Consider Eligibility Reassessment outcome following 1st chance to respond

This Standard Operating Procedure (SOP) will help you consider the outcome of the Eligibility Reassessment (ER), following the participant’s first chance to respond.

This involves considering if a participant meets the:

  • residence and disability requirements, or
  • early intervention requirements.

This SOP has three outcomes.

  1. Potential for an adverse decision:
    • the participant is unlikely to meet the residence, disability or early intervention requirements, or
  2. Maintain Access Status:
    • the participant still meets the eligibility requirements they joined the NDIS under, or
    • the participant now meets the early intervention requirements when they joined the NDIS under disability, or
  3. Change Access Status:
    • the participant now meets the disability requirements when they joined the NDIS under early intervention.

Note: Maintain Access Status and Change Access Status are not reviewable decisions under the NDIS Act.

Recent updates

Date What’s changed
December 2022 Updates to improve SOP intent and accuracy. Including: - updated introduction to include 3 separate outcomes of this SOP

V3.0 2022-11-29 | Consider ER outcome following 1st chance to respond Page 1 of 37

This document is uncontrolled when printed

OFFICIAL

Page 150 of 260

Standard Operating Procedure

For Internal Use Only

Date What’s changed
• e outcome justification template to include evidence that was considered when making decision
• e formatting, links and grammar updates.
The SOP - Check for Eligibility Reassessment missed steps has been retired. Use SOP - Check for procedural fairness in an Eligibility Reassessment.
October 2022 • Updates to align with Our Guideline — Leaving the NDIS.
• e Improved messaging about the participant’s responsibility to provide information to support their eligibility.
• e Improved messaging about our responsibility to help the participant understand the information we need to assess eligibility.
• e Updated links for SOP — Undertake eligibility reassessment separated into 8 SOPs:
◦ SOP - Consider commencement of Eligibility Reassessment or Access Status Change
◦ SOP - Consider Eligibility Reassessment outcome following 1st chance to respond
◦ SOP - Action evidence extension request for an Eligibility Reassessment
◦ SOP — Action Call back Request for an Eligibility Reassessment
◦ SOP - Make Eligibility Reassessment decision
◦ SOP - Refer request to cease participant status during Eligibility Reassessment
◦ SOP - Check for procedural fairness in an Eligibility Reassessment
◦ SOP — Complete Eligibility Reassessment missed steps.
• e Information about requesting technical advice from a QDO or TAB and align mandatory requests for Eligibility Reassessment (ER) with access decisions.
• e Steps added to maintain or change access status.
• e Updated letter file names (internal) to plain English.

V3.0 2022-11-29 | Consider ER outcome following 1°‘ chance to respond Page 2 of 37

This document is uncontrolled when printed

OFFICIAL

Page 151 of 260

Standard Operating Procedure

For Internal Use Only

Date | What’s changed

e Improved formatting to highlight pre-checks.

e Link to new SOPs:

  • SOP - Check for procedural fairness in an Eligibility Reassessment
  • SOP — Check for Eligibility Reassessment missed steps
  • SOP - Complete Eligibility Reassessment missed steps
  • SOP - Check for remote or very remote address.

2. Checklist

Topic | Checklist

Pre-requisites | You have:

  • read and understood Our Guideline — Applying to the NDIS
  • read and understood Our Guideline — Leaving the NDIS
  • an ER task with an Outcome to Commence Eligibility Reassessment
  • checked all pre-checks were completed using SOP - Consider commencement of Eligibility Reassessment or Access Status Change. The pre-checks are:
    • independent Delegate
    • unable to contact for plan reassessment
    • ER checklist is complete and attached
    • 12 months of funded supports have been received
    • check if primary disability is developmental delay
  • completed any missed steps using SOP - Complete Eligibility Reassessment missed steps
  • confirmed a minimum of 28 days (plus any approved extension of time request) have passed since the Letter — Eligibility Reassessment — Commencement - 1st Opportunity to Respond was sent to the participant.

V3.0 2022-11-29 Consider ER outcome following 1° chance to respond | Page 3 of 37

This document is uncontrolled when printed

OFFICIAL

Page 152 of 260

Standard Operating Procedure

For Internal Use Only

Topic: Checklist

Actions Description
□ 3.1 Check for ER request
□ 3.2 Complete pre-checks
□ 3.3 Consider residence and disability or El requirements
□ 3.4 Consider ER likely outcome
□ 3.5 Update ER request: 2nd chance to send evidence
□ 3.6 Send letter: 2nd chance to send evidence
□ 3.7 Contact participant or representative: 2nd chance to send evidence
□ 3.8 Add interaction: Notify plan developer — Potential for adverse decision
□ 3.9 Submit ER outcome: Maintain Access Status
□ 3.10 Submit ER outcome: Change Access Status (from El to disability)
□ 3.11 Review quality check feedback: Access Status outcome (if sent for quality checking)
□ 3.12 Send letter: Access Status outcome
□ 3.13 Contact participant or representative: Explain Access Status outcome
□ 3.14 Check/update primary and secondary disabilities
□ 3.15 Add interaction: Notify plan developer — ER outcome
□ 4.0 Appendices

3. Procedure

During the ER process, do not reassign the application in the Business System. The application must remain assigned to the plan developer so they can continue with planning activities throughout the ER process.

3.1 Check for ER request

You might receive an ER request at different points in the process. So, you might complete one or more of the following steps.

3.1.1 Obtain work item
  1. In My Inbox: Select Ready for Work

Note: This will allocate a work item to your inbox.

