FOI 25/26-1057 DOCUMENT 1
OFFICIAL
For Internal Use Only
National Disability Insurance Agency
Reviews and Information Release Division
Standard Operating
Procedure:
Implementing an ART
Decision, Order or
Notice
This document is uncontrolled in hardcopy.
Document Control
OFFICIAL For Internal Use Only
| Document No | NDIA-ERB-SOP-043 |
|---|---|
| Date | October 2025 |
| Status | FINAL |
| Version | 1.1 |
Document applicability
National — Reviews and Information Release Division
Owner
Director, Performance, Policy, and Quality
Approval Status Log
| Version | 1.1 |
|---|---|
| Reviewed by | Policy Officer |
| Endorsed by | |
| Approved by | Assistant Director, Policy |
| Approval date | 30 October 2025 |
Revision History
| Revision | Date | Sections | Summary of Changes |
|---|---|---|---|
| 1 | 19/03/2025 | All | Original (formerly NDIA-ART CM-SOP-043) Amended to align with NDIA organisational restructure. Notice of Impairments and impairment categories included at section 3.6.1. |
| 1.1 | 30/10/2025 | All | Amended to align with NDIA organisational restructure. |
Note: Document uncontrolled in hardcopy
NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice
OFFICIAL This document is uncontrolled in hardcopy. Page 2 of 22
Page 2 of 22
OFFICIAL For Internal Use Only
Contents
-
-
3.3 Upload the ART Document
-
3.3.1 Upload the ART Document to LEX
-
3.3.2 Upload the ART Document to CRM
-
3.3.3 Upload the ART Document to PACE
-
-
3.4 What further action is required?
-
3.4.1 Orders requiring no action
-
3.4.2 Orders requiring access to the NDIS be granted
-
3.4.3 Orders requiring a Plan build
-
-
3.5 Dismissals and Withdrawals
-
3.5.1 Create a closed Interaction in CRM
-
3.5.2 Create a closed Enquiry Case in PACE
-
-
3.6 Access Matters
-
3.6.1 Create an Enquiry Case in PACE
-
3.6.2 Refer the PACE Enquiry Case to the Scheme Eligibility Branch (SEB)
-
-
3.7 Planning Matters
-
3.7.1 Refer the matter to TAPIB for Home and Living Supports
-
3.7.2 Create an ART Order Implementation Interaction in CRM
-
3.7.3 Build a Plan in CRM
-
3.7.4 Build a Plan in PACE
-
NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice
OFFICIAL This document is uncontrolled in hardcopy. Page 3 of 22
Page 3 of 22
OFFICIAL For Internal Use Only
3.7.5 Planning Support …………………………………………………………………………… 16
3.7.6 Delegation Level 5 Plan Approval …………………………………………. 16
3.7.7 Create a Plan Implementation Case in PACE …………………………… 16
3.7.8 Refer the PACE Plan Implementation Case …………………………… 19
3.7.9 Create an Enquiry Case in PACE to have the Plan Implementation Case
prioritised by National Delivery ................................................. 19
3.7.10 Refer the PACE Enquiry Case to National Delivery ……………………. 20
3.7.11 Complete the ART Order Implementation Interaction in CRM …………. 21
3.8 Closing an ART Matter ………………………………………………………………………….. 21
- Process Flowchart ………………………………………………………………………………………… 22
NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice
OFFICIAL This document is uncontrolled in hardcopy. Page 4 of 22
Page 4 of 22
OFFICIAL For Internal Use Only
1. Introduction
1.1 Purpose
This Standard Operating Procedure will help you to process, review, and finalise
Orders and Notices of the Administrative Review Tribunal (ART), and close
matters in LEX.
The NDIA has a statutory obligation to ensure that, within 28 calendar days of the
date on which an ART Decision, Order or Notice is received:
-
a prospective participant is granted access to the Scheme; or
-
a participant’s plan is approved and implemented.
1.2 Scope
This procedure applies nationally across the External Review Branch (ERB) and
the Information Access and Privacy Branch (IAP) and is to be used by:
-
Case Managers (CM);
-
ART Operations Officers; and
-
the Planning Support Team (PST).
1.3 Roles and Responsibilities
The roles and responsibilities set out in the Standard Operating Procedure:
Document Control apply also to this procedure.
NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice
OFFICIAL This document is uncontrolled in hardcopy. Page 5 of 22
Page 5 of 22
OFFICIAL For Internal Use Only
2. Checklist
| Topic | Checklist |
|---|---|
| Pre-Requisites | □ You have received an ART Order, Notice or Decision |
| Actions | All matters: □ 3.1 When to use CRM and PACE □ 3.2 Identify the ART Document □ 3.3 Upload the ART Document □ 3.3.1 Upload the ART Document to LEX □ 3.3.2 Upload the ART Document to CRM (if required) □ 3.3.3 Upload the ART Document to PACE □ 3.4 What further action is required? Matters which are withdrawn or dismissed: □ 3.5 Dismissals and Withdrawals □ 3.5.1 Create a closed Interaction in CRM (if required) □ 3.5.2 Create a closed Enquiry Case in PACE Access matters: □ 3.6 Access Matters □ 3.6.1 Create an Enquiry Case in PACE □ 3.6.2 Refer the PACE Enquiry Case to the Scheme Eligibility Branch (SEB) Planning matters: □ 3.7 Planning Matters □ 3.7.1 Refer the matter to TAPIB for Home and Living Supports (if required) □ 3.7.2 Create an ART Order Implementation Interaction in CRM (if required) □ 3.7.3 Build a Plan in CRM (if required) □ 3.7.4 Build a Plan in PACE (if required) □ 3.7.5 Planning Support □ 3.7.6 Delegation Level 5 Plan □ 3.7.7 Create a Plan Implementation Case in PACE (for all planning matters) □ 3.7.8 Refer the PACE Plan Implementation Case |
NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice
OFFICIAL This document is uncontrolled in hardcopy. Page 6 of 22
Page 6 of 22
OFFICIAL For Internal Use Only
□ 3.7.9 Create an Enquiry Case in PACE to have the Plan
Implementation Case prioritised by National Delivery
(if required)
□ 3.7.10 Refer the PACE Enquiry Case to National
Delivery (if required)
□ 3.7.11 Complete the ART Order Implementation
Interaction in CRM (if required)
Further Reference:
□ 4 Process Flowchart
NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice
OFFICIAL This document is uncontrolled in hardcopy. Page 7 of 22
Page 7 of 22
OFFICIAL For Internal Use Only
3. Procedure
3.1 When to use CRM and PACE
The NDIA is phasing out the CRM business system. Unless otherwise stated, the
guidance in this procedure around the use of CRM is to be followed only in
planning matters, where the internal review process was initiated in CRM and
where National Delivery have not initiated a plan change process in PACE.
PACE is the business system intended to replace CRM. Unless otherwise stated, the
guidance in this procedure around the use of PACE is to be followed at all times.
The 3P Service Delivery Hub is a helpful resource to support Agency staff, as
PACE is progressively rolled out across the Agency, and includes notices and
information around upcoming enhancements and known system defects.
To support the gradual transition from CRM to PACE, it may be necessary for
certain actions to be performed in both CRM and PACE.
3.2 Identify the ART Document
Orders will set out, in numbered paragraphs, the Orders of the ART. The first page
of the Orders will identify the date on which the Orders were made, at which
Registry, and by which Member. Orders also sealed (stamped) by the ART. The
Date of an Order is the date as it appears on the first page of the document.
It is imperative that ART Orders are processed as soon as possible
to ensure compliance with the NDIA’s statutory obligation to give effect to
an ART Order within 28 days of receipt.
Decisions will usually be accompanied by sealed Orders, and seek to explain, in
numbered paragraphs, the reasoning behind the ART’s decision, as set out in
those Orders. The Date of a Decision will be clearly identified in the document.
Withdrawal and Dismissal Notices are typically set out in the form of a letter,
which states: ‘the application is now dismissed with the effective date of… We will
not continue with the review, and we have closed the file’ (or similar). Notices will
not identify a particular Member, and are not usually sealed (stamped) by the ART.
The Date of a Notice is the ‘effective date’ referred to in the body of the Notice or,
in the absence of such a reference, the date as it appears on the first page.
Note: Where an application is lodged out of time and an extension of time is
not granted by the ART, the ART will not typically issue a Dismissal
Notice. This is because, without that extension of time, the application
is deemed to be valid, and thus cannot be dismissed. In these
circumstances, it is common for the ART to notify the parties by email
that the extension of time has not been granted.
NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice
OFFICIAL This document is uncontrolled in hardcopy. Page 8 of 22
Page 8 of 22
🚩 Suggested fixes
Comments
Loading comments…
Comments are temporarily disabled.