary budget for mid cost AT and section How to fund new and replacement mid cost AT in the participant’s plan in this article.
Understand when to include mid cost assistive technology in the participant’s plan – 9
Page 89 of 175
5.2.3 If the item needs maintenance or repair
Go to section How to fund AT repairs and maintenance in the participant’s plan in this article.
5.2.4 If the item doesn’t meet the participant’s needs
First, the participant should discuss their concerns with their AT advisor and provider.
If the participant can’t resolve their concerns with the AT provider for items that are damaged, faulty or don’t meet their needs, they can contact the Australian Competition and Consumer Commission (external).
5.3 How to work out a reasonable and necessary budget for mid cost AT
Use the PCST to search for the relevant mid cost AT support item and budget amount.
Go to article Understand and update the plan conversation support tool.
Note: the amount will be an increment of $5,000, $10,000 or $15,000. You must use increments of $5,000 when adding funding to the participant’s plan instead of the exact amount. This allows for inflation, quotes changing over time and other changes. It can also help avoid plan variations if the participant needs extra funding in their plan to purchase an AT item.
If the estimate for the AT item is higher than the line item in the PCST, you should round up to the higher increment. For example, if the line item is $4,900 and the estimate is $9,000, you should round up the funding to $10,000.
A high cost AT process must be followed if:
- the participant provides you with a quote and the item costs more than $15,000
- an item is typically valued as mid cost, but the participant needs an item that is quoted above $15,000.
Go to article Understand high-cost assistive technology (AT) funding.
Learn more in section How can you get assistive technology in your plan? in Our Guideline – Assistive technology (external).
5.4 How to fund new and replacement mid cost AT in the participant’s plan
When you decide the AT item is reasonable and necessary, you should:
-
For purchase or subscription, add funding to the AT Capital Budget.
For rental, add funding to the AT Maintenance, Repair and Rental Budget. You must make sure the allowance covers the total period of time the participant needs to rent the
SGP KP Publishing – Understand mid cost assistive technology (AT) funding
AT item for. Go to article Understand assistive technology (AT), maintenance, repairs, rentals and trials funding.
-
Complete the plan comment in PACE using the range of costs for the item from the AT Item Budget Tool in PANDA, and not the exact cost. This helps the participant understand the likely cost of the AT item. Go to article Understand and check plan comments.
-
Add capacity building supports to the plan to cover AT set-up and training and future review. You should review advice from the participant’s AT advisor on the supports that will be needed for each AT item. This will give you an accurate estimate of how many hours of capacity building to add. Go to article Add or update capacity building assistive technology (AT) supports in a plan approval case.
Note: if the participant’s plan has funding periods, funding for purchase, rental, subscription and capacity building should be front-loaded into the first funding period.
5.5 How to fund AT repairs and maintenance in the participant’s plan
All mid and high cost AT items should have an annual budget for repairs and maintenance. Even new AT may require some maintenance in the first 12 months. Warranties don’t always cover all repairs and maintenance. For example, if the participant accidentally damages their wheelchair footplate, this will need a funded repair and won’t be covered by a warranty.
Go to The Assistive technology – Guide for funding of annual repairs and maintenance funding (external) to find out how much to add for each AT item.
You should multiply the annual amount by the plan length. For example, if the annual amount for repairs and maintenance for the item is $400 and the plan goes for 5 years, you would add a total of $2,000.
You should add funding to the AT Maintenance, Repair and Rental Budget. Go to article Understand assistive technology (AT) maintenance, repairs, rentals and trials funding.
Note: if the participant’s plan has funding periods, funding for repairs and maintenance should be front-loaded into the first funding period so it can be accessed when they need it.
In your handover notes and letter to the participant, you should make it clear they need:
- a regular AT maintenance plan
- arrangements for after-hours repair. This should include a contingency plan if the AT item fails and cannot be used.
Understand when to include mid cost assistive technology in the participant’s plan – 11
Page 91 of 175
6 Next steps
For a:
- Plan Approval case, you’ll need to use the Plan Conversation Support Tool to calculate the funded supports. To add or update this support in a draft budget go to article [Change the draft budget](Change the draft budget).
- Plan Change or Participant Budget Update case where the plan was approved before 9 October 2024, go to article [Action a budget update](Action a budget update).
- Plan Change or Participant Budget Update case where the plan was approved on or after 9 October 2024, go to article [Action a budget update with funding periods](Action a budget update with funding periods).
Page 92 of 175
Next steps – 12
🚩 Suggested fixes
Comments
Loading comments…
Comments are temporarily disabled.