  1. Select the work item.

V3.0 2022-11-29 | Consider ER outcome following 1st chance to respond Page 4 of 37 This document is uncontrolled when printed OFFICIAL

Page 153 of 260

Standard Operating Procedure

For Internal Use Only

  1. Is it an ER work item:

3.2 Complete pre-checks

3.2.1 Check for an independent delegate

  1. Did you make the original access decision?
  • No: Go to Step 3.2.2: Check for YPIRAC.
  • Yes: Ask your team leader to Re-assign the work item to another Access Assessor.

End of process.

3.2.2 Check for YPIRAC

  1. Is there an alert for Younger People in Residential Aged Care (YPIRAC)?
  • No: Go to Step 3.2.3: Check for remote or very remote.
  • Yes: Re-assign the work item to Nicola King (NK0019).

End of process.

3.2.3 Check for remote or very remote

  1. Does the participant live in a remote or very remote area? Refer to SOP - Check for remote or very remote address.
  • No: Go to Step 3.2.4: Check ER work item.
  • Yes: Re-assign the work item to Danika Sharpe (DJS497).

End of process.

3.2.4 Check ER work item

  1. Check work item Type.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 5 of 37 This document is uncontrolled when printed OFFICIAL

Page 154 of 260

Standard Operating Procedure

For Internal Use Only

  1. Check Outcome to determine the next steps.

  2. If Outcome is:

  • not displayed: Go to SOP - Consider commencement of Eligibility Reassessment or Access Status Change.
  • Commence Eligibility Reassessment: Go to Step 3.3 Consider residence and disability or EI requirements
  • Opportunity to Respond: Go to SOP - Make Eligibility Reassessment decision.

3.2.5 Check for a request for more time to send evidence

  1. Go to SOP - Action Evidence Extension Request for an Eligibility Reassessment.

3.2.6 Check for a call back request

  1. Go to SOP - Action Call back Request for an Eligibility Reassessment.

3.3 Consider residence and disability or Early Intervention (EI) requirements

It is the participant’s responsibility to provide evidence that they continue to meet eligibility requirements. It is our responsibility to help the participant understand the evidence we need.

  1. Check the ER Request work item Outcome Justification.

Note: This will determine the eligibility criteria you consider, and the order to consider them.

  1. If the Outcome Justification states that the participant may:
  • not meet residence (only): consider residence requirements.
  • not meet residence and disability and EI: consider residence, disability and EI requirements.
  1. Review the ER Checklist and all relevant participant information including:

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 6 of 37 This document is uncontrolled when printed

Page 155 of 260

Standard Operating Procedure

For Internal Use Only

• Interactions • Inbound Documents • NAT inbox, and • other available information on the participant’s record such as the planning conversation tool, plan value, plan usage and supports in place.

  1. Notify your Team Leader if you notice any integrity issues then proceed with ER.

3.4 Consider ER likely outcome

  1. Assess the evidence against the eligibility requirements in the right order. For steps, go to ARIS process connect:

    • P2.2.4 Make Access Decision Under 6 Years of Age or • P2.2.3 Make Access Decision Aged 6 and Over.

  2. Refer to available resources as required, such as:

    • Our Guideline – Applying to the NDIS • Our Guideline – Leaving the NDIS • Technical Advisory Branch (TAB) Digest – Published Advice

  3. Check if the NSW Prescribed Program exception applies (relevant to the residence requirements only).

  4. Consider if there is sufficient evidence to decide if the participant meets the residence and/or disability or early intervention requirements (if the participant joined the NDIS under one of the NSW prescribed programs, only consider the disability and EI requirements and do not consider the residence requirements).

  5. Consider if you need technical support or if you can make a decision to maintain access status, change access status or make a potential for adverse decision.

  6. Revisit SOP - Check for procedural fairness in an Eligibility Reassessment to make sure the process leading to a revocation is procedurally fair.

3.4.1 If technical support or advice is required

  1. Refer to SOP – Request technical advice to progress an Eligibility Reassessment if you:

    • want to ask for QDO technical support to decide the next step, or • require mandatory TAB advice.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 7 of 37 This document is uncontrolled when printed

Page 156 of 260

Standard Operating Procedure

For Internal Use Only

Note: If a participant has a primary disability that is a chronic health condition and TAB advice was not obtained at the point of access – mandatory TAB advice is required before maintaining or changing access status.

3.4.2 If ER outcome – Maintain Access Status

  1. Refer to Step 3.9 Submit ER outcome: Maintain Access Status, if:

The information indicates that the participant:

  • meets the residence and disability or early intervention requirements that they joined the NDIS under, or
  • joined the NDIS under the disability requirements and now meets early intervention requirements

And

  • does not have a primary disability that is a chronic health condition, or
  • has a primary disability that is a chronic health condition, and you confirmed TAB advice was obtained at the point of access or you obtained mandatory TAB advice to support your Maintain Access Status outcome.

3.4.3 If ER outcome – Change Access Status

  1. Refer to Step 3.10: Submit ER outcome: Change Access Status (from EI to disability), if:

The information indicates that the participant:

  • joined the NDIS under the early intervention requirements and now meets the disability requirements

And

  • does not have a primary disability that is a chronic health condition, or
  • has a primary disability that is a chronic health condition, and you confirmed TAB advice was obtained at the point of access or you obtained mandatory TAB advice to support your Change Access Status outcome.

