FOI 26-3250 - Document 15
The department will inform the disability community of engagement opportunities via the department website and sector communication channels, working closely with state and territory governments and DROs as trusted voices in their communities.
The NDIA will promote all opportunities to provide feedback and take part in consultation activities through their communications and engagement channels.
Page 3 of 11
FOI 26-3250 - Document 15
Consultation approach redacted: s47C
Policy areas to provide input below, with consideration to how activities fit into the phased process outlined above. This will be used to prepare a coherent, coordinated plan across all areas of consultation to avoid duplication for stakeholders and the department.
Access and eligibility assessment
| Lead branch | NDIS Policy, Legislation & Engagement Branch |
| Key contact | redacted: s47E(c), s47F, Sarah Hawke |
| Short reform description | Access to the NDIS will be updated through the introduction of new legislation. A NDIS Technical Advisory Group (TAG) will be established to provide advice on an appropriate threshold and assessments for substantially reduced functional capacity. The TAG will bring together a range of experts to provide independent, evidence-based advice to assess substantially reduced functional capacity for NDIS access which reflects the diverse experiences of people with disability. Alongside this work will be revision of the current eligibility reassessment process to ensure it aligns with legislative changes and operational practice for ongoing NDIS access. |
| Key stakeholders | DSOG, RAC, DRO’s, other key stakeholders (TBC) |
| Sector consultation approach & timeframes | - July — TAG to meet with key stakeholders outlining their remit and engagement approach - 1 — 30 September — TAG to consult on assessment tools, evidentiary standards and threshold options |
| Public consultation approach & timeframes | - August — late September — Public consultation on changes with disability community, including draft Assessment Framework |
New framework planning rules and NDIS Supports
| Lead branch | NDIS Policy, Legislation & Engagement Branch |
| Key contact | redacted: s47E(c), s47F, Sarah Hawke |
| Short reform description | New framework planning will deliver more equitable and consistent participant budgets by introducing a support needs assessment process and budget method outlined in new NDIS rules. The NDIS Supports transitional rule will also be updated to support all participants, on old and new framework plans, to spend in accordance with their reasonable and necessary budget in their plan. The rules will explain: - how participant’s disability support needs are assessed - how reasonable and necessary budgets are worked out - how a participant can use their NDIS budget to purchase NDIS supports |
| Key stakeholders | DSOG, RAC, DRO’s, DRCO’s |
Page 4 of 11
| Sector consultation approach & timeframes | - June and July, regular roundtable discussions to:
- Explain the Support Needs Assessment and Budget Method rules and NDIS transitional Support Rule
- Seek feedback on the clarity of the information presented
- Test communication products ahead of public consultation processes |
| Public consultation approach & timeframes | - Open from 3 August to 30 September 2026
- Explainer videos
- Discussion paper — formal and informal submissions
- Webinar / online survey (TBC) |
Inclusive Communities Fund
| Lead branch | NDIS Strategy & Governance Branch |
| Key contact | redacted: s47E(c), s47F |
| Short reform description | The $200 million Inclusive Communities Fund will uplift the capacity of community organisations to deliver group-based social and community participation activities for NDIS participants. |
| Key stakeholders | Mainstream and disability community-based organisations, Disability Representative Organisations, provider peak bodies. Advice will also be sought from state and territory officials via the Disability Senior Officials’ Group and other officials forums. |
| Sector consultation approach & timeframes | 1 July to 31 August The design of the Inclusive Communities Fund will be informed by consultation with the disability community. The department will undertake targeted consultation with key stakeholders (listed above), such as through roundtable discussions. The department will publish a consultation paper and seek feedback from key stakeholders and the broader community on the design of the fund. |
| Public consultation approach & timeframes | 1 July to 31 August The design of the Inclusive Communities Fund will be informed by consultation with the disability community. The department will publish a consultation paper and seek feedback from key stakeholders and the broader community on the design of the fund. |
Market reforms for social and community participation and capacity building activities
| Lead branch | NDIS Strategy and Governance Branch |
| Key contact | redacted: s47E(c), s47F, NDIA |
| Short reform description | Consultation and design work on reforms to participant supports for Social and Community Participation and Capacity Building, which could include pricing options to encourage the market in group activities and commissioning. |
FOI 26-3250 - Document 15
Page 5 of 11
