oh Outlook

Comments

FOI 24/25-1870 DOCUMENT 13

oh Outlook

FW: Further follow up: Request for assistance please: stated supports [SEC=OFFICIAL]

Date Thu 24/04/2025 10:48 To redacted Laura <s22(1)(a)(ii) - irrelevant material>

FYI —in case Mim speaks to you about this. Can chat through in our 121 today if you need more context.

Kind regards Carly

Carly Sierota (she/her)

Branch Manager, Service Guidance Branch Service Design and Improvement (SDI) Group National Disability Insurance Agency

redacted: s22(1)(a)(ii) - irrelevant material

Making Flexibility Work - if you receive an email from me outside of normal business hours, I’m sending it at a time that suits me. | don’t expect you to read or reply outside of your normal business hours.

Delivered by the National Disability Insurance Agency

The NDIA acknowledges the Traditional Custodians of Country throughout Australia and their continuing connection to land, sea and community. We pay our respects to them and their cultures and to Elders past, present and emerging.

From: SIEROTA, Carly Sent: Thursday, 24 April 2025 10:42 AM To: redacted Stephen <s22(1)(a)(ii) - irrelevant material> Cc: redacted: s22(1)(a)(ii) - irrelevant material

Subject: RE: Further follow up: Request for assistance please: stated supports [SEC=OFFICIAL]

Hi Stephen, Appreciate the clarification, that makes sense.

In terms of the request for updating the OG, the issue we have in making those updates is there are times where that isn’t the case, where we intentionally state the support as a safeguard or restriction for a participant and then they can’t use the support flexibility even if in the same category. And because participant plans are individualised, we can’t say that this is the case in all instances. This is a tricky balance we’ve worked with legal and policy to land in how we can say this in a way which aligns with the Act and the purpose of an OG which is to explain the principles we use based on the Rules for how we make decisions in a participant’s plan. We are working on a participant guide to claiming, like a PAPL for participants which we’re hoping will help PMs and self-managed participants but it will be something we’ll need to iterate over time so not an immediate solution. This is why we have chosen to update the FAQ in the interim while still pointing to the OG for the broader context for what’s in the leg.

Ultimately though the issue comes down to what’s being printed on the plan which is largely due to how planners are building plans using line items and where they add free text. This is against endorsed practice. Line items are commonly used in practice for adding IDL as a hangover from when the position was to develop plans using a bottom up planning approach, building plans line item by line item. As you know, the PCST was introduced as a way to still calculate plans based on the cost of support items however when building the plan into Pace, only stated supports should be added as a line item. The total cost of the support (based on the PCST) should then be added at the support category level to enable flexibility in the plan. This is clear in guidance however is not being followed consistently. Shane’s team is making some changes in Pace so if planners do select line items, the static text populated on the plan is less specific however this doesn’t resolve the issue completely and planners can still add free text in plan comments which providers/participants are guided by. We’ve added examples of what best practice free text looks like however planners will still need to tailor to the individual participant so in applying the guidance, they will need to balance the giving enough information that helps participants and providers understand what the intention is of the support for that participants to help them spend in line w their plan while enabling plan flexibility.

Its an important issue and one we’re very aware of and working w SD to strengthen the guidance and system processes for how a plan is built where we can but it really comes down to practice of planners in applying and capability in R&N decision making. This is a gap which needs to be resolved through a practice leadership approach to reinforce endorsed practice reflected in guidance and build capability in staff in how to explain their R&N decisions.

NFP should resolve a lot of these issues in the way plans are built with a lot more flexibility and whole of person budget but of course there’s an immediate need to correct planner practice as this may take up to 5 years for all participants to transition to this new planning framework.

Sorry couldn’t meet today to chat — happy to pick up again next week if need to talk through some more. Might be worth bringing in Kellie or Desiree to chat through in terms of things they are doing to align practice.

Kind regards Carly