3.4.4 If Potential for Adverse Decision

  1. Refer to Step 3.5: Update ER request: 2nd chance to send evidence, if:

The information indicates that:

  • the participant is unlikely to meet the residence and disability or early intervention requirements, or

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 8 of 37 This document is uncontrolled when printed OFFICIAL

Page 157 of 260

Standard Operating Procedure

For Internal Use Only

• there is no information or insufficient information to determine if the participant meets the residence and disability or early intervention requirements.

And • the NSW Prescribed Program exception does not apply (relevant to the residence requirements only).

3.5 Update ER request: 2nd chance to send evidence

3.5.1 Prepare Request Further Information template

  1. Open Template – Eligibility Reassessment – 1st and 2nd opportunity to respond.
  2. Complete fields in the templates for all requirements unlikely to be met (including both disability and EI criteria).
  3. Save the completed template as a Word document to your desktop or OneDrive. Note: This will be used to populate the ER letter in a later step.
  4. Copy the completed template to paste into the Outcome Justification.

3.5.2 Update ER request outcome: Opportunity to Respond

  1. In the NDIS Account Screen: Select Internal Use.
  2. In Internal Use: Select Open Activities.
  3. In the Transaction Id column: Select the hyperlinked Transaction Id that corresponds with the Eligibility Re-Assessment Request Activity.
  4. In the Eligibility Reassessment Request: Select Edit.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 9 of 37 This document is uncontrolled when printed

Standard Operating Procedure

For Internal Use Only

  1. In Outcome: Select Opportunity to Respond.

  2. In Outcome Justification:

There is not enough information to indicate that <Participant’s name> meets the eligibility requirements. I have made a Potential for Adverse Decision.

Primary Disability: <Participant’s primary Disability>

I have received and considered the following evidence:

<List the information and evidence that has already been considered for eligibility reassessment>.

I have requested the following information:

<Paste the completed eligibility reassessment opportunity to respond template>

<Enter your User ID>

  1. In Supporting Info:

Refer to Outcome Justification.

  1. Select Submit.

  2. Select Edit.

  3. In Due Date: Update to 29 days after the date of the letter.

Note: This stops the ER work item from being allocated on the 28th day.

  1. In Supporting Info:

Due date updated to 29 days after the date of the letter. This allows the system to give the participant the full 28 days to provide information.

  1. Select Back.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 10 of 37 This document is uncontrolled when printed OFFICIAL

Page 159 of 260

Send Letter: 2nd Chance to Send Evidence

  1. Open and edit the Letter – Eligibility Reassessment – Potential for adverse decision – 2nd opportunity to respond.
  2. Copy the completed decision templates into the letter.

Note: The template was saved to your desktop or OneDrive earlier. 3. Send letter to the participant or their representative via their preferred correspondence method. 4. Delete the template saved to your desktop or OneDrive after you have completed this step.

3.6.1 Attach Letter to Inbound Documents

  1. In the NDIS Account screen: Select Documents.
  2. Select Add Items and then select Inbound Document.
  3. In Description: Letter – ER – Potential for adverse decision.
  4. In Status: Select Completed.
  5. In Category 1: Select NDIA Service.
  6. In Category 2: Select Other Correspondence.
  7. In Employee Responsible: Enter your details.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 11 of 37 This document is uncontrolled when printed

Page 160 of 260

Standard Operating Procedure

For Internal Use Only

  1. In Note: Letter <emailed/mailed> to on by .

  2. Select the Upload File button under Attachments.

  3. In the File Explorer window: Select the relevant document.

  4. Select Save.

3.7 Contact participant or representative: 2nd chance to send evidence

Note: A representative could be the participant’s authorised representative, nominee or child representative. If the participant has a nominee, they will be listed as a contact as a Plan Nominee.

If the person’s preferred correspondence method is email/letter, you must still attempt to call them about the potential for adverse decision. The exception is if the person has requested no phone calls (for example, they are Deaf and have requested written communication only), or if they have not provided a phone number.

3.7.1 Contact person: 2nd chance to send evidence

  1. Refer to SOP – Send SMS using Whispir messenger to send ‘Contact attempt SMS template’ to advise you will be calling.

Note: Only send this SMS before your first attempt to call the person.

Do not contact the person by SMS if they have told the Agency that they do not consent to this form of communication.

  1. Prepare for your call:
  • Read 8.3: Sensitive conversations in the Conversation Style Guide
  • Review the relevant evidence on the participant’s record, and your reasons why they are unlikely to meet the eligibility requirements.
  • Have the Letter – Eligibility Reassessment – Potential for adverse decision – 2nd opportunity to respond handy for reference during the call.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 12 of 37 This document is uncontrolled when printed

OFFICIAL

Page 161 of 260

Standard Operating Procedure

For Internal Use Only

  1. Make 5 telephone contact attempts (over a 3-day period, at different times of day) to the participant or their representative. The first call should be made on the day of the decision. If you reach voicemail and the person identifies themselves, leave a brief message requesting they contact the NDIA on 1800 800 110. You must complete all required contact attempts, even if the number is disconnected.

Record an Interaction after each unsuccessful call attempt

  1. In the NDIS Account screen: Select Interactions.
  2. Select Add Items and then select Interaction.
  3. In Category 1: Select Pathway.
  4. In Category 2: Select Review.
  5. In Category 3: Select Eligibility Reassessment.
  6. In Channel: Select Internal Notes.
  7. In Status: Select Completed.
  8. In Notes:

<First/Second/Third/Forth/Fifth> phone call attempt made to <Participant or representative’s name> on at

Call not answered.