| Key stakeholders | NDIA, NDIS Commission, provider networks, disability community representative organisations, NDIA CEO / provider forums on options for market reform. |
|---|---|
| Sector consultation approach & timeframes | July 2026 Consultation with disability sector representatives via reform roundtable discussions (RAC, DROs, provider peaks) July 2026, ahead of public consultation focused on designing policy approach, clarifying market gaps and barriers to group service delivery, understanding impact of potential market levers. |
| Public consultation approach & timeframes | August to 31 October 2026 redacted: s47CPublic consultation to follow initial reform roundtable discussions, including potentially: - information webinars (linked to related measures) - online surveys (community representatives / NDIS participants) - targeted submission process with provider / provider groups. Increase understanding of current arrangements and barriers for participants to accessing group SCCP and CBDA supports, inform and seek views from community about proposed changes (ensure alignment of scope, impact and options of all SCCP-related reforms). |
Supported Independent Living
| Lead branch | Quality & Safeguards Policy Branch |
| Key contact | redacted: s47E(c), s47F, (redacted: s47F) |
| Short reform description | Consultation and design of a commissioning approach for home and living supports for Supported Independent Living (SIL) to address market inefficiencies, achieve provider financial viability and improved outcomes for SIL participants. |
| Key stakeholders | Selected SIL providers, participants, representative bodies for providers and participants and carers, state and territory governments. |
| Sector consultation approach & timeframes | 1 August to 31 October 2026 The department is in the process of procuring suitably qualified experts to deliver the project. They are expected to be engaged from July 2026. One of the two key tasks of the consultants is to define the provider and participant cohorts for targeted consultation to inform the second key component of the Budget measure, which is to design a commissioning model for SIL supports. |
| Public consultation approach & timeframes | The exact dates are to be finalised (estimated from July 2026) but it is expected that our approach to public consultation will provide an opportunity for a targeted consultation that will help build a comprehensive picture of the current state of the supported independent living market and service delivery. We intend to seek provider, people with disability and broader affected stakeholder’s perspectives. redacted: s47C |
Differentiated pricing
| Lead branch | Markets & Workforce Branch / NDIA - Economics and Pricing |
| Key contact | redacted: s47E(c), s47F, Acting Branch Manager (NDIA)Alexander Abel, Assistant Secretary (DHDA) |
FOI 26-3250 - Document 15
Page 6 of 11
| Short reform description | - Continue to progress price differentiation including consideration of participant complexity and provider capability, focussed on Therapy and SIL markets. - Price differentiation will align with regulatory reform including mandatory registration for higher risk supports from 1 July 2027. - The development of differentiated pricing will be informed by the Annual Pricing Review (APR), Therapy Pricing Review and Supported Independent Living (SIL) Pricing Review. The Agency also plans to review the DSW cost model as part of this years APR. |
|---|---|
| Key stakeholders | - DHDA - NDIA - NDIS Quality and Safeguards Commission - Central agencies - Providers and peak bodies - Participants and carers |
| Sector consultation approach & timeframes | - Initial consultation with participants and providers through APR consultation. - Further targeted consultation through existing NDIA mechanisms including SIL and therapy pilots, Pricing Roundtable committee with other government schemes, Interdepartmental Pricing Committee with other agencies, Pricing Arrangement Reference Group for independent peer review and with peak bodies (Therapy). - The approach is to collect cost and market evidence and seek feedback on proposed differentiated pricing models once developed. Timeframes are based on individual pilots and committee cadence - And is dependent to legislation changes which impact timing of overall delivery of this APR and the reviews. |
| Public consultation approach & timeframes | - It is proposed that the consultations be delivered in two tranches, balancing the need to inform budgetary processes through the Expenditure Review Committee and the longer timeframes for the SIL Pricing Review and Therapy Pricing Review. - This approach enables SIL and Therapy pilots to conclude, with findings informing the respective reviews. - These consultations will capture targeted feedback on proposed design elements and implementation approaches. |
| — | — |
| APR for 2027–28 prices including initial consultation on SIL and Therapy | July to August 2026 |
| Consultation for: - SIL Pricing Review - Therapy Pricing Review This consultation will seek targeted feedback on proposed pricing options, to test with key stakeholders and inform the final pricing advice. |
November 2026 to January 2027 |
FOI 26-3250 - Document 15
Page 7 of 11
OFFICIAL
FOI 26-3250 - Document 15
Schedule redacted: s47C
Policy areas to provide input below. Please add rows and fill out all columns.
