This Standard Operating Procedure (SOP) will help Access Assessors check for any missed steps during an eligibility reassessment to ensure a participant has procedural fairness during this process.

1. Recent updates

Date What’s changed
October 2022 • Content from SOP — Make Eligibility Reassessment decision included in standalone SOP
• New SOP to check for procedural fairness

2. Checklist

Topic Checklist
Pre-requisites You have read and understood:
Q Our Guideline — Applying to the NDIS
Q Our Guideline — Leaving the NDIS
You have:
Q) An eligibility check or reassessment is in progress

V1.0 2022-10-09 Check for procedural fairness — Eligibility Reassessment Page 1 of 4 This document is uncontrolled when printed. OFFICIAL

Page 106 of 260

Standard Operating Procedure

For Internal Use Only

Topic Checklist
Actions Q 3.1 All relevant information has been reviewed
Q 3.2 Sufficient contact attempts were made
Q 3.3 A clear explanation about why the participant may not be eligible
Q 3.4 Relevant correspondence was sent
Q 3.5 Sufficient time was given to provide information
Q 3.6 Extension of time requests were considered
Q 3.7 Next steps

3. Procedure

Note: It is important, from an administrative law perspective, that the process leading to a revocation decision is procedurally fair. This includes giving the participant reasonable opportunity to provide information, and to present a case to support their continued eligibility.

3.1 All relevant information has been reviewed

  1. Check that all relevant information was reviewed from the ER Request, Interactions, NAT Inbox, Documents, and any other available information on the participant’s record such as the planning conversation tool, plan value, plan usage and supports in place.

  2. Complete any missing tasks, refer to SOP — [Complete eligibility reassessment missed steps](SOP — Complete eligibility reassessment missed steps).

3.2 Sufficient contact attempts were made

  1. Check that sufficient attempts were made to contact the participant or their representative:

    • when the ER commenced, and
    • about the potential for adverse decision.
  2. Check that contact attempts were made using the person’s preferred contact method.

  3. Complete any missing tasks, refer to SOP — [Complete eligibility reassessment missed steps](SOP — Complete eligibility reassessment missed steps).

3.3 A clear explanation about why the participant may not be eligible

V1.0 2022-10-09 Check for procedural fairness — Eligibility Reassessment Page 2 of 4 This document is uncontrolled when printed. OFFICIAL

Page 107 of 260

Standard Operating Procedure

For Internal Use Only

If phone contact attempts were successful:

  1. Check that a clear explanation was provided about what information indicated that the participant may not be eligible.
  2. Complete any missing tasks, refer to SOP – [Complete eligibility reassessment missed steps](SOP – Complete eligibility reassessment missed steps).

3.4 Relevant correspondence was sent

  1. Check the following letters were sent to the participant:
    • Letter – [Eligibility Reassessment – Commencement – 1st opportunity to respond](Eligibility Reassessment – Commencement – 1st opportunity to respond)
    • Letter – [Eligibility Reassessment – Potential for adverse decision – 2nd opportunity to respond](Eligibility Reassessment – Potential for adverse decision – 2nd opportunity to respond)
  2. Complete any missing tasks, refer to SOP – [Complete eligibility reassessment missed steps](SOP – Complete eligibility reassessment missed steps).

3.5 Sufficient time was given to provide information

  1. Check that the participant was given at least 28 days from the date of each letter to provide information.
  2. Complete any missing tasks, refer to SOP – [Complete eligibility reassessment missed steps](SOP – Complete eligibility reassessment missed steps).

3.6 Extensions of time requests were considered

  1. If the participant asked for an extension of time, if this was:
    • Approved: check this was reasonable based on the individual circumstances.
    • Declined:
      • check this was reasonable based on the individual circumstances, and
      • check this was explained to the person, or
      • escalated to a Team Leader.
      • Complete any missing tasks, refer to SOP – [Complete eligibility reassessment missed steps](SOP – Complete eligibility reassessment missed steps).

3.7 Next steps

Procedural fairness is checked at each stage of the Eligibility Reassessment, so next steps may be:

V1.0 2022-10-09 Check for procedural fairness – Eligibility Reassessment Page 3 of 4 This document is uncontrolled when printed. OFFICIAL

                          Page 108 of 260

Standard Operating Procedure

For Internal Use Only

  • e commence the ER, or
  • e determine there is potential for an adverse decision, or
  • e submit a revocation decision.
  • SOP — Complete Eligibility Reassessment missed steps

5. Feedback

If you would like to provide feedback about this guidance material, please complete our Feedback form.

6. Version control

Version Amended by Brief Description of Change Status Date
1.0 GO0002 Class 3 approval. APPROVED 2022-10-09
SMO0075 New SOP to align with Our Guideline — Leaving the NDIS. Content from SOP — Make Eligibility Reassessment decision is now included in standalone SOP.

V1.0 2022-10-09 Check for procedural fairness — Eligibility Reassessment Page 4 of 4 This document is uncontrolled when printed. OFFICIAL

Page 109 of 260