  1. Select Submit.

3.7.2 If all 5 contact attempts are unsuccessful

  1. Refer to SOP – Send SMS using Whispir messenger to send ‘Unsuccessful contact attempt’ SMS to advise you tried to call.

Note: Only send this SMS after you make all required call attempts.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 13 of 37 This document is uncontrolled when printed OFFICIAL

Page 162 of 260

Standard Operating Procedure

For Internal Use Only

Do not contact the person by SMS if they have told the Agency that they do not consent to this form of communication.

  1. Go to Step 3.8: Add interaction: Notify plan developer – Potential for adverse decision.

3.7.3 Call is answered

  1. Guide a respectful and transparent conversation, using the script:
  • Notify the participant that you are calling to update them about the progress of their eligibility reassessment.
  • Explain that we have considered all the available information (including new information if provided).
  • Note that the Eligibility Reassessment Commencement Letter was sent on , and call attempts were made on <date/s>.
  • Using the letter as a guide, explain that there is information that the participant may no longer meet the and/or requirements.
  • Explain that the NDIS invests in people with a disability to build capacity based on their individual goals. Some people achieve their goals and leave the NDIS with our support.
  • Explain that it is the participant’s or their representative’s responsibility to provide sufficient evidence that they still meet the eligibility requirements. If we do not receive this information, they may leave the NDIS.
  • Explain that it is our responsibility to help them understand what information we need to assess eligibility.
  • Explain that they have 28 days to provide further information. We will then contact them with an outcome.
  • Describe the types of information that would help to determine if they still meet the eligibility requirements.
  • Explain that if a participant is no longer eligible, their plan developer or <local area coordinator/early childhood partner> will support them to leave the NDIS and connect with community and government supports. Refer them to the plan developer or <local area coordinator/early childhood partner> for information about their plan and to prepare for the potential eligibility reassessment outcome.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 14 of 37

This document is uncontrolled when printed

OFFICIAL

Page 163 of 260

Standard Operating Procedure

For Internal Use Only

• Inform them that they will soon receive a letter explaining what has been discussed today and how they can provide more information. • After 28 days, we will make a decision based on the available information and let them know the outcome. • If the person asks for more time to provide information: Refer to SOP - Action evidence extension request for an Eligibility Reassessment. An extension of time will only be granted in exceptional circumstances. • If they no longer wish to be a participant of the NDIS: They will need to make this request in writing. Refer to SOP - Refer request to cease participant status during Eligibility Reassessment. The eligibility reassessment process will continue until we receive the written request. This includes receiving any letters generated as part of this process.

  1. Go to Step 3.7.4: Add interaction: ER – Potential for Adverse Decision

3.7.4 Add interaction: ER – Potential for Adverse Decision

  1. In the NDIS Account screen: Select Interactions.
  2. Select Add Items and then select Interaction.
  3. In Category 1: Select Pathway.
  4. In Category 2: Select Review.
  5. In Category 3: Select Eligibility Reassessment.
  6. In Channel: Select Internal Notes.
  7. In Status: Select Completed.
  8. In Notes:

Phone call made to redacted to advise of second chance to send evidence and the potential for an adverse decision. redacted

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 15 of 37 This document is uncontrolled when printed OFFICIAL

Page 164 of 260

Standard Operating Procedure

For Internal Use Only

  1. Select Submit.

3.8 Add interaction: Notify plan developer – Potential for adverse decision

  1. In the NDIS Account screen: Select Interactions.
  2. Select Add Items and then select Interaction.
  3. In Category 1: Select Pathway.
  4. In Category 2: Select Review.
  5. In Category 3: Select Eligibility Reassessment.
  6. In Channel: Select Internal Notes.
  7. In Status: Select Open.
  8. In Notes:

Interaction to notify plan developer of Eligibility Reassessment update.

Refer to Eligibility Re-Assessment Request for information about the status of the request.

Refer to SOP – Refer Participant for an Eligibility Reassessment or Access Status Change for information about the process. No action required. Plan developer to note and close interaction.

  1. Select Submit.
  2. Select Edit.
  3. Select Assign.
  4. Select Employee.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 16 of 37 This document is uncontrolled when printed

OFFICIAL

Page 165 of 260

Standard Operating Procedure

For Internal Use Only

  1. In Employee: Enter plan developer’s name with relationship type ‘My NDIS Contact’.

Note: Where there is not My NDIS Contact, assign interaction to the National Delivery Inbox (Return to SDP Inboxes) within the person’s geographical location.

  1. Select Assign.

  2. Select Submit.

The ER Request will now be on hold for 28 days (or longer if the person has been given more time to provide information).

3.9 Submit ER outcome: Maintain Access Status

3.9.1 Prepare decision template

  1. Open Template - Eligibility Reassessment - Maintain or Change Access Status.

  2. Complete fields in the relevant templates.

  3. Copy the completed template to paste into the Outcome Justification.

3.9.2 Update ER request: Maintain Access Status

  1. In Eligibility Reassessment Request: Select Edit.

  2. In Outcome: Select Maintain Access Status.

  3. In Outcome Justification:

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 17 of 37

This document is uncontrolled when printed

OFFICIAL

Page 166 of 260

Standard Operating Procedure

For Internal Use Only

.

.

  1. In Supporting Info:

Refer to Outcome Justification.

  1. In Reason for Maintain Access Status: Select reason from drop-down menu.
  • Disability and Residence Valid: Sufficient evidence the residence and disability requirements are met.
  • Early Intervention and Residence Valid: Sufficient evidence residence and early intervention requirements are met.

Note: Do not use Insufficient Evidence to Alter Decision, Record Ceased or Invalid Checklist/Checklist not provided.