Page 8 of 11
OFFICIAL
| Time | Relevant reform | Activity | Audience |
|---|---|---|---|
| 11 May — 29 May | NFP | Draft Rules content and plan sector engagement. | DSOG, NDIA |
| All | Test approach to engagement with key stakeholders, post-budget sector de-brief. | RAC Co-Chairs, select DRO’s | |
| 1 — 30 June | Access | Establish NDIS Technical Advisory Group (TAG) | DSOG, TAG |
| 1 June — 3 July | NFP | Engagement on draft Rules and feedback on public engagement approach | DSOG, RAC, DRO’s, other key stakeholders |
| 6 — 31 July | Access | TAG meet outline remit, engagement approach, and Assessment Framework | DSOG, RAC, DRO’s, other key stakeholders |
| Inclusive Communities Fund | Consultation on the design of the Inclusive Communities Fund (ICF) (timing from 1 July - TBC) | All stakeholders and public | |
| NFP | Prepare comms for public engagement on Rules | DSOG, NDIA, RAC | |
| Market reforms | Consultation / interviews with key APS stakeholders | NDIA / NDIS Commission | |
| Consultation with disability sector representatives via reform roundtable discussions | DSOG, RAC, DROs, provider peaks / forums | ||
| July to August | Differentiated Pricing | Public consultation on the APR for 2027–28 prices (tranche 1) Providers, peak bodies, participants, carers and broader Sector | Providers, peak bodies, participants, carers and broader Sector |
| 3 August — 30 September | Access | Public consultation on access changes and the Assessment Framework | All stakeholders and public |
| Market reforms | Public consultation following reform roundtable discussions | All stakeholders and public |
NDIS Legislation and Rules Engagement plan 2026 9
FOI 26-3250 - Document 15
Page 9 of 11
OFFICIAL
| Time | Relevant reform | Activity | Audience |
|---|---|---|---|
| NFP | NFP and NDIS Supports rules public consultation process | All stakeholders and public | |
| 1 October — 27 November | Access | Advice provided to government on Access changes | TAG |
| Market reforms | Consultation ends and what we heard’ summaries published and inform next steps (i.e. consideration of commissioning pilots to test potential pricing changes) | All stakeholders and public DSOG, NDIA, RAC, DHDA |
|
| NFP | Review submissions, develop and publish a ‘what we heard’ report for NFP and NDIS Supports rules. | All stakeholders and public | |
| November 2026 | redacted: s47C |
||
| November 2026 — January 2027 | Differentiated Pricing | Public consultation on the SIL Pricing Review and Therapy Pricing Review (tranche 2) | SIL and therapy Providers, peak bodies, participants, carers and broader sector |
| 1 March — 30 April 2027 | Access | Access rules public consultation process | All stakeholders and public |
| April 2027 | redacted: s47C |
||
| May 2027 | Differentiated Pricing | Publication of the APR report and pricing advice | Providers, peak bodies, participants, carers and broader sector |
| 1 July 2027 | Differentiated Pricing | Implementation of the APR for the 2027–28 prices | Providers, peak bodies, participants, carers and broader sector |
NDIS Legislation and Rules Engagement plan 2026
10
Page 10 of 11
FOI 26-3250 - Document 15
OFFICIAL
11
Page 11 of 11
PROTECTED//CABINET
FOI 26-3250 - Document 16
Securing a sustainable NDIS
Draft Budget 2026-27 engagement and communications strategy
Page 1 of 6
PROTECTED//CABINET
FOI 26-3250 - Document 16
Budget engagement and communications timeframes
| Category | April 2026 | May 2026 | June — Sept^ |
|---|---|---|---|
| State & territory governments & government advisory groups | Bilateral meetings with First Ministers Briefing of NDIA Board Chair CFFR initial meeting* FSG meeting Bilateral meetings with Disability Ministers Disability Secretaries & Deputies meeting DRMC meeting |
CFFR follow up meeting* Draft Tranche 1 Bill to First Ministers NDIA Board meeting briefing IAC and RAC briefings |
Budget handed down Introduce Tranche 1 legislation* Pass Tranche 1 legislation* redacted: s47CTranche 2 consultations & sector engagement Tranche 2 legislation drafting and introduction |
| Disability sector, representative organisations & individuals | Email DROs/DRCOs, IAC and RAC about new framework planning delay MO / department calls to priority stakeholders Targeted Ministerial / department engagement with key sector stakeholders |
DRO Forum Provide peak briefing |
|
| Disability community & general public | NDIA publish statement regarding delay of new framework planning | Release of Budget communications products |
DROs: Disability Representative Organisations
DRCOs: Disability Representative & Carers Organisations
IAC: NDIA Independent Advisory Council
RAC: NDIS Reform Advisory Council
- CFFR meetings not currently scheduled — to be settled with Treasurer’s Office.
