Standard Operating

Procedure:

Implementing an ART

Decision, Order or

Notice

This document is uncontrolled in hardcopy.

Document Control

OFFICIAL For Internal Use Only

Document No NDIA-ERB-SOP-043
Date October 2025
Status FINAL
Version 1.1

Document applicability

National — Reviews and Information Release Division

Owner

Director, Performance, Policy, and Quality

Approval Status Log

Version 1.1
Reviewed by Policy Officer
Endorsed by
Approved by Assistant Director, Policy
Approval date 30 October 2025

Revision History

Revision Date Sections Summary of Changes
1 19/03/2025 All Original
(formerly NDIA-ART CM-SOP-043)

Amended to align with NDIA organisational restructure.
Notice of Impairments and impairment categories
included at section 3.6.1.
1.1 30/10/2025 All Amended to align with NDIA organisational restructure.

Note: Document uncontrolled in hardcopy

NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice

OFFICIAL This document is uncontrolled in hardcopy. Page 2 of 22

Page 2 of 22

OFFICIAL For Internal Use Only

Contents

  • 1. Introduction

  • 2. Checklist

  • 3. Procedure

    • 3.1 When to use CRM and PACE

    • 3.2 Identify the ART Document

    • 3.3 Upload the ART Document

      • 3.3.1 Upload the ART Document to LEX

      • 3.3.2 Upload the ART Document to CRM

      • 3.3.3 Upload the ART Document to PACE

    • 3.4 What further action is required?

      • 3.4.1 Orders requiring no action

      • 3.4.2 Orders requiring access to the NDIS be granted

      • 3.4.3 Orders requiring a Plan build

    • 3.5 Dismissals and Withdrawals

      • 3.5.1 Create a closed Interaction in CRM

      • 3.5.2 Create a closed Enquiry Case in PACE

    • 3.6 Access Matters

      • 3.6.1 Create an Enquiry Case in PACE

      • 3.6.2 Refer the PACE Enquiry Case to the Scheme Eligibility Branch (SEB)

    • 3.7 Planning Matters

      • 3.7.1 Refer the matter to TAPIB for Home and Living Supports

      • 3.7.2 Create an ART Order Implementation Interaction in CRM

      • 3.7.3 Build a Plan in CRM

      • 3.7.4 Build a Plan in PACE

NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice

OFFICIAL This document is uncontrolled in hardcopy. Page 3 of 22

Page 3 of 22

OFFICIAL For Internal Use Only

3.7.5 Planning Support …………………………………………………………………………… 16

3.7.6 Delegation Level 5 Plan Approval …………………………………………. 16

3.7.7 Create a Plan Implementation Case in PACE …………………………… 16

3.7.8 Refer the PACE Plan Implementation Case …………………………… 19

3.7.9 Create an Enquiry Case in PACE to have the Plan Implementation Case

               prioritised by National Delivery .................................................                 19

3.7.10 Refer the PACE Enquiry Case to National Delivery ……………………. 20

3.7.11 Complete the ART Order Implementation Interaction in CRM …………. 21

3.8 Closing an ART Matter ………………………………………………………………………….. 21

  1. Process Flowchart ………………………………………………………………………………………… 22

NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice

OFFICIAL This document is uncontrolled in hardcopy. Page 4 of 22

Page 4 of 22

OFFICIAL For Internal Use Only

1. Introduction

1.1 Purpose

This Standard Operating Procedure will help you to process, review, and finalise

Orders and Notices of the Administrative Review Tribunal (ART), and close

matters in LEX.

The NDIA has a statutory obligation to ensure that, within 28 calendar days of the

date on which an ART Decision, Order or Notice is received:

  • a prospective participant is granted access to the Scheme; or

  • a participant’s plan is approved and implemented.

1.2 Scope

This procedure applies nationally across the External Review Branch (ERB) and

the Information Access and Privacy Branch (IAP) and is to be used by:

  • Case Managers (CM);

  • ART Operations Officers; and

  • the Planning Support Team (PST).

1.3 Roles and Responsibilities

The roles and responsibilities set out in the Standard Operating Procedure:

Document Control apply also to this procedure.

NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice

OFFICIAL This document is uncontrolled in hardcopy. Page 5 of 22

Page 5 of 22

OFFICIAL For Internal Use Only

2. Checklist

Topic Checklist
Pre-Requisites □ You have received an ART Order, Notice or Decision
Actions All matters:

□ 3.1 When to use CRM and PACE

□ 3.2 Identify the ART Document

□ 3.3 Upload the ART Document
□ 3.3.1 Upload the ART Document to LEX
□ 3.3.2 Upload the ART Document to CRM (if required)
□ 3.3.3 Upload the ART Document to PACE

□ 3.4 What further action is required?

Matters which are withdrawn or dismissed:

□ 3.5 Dismissals and Withdrawals
□ 3.5.1 Create a closed Interaction in CRM (if required)

□ 3.5.2 Create a closed Enquiry Case in PACE

Access matters:
□ 3.6 Access Matters
□ 3.6.1 Create an Enquiry Case in PACE

□ 3.6.2 Refer the PACE Enquiry Case to the Scheme
Eligibility Branch (SEB)

Planning matters:

□ 3.7 Planning Matters
□ 3.7.1 Refer the matter to TAPIB for Home and Living
Supports (if required)

□ 3.7.2 Create an ART Order Implementation Interaction
in CRM (if required)

□ 3.7.3 Build a Plan in CRM (if required)
□ 3.7.4 Build a Plan in PACE (if required)
□ 3.7.5 Planning Support
□ 3.7.6 Delegation Level 5 Plan
□ 3.7.7 Create a Plan Implementation Case in PACE
(for all planning matters)

□ 3.7.8 Refer the PACE Plan Implementation Case

NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice

OFFICIAL This document is uncontrolled in hardcopy. Page 6 of 22

Page 6 of 22

OFFICIAL For Internal Use Only

□ 3.7.9 Create an Enquiry Case in PACE to have the Plan

Implementation Case prioritised by National Delivery

(if required)

□ 3.7.10 Refer the PACE Enquiry Case to National

Delivery (if required)

□ 3.7.11 Complete the ART Order Implementation

Interaction in CRM (if required)

Further Reference:

□ 4 Process Flowchart

NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice

OFFICIAL This document is uncontrolled in hardcopy. Page 7 of 22

Page 7 of 22

OFFICIAL For Internal Use Only

3. Procedure

3.1 When to use CRM and PACE

The NDIA is phasing out the CRM business system. Unless otherwise stated, the

guidance in this procedure around the use of CRM is to be followed only in

planning matters, where the internal review process was initiated in CRM and

where National Delivery have not initiated a plan change process in PACE.

PACE is the business system intended to replace CRM. Unless otherwise stated, the

guidance in this procedure around the use of PACE is to be followed at all times.

The 3P Service Delivery Hub is a helpful resource to support Agency staff, as

PACE is progressively rolled out across the Agency, and includes notices and

information around upcoming enhancements and known system defects.

To support the gradual transition from CRM to PACE, it may be necessary for

certain actions to be performed in both CRM and PACE.

3.2 Identify the ART Document

Orders will set out, in numbered paragraphs, the Orders of the ART. The first page

of the Orders will identify the date on which the Orders were made, at which

Registry, and by which Member. Orders also sealed (stamped) by the ART. The

Date of an Order is the date as it appears on the first page of the document.

It is imperative that ART Orders are processed as soon as possible

to ensure compliance with the NDIA’s statutory obligation to give effect to

an ART Order within 28 days of receipt.

Decisions will usually be accompanied by sealed Orders, and seek to explain, in

numbered paragraphs, the reasoning behind the ART’s decision, as set out in

those Orders. The Date of a Decision will be clearly identified in the document.

Withdrawal and Dismissal Notices are typically set out in the form of a letter,

which states: ‘the application is now dismissed with the effective date of… We will

not continue with the review, and we have closed the file’ (or similar). Notices will

not identify a particular Member, and are not usually sealed (stamped) by the ART.

The Date of a Notice is the ‘effective date’ referred to in the body of the Notice or,

in the absence of such a reference, the date as it appears on the first page.

Note: Where an application is lodged out of time and an extension of time is

not granted by the ART, the ART will not typically issue a Dismissal

Notice. This is because, without that extension of time, the application

is deemed to be valid, and thus cannot be dismissed. In these

circumstances, it is common for the ART to notify the parties by email

that the extension of time has not been granted.

NDIA-ERB-SOP-043-V1.1-FINAL SOP: Implementing an ART Decision, Order, or Notice

OFFICIAL This document is uncontrolled in hardcopy. Page 8 of 22

Page 8 of 22

Comments

Loading comments…

What kind of comment is this?
Add a comment