  1. Select Submit.

  2. If your Maintain Access Status decision:

    • is not sent for quality checking: o Go to Step 3.12: Send letter: Access Status outcome.
    • is sent for quality checking: o Start working on another work item. Once quality feedback is returned, go to Step 3.11: Review quality check feedback: Access Status outcome (if sent for quality checking).

3.10 Submit ER outcome: Change Access Status (from EI to disability)

Changing the participant’s access status from early intervention to disability is not a decision under the NDIS Act. This means it is not a reviewable decision.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 18 of 37

This document is uncontrolled when printed

OFFICIAL

Page 167 of 260

Standard Operating Procedure

For Internal Use Only

If the participant joined the NDIS under disability requirements and now meets the early intervention requirements, their access status must be maintained. Do not change their access status.

3.10.1 Prepare Decision Template

  1. Open Template - Eligibility Reassessment - Maintain or Change Access Status.
  2. Complete fields in the relevant templates.
  3. Copy the completed template to paste into the Outcome Justification.

3.10.2 Update ER Request: Change Access Status

  1. In Eligibility Reassessment Request: Select Edit.

  2. In Outcome: Select Change Access Status.

  3. In Outcome Justification:

    .

    .

  4. In Supporting Info:

    Refer to Outcome Justification.

  5. In Access Decision Reason: Select Disability Met.

    Note: Benefit from Early Intervention, Exceptional Circumstances and Continuity of Supports are not applicable.

  6. In Access Decision Notes: Status Change from EI to Disability.

  7. Select Submit.

  8. If your change access status decision:

    • is not sent for quality checking:

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 19 of 37 This document is uncontrolled when printed

Page 168 of 260

Standard Operating Procedure

For Internal Use Only

  • Go to Step 3.12: Send letter: Access Status outcome.

  • is sent for quality checking:

  • Go to Step 3.11: Review quality check feedback: Access Status outcome (if sent for quality checking).

3.11 Review quality check feedback: Access Status outcome (if sent for quality checking)

After receiving the feedback, you are still responsible for making, documenting and implementing the decision.

  1. In the Business System Inbox: Select Quality Check Act task.
  2. Review the quality feedback provided:
  3. If you agree with the feedback:
    • Next to Acknowledged: Select Yes
    • Select Submit
    • Go to Step 5.
  4. If you need further clarification of the feedback, do not acknowledge it. Discuss it with your Team Leader, and if applicable, follow the reconsideration process. Do not proceed to Step 5 until this is resolved.
  5. Finalise the ER outcome, taking into consideration the quality check feedback.
  6. If the outcome continues to be either maintain or change access status, go to Step 3.12: Send letter: Access Status outcome.

3.12 Send letter: Access Status outcome

3.12.1 Prepare and send letter to participant

  1. Open and edit Letter – Eligibility Reassessment – Maintain or change access status.
  2. Send the letter to the participant or representative via their preferred correspondence method.

3.12.2 Attach letter to Inbound Documents

  1. Go to the NDIS Account screen: Select Documents.
  2. Select Add Items and then Inbound Documents.
  3. In Description: Letter – ER – Access Status outcome.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 20 of 37 This document is uncontrolled when printed

Page 169 of 260

Standard Operating Procedure

For Internal Use Only

  1. In Status: Select Completed.

  2. In Category 1: Select NDIA Service.

  3. In Category 2: Select Other Correspondence.

Employee Responsible: Enter your details.

Note: Letter <emailed/mailed> to <redacted> on <Date> by <User ID>.

  1. Select Upload File button under Attachments.

  2. In File Explorer window: Select the relevant document.

  3. Select Save.

  4. Go to Step 3.13: Contact participant or representative: Explain Access Status outcome.

3.13 Contact participant or representative: Explain Access Status outcome

Note: A representative could be the participant’s nominee or child representative. If the participant has a nominee, they will be listed as a contact as a Plan Nominee.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 21 of 37

This document is uncontrolled when printed

OFFICIAL

Page 170 of 260

Standard Operating Procedure

For Internal Use Only

3.13.1 Contact the participant or their representative

  1. Refer to SOP – Send SMS using Whispir messenger to send ‘Contact attempt SMS template’ to advise you will be calling.

Note: Do not contact the person by SMS if they have told the Agency that they do not consent to this form of communication.

  1. Make one telephone contact attempt to the participant, nominee or child representative. If you reach voicemail and the person identifies themselves, leave a brief message requesting they contact the NDIA on 1800 800 110.

3.13.2 If unsuccessful contact attempt

  1. Refer to SOP – Send SMS using Whispir messenger to send ‘Unsuccessful contact attempt’ SMS to advise you tried to call.

Note: Do not contact the person by SMS if they have told the Agency that they do not consent to this form of communication.

  1. Go to Step 3.13.4: Update the ER Alert End Date.

3.13.3 If the call is answered

  1. Guide a respectful and transparent conversation. Use the letter and script as a guide:
  • Notify the person that you are calling to update them on the outcome of their Eligibility Reassessment.
  • Advise the person that we have completed a review of their eligibility, and that they continue to meet the eligibility requirements.
  • If Change Access Status: Advise the person that they originally met the requirements for early intervention and based on the available information, they now meet the disability requirements.
  • If Maintain Access Status: Advise the person that based on the available information, they continue to meet the residence and or requirements.
  • This means that they will continue to be a participant of the NDIS and there will be no change to their current supports.
  • If the person has any questions about their plan or funding, refer them to their <local area coordinator/early childhood partner/NDIA planner>.
  1. Go to Step 3.13.4 Update the ER Alert End Date

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 22 of 37 This document is uncontrolled when printed OFFICIAL

Page 171 of 260

Standard Operating Procedure

For Internal Use Only

3.13.4 Update the ER Alert End Date

  1. In the NDIS Account screen: Select Internal Use.
  2. Select Plan Alerts.
  3. Select the Eligibility Reassessment alert.
  4. In End Date: Edit to today’s date.
  5. Select Submit.