^ If Tranche 1 Bill is referred to Parliamentary Committee next opportunity to pass will be June sitting period
2
Page 2 of 6
PROTECTED//CABINET
FOI 26-3250 - Document 16
Targeted approaches are required to engage key stakeholders
| Category | Key Stakeholders* | Equities | Key messaging | Engagement approach |
|---|---|---|---|---|
| State and territory governments, Commonwealth Government | redacted: s47C |
- The NDIS is a shared fiscal responsibility. All jurisdictions have a vested interest in moderating Scheme growth to take pressure off budgets. - Budget measures are focused on addressing immediate pressures in the Scheme by pulling levers to address plan inflation, support volumes and fraud. - Further difficult decisions will be required on who the NDIS is for and what supports it should provide. - We are committed to consulting with states and territories on the next tranche of reforms. |
- Pre-22/4 Bilaterals with First Ministers / MOs - Pre-22/4 briefings — First Secretaries & CFFR (subject to availability and agreement by Treasurer’s office) - Post-22/4 briefings to Disability Secretaries, DRMC and CFFR - Provide draft Bill pre-Budget - Post-Budget meetings on longer term reform process |
|
| Government advisory groups | - The NDIS is one of Australia’s most important social reforms and plays a critical role in supporting people with the most significant and permanent disabilities. - Since the release of the 2023 NDIS Review government has undertaken an ambitious reform agenda to make the NDIS fairer and more consistent and address sustainability challenges. - However, the Scheme continues to grow unsustainably, and we now need to go further to secure the Scheme for future generations. - Budget measures are focused on addressing immediate pressures in the Scheme by pulling levers to address plan inflation, support volumes and fraud. - Further reforms will also need to look at access. - This will have significant impacts for the community, sector and NDIA. We are committed to engaging with the community on longer term reforms and will look to you for guidance as we design and implement these reforms. |
- Pre-22/4 briefing of NDIA Board Chair only. - Post 22/4 email to IAC and RAC regarding delay of new framework planning - Post 22/4 targeted engagement through MO / department calls - Post 22/4 NDIA Board meeting - Post-Budget briefings at advisory group meetings on longer term reform process |
*Stakeholders listed are indicative and not exhaustive
3
Page 3 of 6
PROTECTED//CABINET
FOI 26-3250 - Document 16
Targeted approaches are required to engage key stakeholders
| Category | Key stakeholders* | Equities | Key messaging | Engagement approach |
|---|---|---|---|---|
| Disability peaks, representative and advocacy organisations and key individuals | redacted: s47C |
- The NDIS is one of Australia’s most important social reforms and plays a critical role in supporting people with the most significant and permanent disabilities. - We remain committed to securing the NDIS — both for current and future participants. - Since the release of the 2023 NDIS Review government has undertaken an ambitious reform agenda to make the NDIS fairer and more consistent and address sustainability challenges. We have appreciated the sector’s collaboration with us on this reform journey. - However, the Scheme continues to grow unsustainably. We now need to go further to ensure it can continue to support people for generations to come and ensure equity with other support systems. - Measures introduced at Budget are the first steps to broader reforms, including to access. - We know this will have significant impacts for the community. - We are committed to engaging with the community and working with you to consult on the next tranche of reforms. - DROs only: Top-up funding will assist DROs to continue their critical work in engaging with the community and advising government. - New framework planning: Following recent public consultation, we have heard calls to delay commencement, to allow more time to engage with the detail of the new assessment process. Delaying commencement to April 2027 will help build confidence through further consultation, validation and refining the approach. |
- Post 22/4 email regarding delay of new framework planning - Post 22/4 targeted engagement through MO / department calls to some key individuals - Post-Budget DRO Forums, Q&A sessions on new framework planning delay, Budget repair package and longer-term reform consultation - Post-Budget emails / sector newsletters |
*Stakeholders listed are indicative and not exhaustive
4
Page 4 of 6
FOI 26-3250 - Document 16
Targeted approaches are required to engage key stakeholders
| Category | Key stakeholders* | Equities | Key messaging | Engagement approach |
|---|---|---|---|---|
| Disability sector | redacted: s47C |
- The NDIS is one of Australia’s most important social reforms and plays a critical role in supporting people with the most significant and permanent disabilities. - Providers and workers are an integral to delivering the quality supports NDIS participants need. - These reforms are designed to deliver a well-regulated Scheme that rewards quality providers while stamping out opportunities for fraud. - Pricing reforms are designed to reflect the different costs faced by registered and unregistered providers. - We’re also commencing consultation work to address viability pressures in the SIL market through a funding model that reflects the realities of delivering group-based 24/7 support. This would have flow-on benefits to workers, enabling providers to offer more certain rosters and increase job security. |
- Post 22/4 targeted engagement through MO / department calls to some key individuals - Post Budget sector forums / briefings and sector newsletter communications on impacts of immediate reforms and approach to longer term reform consultation - Post-Budget provider FAQs published |
*Stakeholders listed are indicative and not exhaustive
Page 5 of 6
FOI 26-3250 - Document 16
Targeted approaches are required to engage key stakeholders
| Category | Key stakeholders | Equities | Key messaging | Engagement approach |
|---|---|---|---|---|
| Disability community, general public | redacted: s47C |
- The NDIS is one of Australia’s most important social reforms and plays a critical role in supporting people with the most significant and permanent disabilities. We remain committed to securing the NDIS — both for current and future participants. This is why we need to ensure it is there for generations to come. - By moderating growth, we can invest in improved services outside the NDIS and ensuring all Australians have access to the support they need — whether that is in the NDIS, aged care or health system. - The growth target for the NDIS is about how the government manages the Scheme overall, not your individual plan. Your plan will continue to be based on your specific support needs. - These reforms will help us target fraud and waste and put downward pressure on prices to ensure every dollar spent on the NDIS goes to supporting people with disability. - However, there will be changes to plan budgets and access to help manage the long-term sustainability of the Scheme. These changes will not impact the people the NDIS was intended to support — those with permanent and significant disability. - We are committed to consulting on further reforms to the Scheme. - New framework planning: Following recent public consultation, we have heard calls to delay commencement, to allow more time to engage with the detail of the new assessment process. Delaying commencement to April 2027 will help build confidence through further consultation, validation and refining the approach. |
- Post-22/4 NDIA website statement on delay of new framework planning - Post-Budget national communications and engagement, inc. media release, website articles, participant FAQs, social media, Budget at a glance (Easy Read, Auslan video, plain language summary and explainer video) |
Page 6 of 6
FOI 26-3250 - Document 18
Communication and Engagement Strategy — as of 21 April
| Date | Events |
|---|---|
| Wednesday AM 22.04.2026 |
- Briefing of the NDIA Board. ### National Press Club Address |
PM - Ministerial media release and factsheet published. - Communications to key stakeholders Disability Representative Organisations (DROs), NDIS Reform Advisory Committee, and NDIS Independent Advisory Council. - Briefing of state and territory Disability Ministers. |
|
| Thursday 23.04.2026 |
- Minister Butler and Minister McAllister / offices meet with: - DROs - NDIS Reform Advisory Committee Co-Chairs - Chair of Australia’s Disability Advisory Council. |
| Friday 24.04.2026 |
- Combined Deputy Heads of Treasuries (DHoTs) and First Deputies Group (FDG) meeting |
| w/c Monday 27.04.2026 |
- Further targeted engagement between key stakeholders and Ministers’ Offices. |
| Friday 08.05.2026 |
- Copy of legislation for package of priority measures provided to states and territories. |
| Tuesday 12.05.2026 |
Release of Budget 2026-27 |
| Wednesday 13.05.2026 |
Introduction of legislation |
| w/c Monday 18.05.2026 |
- Briefings with: - NDIS Reform Advisory Committee. - NDIS Independent Advisory Council. - DRO Forum. - Providers & Chief Executives. |
This document is the property of the Australian Government and is not to be copied or reproduced
🚩 Suggested fixes
Comments
Loading comments…
Comments are temporarily disabled.