3.13.5 Add Interaction: Maintain or Change Status

  1. In the NDIS Account screen: Select Interactions.
  2. Select Add Items and then select Interaction.
  3. In Category 1: Select Pathway.
  4. In Category 2: Select Review.
  5. In Category 3: Select Eligibility Reassessment.
  6. In Channel: Select Internal Notes.
  7. In Status: Select Completed.
  8. In Notes:

Phone call made to redacted to advise them that the Eligibility Reassessment is now complete.

redacted access status has been <maintained/changed from early intervention to disability>. redacted OR .

  1. Select Submit.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 23 of 37 This document is uncontrolled when printed OFFICIAL

                          Page 172 of 260

Standard Operating Procedure

For Internal Use Only

  1. Go to Step 3.14: Check/update primary and secondary disabilities.

3.14 Check/update primary and secondary disabilities

The Disabilities tab needs to reflect only the disabilities where the participant meets disability or early intervention requirements, as this is important for the planning stage.

You need to confirm that their eligible impairments are reflected correctly in the business system. This includes listing any other eligible impairments in both the Primary Disability and Secondary Disabilities tab.

3.14.1 View Disabilities screen

  1. In the NDIS Account screen: Select Disabilities.
  2. In Disabilities: Select the > next to Secondary.
  3. In Disabilities: Select the > next to Primary.

Note: To view both the primary and secondary disabilities at the same time, open the Secondary tab first, followed by the Primary.

Note: This screen will list all current and previous primary and secondary disabilities. Take note of the Effective Start and Effective End dates to determine what disabilities are current.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 24 of 37 This document is uncontrolled when printed

Page 173 of 260

Standard Operating Procedure

For Internal Use Only

3.14.2 Consider if the listed primary disability still meets the eligibility requirements

  1. Consider if there is sufficient evidence the primary disability meets the eligibility requirements:

  2. If primary disability no longer meets the disability or early intervention requirements:

    • Go to Step 3.14.3: [Update primary disability](Step 3.14.3).

  3. If primary disability continues to meet the disability or early intervention requirements:

    • Go to Step 3.14.6: Consider if any secondary disabilities no longer meet the eligibility requirements.

Note: If the existing primary disability continues to meet the eligibility requirements, and there are additional disabilities that also meet eligibility, do not change the primary disability.

3.14.3 Update primary disability

Do not delete the previous primary disability. When the primary disability is changed, this will automatically apply an end date to the previous primary disability.

3.14.4 If primary disability is listed as a secondary disability:

  1. In Secondary: Select the Convert to Primary Disability icon.

  2. Complete additional fields (if known).

  3. Select Submit.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 25 of 37 This document is uncontrolled when printed

Page 174 of 260

Standard Operating Procedure

For Internal Use Only

3.14.5 If the primary disability is not listed as a secondary disability

  1. In the NDIS Account screen.
  2. Select Add Items and then select Disability.
  3. In Reported Impairment: Start typing the disability and select when displayed. Note: Alternatively, select from the list of disabilities.
  4. Next to Primary: Select the checkbox.
  5. Complete additional fields (if known).
  6. Select Submit.

3.14.6 Consider if any secondary disabilities no longer meet the eligibility requirements

  1. Consider if there is sufficient evidence that any secondary disabilities continue to meet the eligibility requirements:
  2. If a secondary disability no longer meets the disability or early intervention requirements: • Go to Step 3.14.7: Update Effective End date for secondary disability.
  3. If the secondary disabilities continue to meet the disability or early intervention requirements: • Go to Step 3.14.8: Consider if additional secondary disabilities meet the disability or early intervention requirements.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 26 of 37 This document is uncontrolled when printed OFFICIAL

Page 175 of 260

Standard Operating Procedure

For Internal Use Only

  1. If there are no secondary disabilities listed:
  • Go to Step 3.14.8: Consider if additional secondary disabilities meet the disability or early intervention requirements.

3.14.7 Update Effective End date for secondary disability

  1. Select relevant disability.

  2. In the Effective End date: Update to current date.

  3. Select Submit.

Note: The disability will show within Secondary Disabilities with an end date.

3.14.8 Consider if additional secondary disabilities meet the disability or early intervention requirements

  1. Consider if there is sufficient evidence that an additional secondary disability meets the disability or early intervention requirements:

  2. If an additional secondary disability meets the disability or early intervention requirements:

  • Go to Step 3.14.9: Add secondary disability.
  1. If there is insufficient evidence that any additional disabilities meet the disability or early intervention requirements:
  • Go to Step 3.15: Add interaction: Notify plan developer – ER outcome.

3.14.9 Add secondary disability

  1. In the NDIS Account screen.

  2. Select Add Items: Select Disability.

Standard Operating Procedure

For Internal Use Only

  1. In Reported Impairment: Start typing the disability and select when displayed.

Note: Alternatively, select from the list of disabilities.

  1. Next to Primary: Do not select the checkbox.

  2. Complete additional fields (if known).

Note: Do not adjust the Effective End date as it will auto-populate with 31.12.9999.

  1. Select Submit.

  2. Go to Step 3.15: Add interaction: Notify plan developer – ER outcome.

3.15 Add interaction: Notify plan developer – ER outcome

  1. In the NDIS Account screen: Select Interactions.

  2. Select Add Items and then select Interaction.

  3. In Category 1: Select Pathway.

  4. In Category 2: Select Review.

  5. In Category 3: Select Eligibility Reassessment.

  6. In Channel: Select Internal Notes.

  7. In Status: Select Open.

  8. In Notes:

Interaction to notify plan developer of Eligibility Reassessment update.

Refer to Eligibility Re-Assessment Request for information about the status of the request.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 28 of 37

This document is uncontrolled when printed

OFFICIAL

Page 177 of 260

Standard Operating Procedure

For Internal Use Only

Refer to SOP – Refer Participant for Eligibility Reassessment or Access Status Change ER for information about the process.

No action required. Plan developer to note and close interaction.

  1. Select Submit.
  2. Select Edit.
  3. Select Assign.
  4. Select Employee.
  5. In Employee: Enter the plan developer’s name (Contact with relationship type My NDIS Contact).

Note: Where there is no My NDIS Contact, assign the interaction to the National Delivery Inbox (Return to SDP Inboxes) within the person’s geographical location. 14. Select Assign.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 29 of 37 This document is uncontrolled when printed OFFICIAL

Page 178 of 260

Standard Operating Procedure

For Internal Use Only

  1. Select Submit.

End of process – no further steps to be completed.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 30 of 37

This document is uncontrolled when printed

OFFICIAL

Page 179 of 260

Appendices

4.1 The Legislation

While the NDIS provides lifetime disability support for many participants, others build capacity and achieve their goals to the extent that they no longer meet the eligibility requirements and leave the NDIS.

This SOP provides instructions for when an Access Assessor (AA) receives an ER referral from a plan developer indicating that the participant:

  • may not meet the residence requirements (section 23)

Or

  • may not meet the disability requirements (section 24) and early intervention requirements (section 25)

Or

  • joined the NDIS under the early intervention requirements (section 25) and may now meet the disability requirements (section 24).

All participants must continue to meet the residence requirements and the disability or the early intervention requirements.

There are some exceptions to when an ER should be undertaken:

  • If the participant joined the NDIS under the NSW Prescribed Program Rules, their NDIS access should not be revoked based on residence requirements. This also includes participants who joined the NDIS under these rules, but now reside in another state or territory. For these participants, ER can only be based on the disability and early intervention requirements.
  • If the AAT has previously made a determination relating to the participant’s access to the NDIS, seek advice from a QDO Team Leader before commencing an ER.

The QDO Team Leader will seek advice from TAB/Legal as required. QDO Team Leader advice is not required if you are maintaining or changing access status.

4.2 Independent Delegate

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 31 of 37 This document is uncontrolled when printed OFFICIAL

Page 180 of 260

Standard Operating Procedure

For Internal Use Only

The AA that decides whether to commence or undertakes an ER must be independent. That is, they will not have:

  • a personal interest in the participant’s status, or
  • a personal relationship with the participant (outside the NDIA), or
  • must not have been involved in making the original access decision or any planning decisions.

An AA can be involved in any or all stages of the ER process.

4.3 ER Outcomes

There are 2 ER outcomes under (s 30(1), NDIS Act). They are:

  1. To exercise the power to revoke a person’s access, which includes:
    • revoking participant status.
  2. To not exercise the power to revoke a person’s access, which includes:
    • maintaining access status, or
    • changing access status.

Note: To not exercise the power to revoke a person’s access is not a reviewable decision.

4.3.1 Access status outcome

  • Maintain: A person maintains their participant status when they continue to meet the access requirements they joined the NDIS under. Or, if they joined the NDIS under disability requirements and now meet the early intervention requirements.
  • Change: A person’s status is changed from early intervention to disability when the participant who joined the NDIS under early intervention requirements now meets the disability requirements.

Note: Changing access status is not a decision under the NDIS Act. It is also considered maintaining access status.

4.3.2 Revoke outcome

If an AA is satisfied a person no longer meets the residence and/or disability and early intervention requirements, their status as a participant will be revoked (section 30).

A person ceases to be a participant in the NDIS when their status is revoked under section 30. A revocation decision will take effect from the date of the decision notice.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 32 of 37 This document is uncontrolled when printed

OFFICIAL

Page 181 of 260

FOI 22/23-1046

OFFICIAL

Standard Operating Procedure

For Internal Use Only

A person must not use NDIS funds to purchase reasonable and necessary supports for the participant after they cease to be an NDIS participant (section 29(2)).

The decision to revoke a person’s status as a participant is a reviewable decision (section 99, Item 3). This means that the decision may be internally reviewed by a delegate of the CEO (section 100) and subsequently externally reviewed by the Administrative Appeals Tribunal (AAT) (section 103).

It is very important, from an administrative law perspective, that the process leading to a revocation decision is procedurally fair. Procedural fairness includes a variety of actions and may change dependent on the participant’s individual situation. Some of these actions relating to ER may include:

  • ensuring a clear explanation outlining the reasons for a potential revocation decision
  • providing the participant a reasonable opportunity to provide information to present their case
  • providing guidance to the participant around the types of information/evidence which may assist their case
  • properly considering any Extension of Time Request, and granting this request where reasonable.

4.4 The Process

4.4.1 Plan developer refers the participant for ER or Access Status Change

A person’s NDIS participant status may be reassessed:

  • as part of the plan reassessment process, or
  • at any other time.

Plan developers must consider whether the participant should be referred for ER, or an Access Status Change is required, as part of the plan reassessment process. This involves completion of Checklist – Eligibility Reassessment – Disability or Checklist – Eligibility Reassessment or Access Status Change – Early Intervention with reference to relevant information on the participant’s record. The checklist is attached to the participant’s record before the plan developer completes an ER referral.

Note: An AA must not commence the ER process if there is no checklist attached.

4.4.2 Access Assessor determines if ER is required

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 33 of 37 This document is uncontrolled when printed OFFICIAL

Page 182 of 260

Standard Operating Procedure

For Internal Use Only

Upon receipt of an ER referral, the AA will consider whether the participant is likely to continue to meet the residence and disability or early intervention requirements. They do this by assessing all available information against the legislative requirements.

4.4.3 Access Assessor completes ER

An ER is commenced when the information indicates that the participant may not meet the eligibility criteria. The AA will contact the participant (or their representative) by phone and in writing to outline the reasons why the person may not meet eligibility criteria. It is important that the participant understands the specific reasons why they may not meet these criteria, and what information they can provide to support their case.

The AA must explain to the participant that it is their responsibility to prove they meet the eligibility criteria. It is the AA’s responsibility to help the participant understand the type of information we need to assess eligibility. If we do not have clear information that the person continues to meet the eligibility criteria, their access will be revoked.

The plan developer will also be notified of the progress of the ER request and any required actions via an Interaction. The AA also has the option to contact the plan developer by phone if there are any sensitivities or risks.

During the ER process, the participant will have two, 28-day opportunities to provide further information to support their continued eligibility. In exceptional circumstances, they can request an extension of time to provide this information.

4.4.4 Access Assessor determines outcome

The AA will assess all available information against the legislative requirements and decide if the participant’s access status should be:

  • Access status outcome:
    • maintained (including disability to early intervention),
    • changed from early intervention to disability,
    • Revoked outcome.

All revocation decisions, and some maintain or change status decisions, will be referred to a QDO for quality checking before being finalised.

The AA will explain the reasons for the outcome to the participant (or their representative) by having a conversation (where required contact attempts are successful) and sending them a letter. The plan developer will also be notified of the ER outcome. If the participant’s status is revoked, the plan developer must support them to leave the NDIS and find other community and government supports.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 34 of 37 This document is uncontrolled when printed

Page 183 of 260

Standard Operating Procedure

For Internal Use Only

Throughout the ER process, it’s important there is no disruption to the participant’s supports and services.

  • Our Guideline – Applying to the NDIS
  • Our Guideline – Leaving the NDIS
  • SOP – Request technical advice to progress an Eligibility Reassessment
  • SOP - Consider commencement of Eligibility Reassessment or Access Status Change
  • SOP - Make Eligibility Reassessment decision
  • SOP - Action evidence extension request for an Eligibility Reassessment
  • SOP - Action call back request for an Eligibility Reassessment
  • SOP - Refer request to cease participant status during Eligibility Reassessment
  • SOP - Check for procedural fairness in an Eligibility Reassessment
  • SOP - Complete Eligibility Reassessment missed steps
  • SOP - Check for remote or very remote address
  • Letter – Eligibility Reassessment – Commencement - 1st opportunity to respond
  • Letter – Eligibility Reassment – Potential for adverse decision – 2nd opportunity to respond

6. Feedback

If you have any feedback about this Standard Operating Procedure, please complete our Feedback Form.

V3.0 2022-11-29 Consider ER outcome following 1st chance to respond Page 35 of 37 This document is uncontrolled when printed OFFICIAL

Page 184 of 260

Version control

For Internal Use Only

Version Amended by Brief Description of Change Status Date
V1.0 LNL387 Class 3 PCC approval APPROVED 2022-09-20
SMO0075 Class 3 ND approval
GO0002 Class 3 PXD approval
Updates to align with Our Guideline — Leaving the NDIS.
SOP — Undertake eligibility reassessment separated into 7 SOPs.
Improved messaging about the participant’s responsibility to provide information to support their eligibility.
Improved messaging about our responsibility to help the participant understand the information we need to assess eligibility.
Information about requesting technical advice from a QDO or TAB, and align mandatory requests for ER with access decisions.
Steps added to maintain or change access status.
Updated letter file names (internal) to plain English
Improved formatting to highlight pre-checks
Links to new Leaving SOPs

| V2.0 | EMN960 | Class 1 approved. Update Checklist — Pre-requisites “checked all pre-checks were completed using SOP — Check for Eligibility Reassessment missed steps” to SOP - Consider commencement of Eligibility Reassessment or Access Status Change. | APPROVED | 2022-11-03 |

V3.0 2022-11-29 Consider ER outcome following 1° chance to respond Page 36 of 37

This document is uncontrolled when printed

Standard Operating Procedure

For Internal Use Only

Version Amended by Brief Description of Change Status Date
V3.0 EMN960 Class 1 approved. Updates to:
  • e outcome justification template to include evidence that was considered when making decision
  • e notes sections ‘choose an item’ field is not currently a drop down
  • e introduction to strengthen intent of SOP
  • e formatting, screenshots, links and grammar. | APPROVED | 2022-11-29 |

V3.0 2022-11-29 Consider ER outcome following 1° chance to respond Page 37 of 37

This document is uncontrolled when printed

OFFICIAL

Page 186 of 260

Comments

Loading comments…

What kind of comment is this?
Add a comment