Inquiry Recommendation Australian Government Response Recommendation – as at [DD Month YYYY]

‹ PrevPage 1 of 6 · Source p. 288Next ›
Comments

Inquiry Recommendation

Australian Government Response Recommendation – as at [DD Month YYYY]

Inquiry Name: Inquiry into Services, support and life outcomes for autistic Australians

Committee: Senate Select Committee on Autism

Recommendation: The committee recommends that the National Disability Insurance Agency work with relevant stakeholders to review the Specialist Disability Accommodation Design Standard to ensure it accounts for the sensory issues experienced by autistic participants.

Government Response: Following extensive feedback from the developing the Specialist Disability Accommodation (SDA) market for greater certainty in the process, the NDIA engaged Liveable Housing Australia (LHA) to develop a technical guide for expanding the amount of relevant detail available for the build of SDA dwellings.

The SDA Design outlines the detailed design requirements for newly built SDA seeking enrolment under the NDIS.

This standard has four categories of SDA design, as set out in the SDA Rules (2020):

  • Improved Liveability
  • Robust
  • Fully Accessible
  • High Physical Support

In particular, the SDA type ‘Improved Liveability’ has been designed to improve ‘Liveability’ by incorporating a reasonable level of physical access and enhanced provision for people with sensory, intellectual or cognitive impairment.

The SDA Design Standard will be reviewed in 2023.

OFFICIAL

Contact Officer/s: Implementation Plan: Please provide a reference, link or attachment to this record for the implementation plan completion for this recommendation. Planned Implementation Date: [DD Month YYYY] Key Milestone Dates and Deliverables: Update and Status as at [DD Month YYYY]: Please advise if you have met the most recent milestone, and if not, why along with how you’re tracking towards the next milestone. If finalised/completed, please fill in under “Evidence of completion”.

               (Status key is located on the final page)

                         Page 294 of 344

Evidence of completion

Outline a summary of actions undertaken to implement the recommendation.

The summary of actions should clearly align with the intent (implicit or explicit) of the recommendation as specified in the Australian Government Response (AGR). The completion pack should also include the activities that you—as the responsible officer for the recommendation—has performed to confirm that the recommendation has been implemented as specified in the AGR.

Provide clear and demonstrable evidence to support the case that all aspects of the recommendation have been fully addressed, including a chronology where possible. Examples of evidence could include a minute (EC in PDMS) noting:

  • The Government introduced XX legislation on XX date (linked to the Federal Register of Legislative Instruments), which addressed the recommendation by—describing the—and how—:

  • xx; and

  • xx.

  • The 20XX-XX Budget (MYEFO) funded $XXX to implement xx. This supports the implementation of this recommendation by xx (EC/MC/MSXX-XXXXXX refers).

  • The xx program that was implemented on xx date supported the recommendation through xx…

  • The National Disability Insurance Agency implemented xx initiative on xx date, which provides xx and does xx.

Please ensure all relevant documentation that supports the completion of this recommendation is referenced and saved appropriately. • PDMS is an approved record-keeping system and documents can be attached to this PDR. You can also link to other relevant PDRs or to publicly available information, or reference documents saved in other record-keeping systems such as HPE content manager. • The retention of these records will ensure that appropriate evidence is available to management and to the Australian National Audit Office as part of their regular performance audits on the implementation of committee inquiries’ recommendations.

Background/Issues

Provide relevant background and include any issues the Deputy CEO should be aware of in relation to the implementation.

Please remove all purple text prior to completing this form and use: Arial (Body) 12pt Black

Clearance

Name Role Date Cleared
Director DD/MM/YYYY
Branch Manager DD/MM/YYYY
General Manager DD/MM/YYYY

Deputy Secretary Clearance – last clearing officer

Deputy CEO Last Clearance Date

The table above is populated from PDMS and will show the last clearing officer’s name which needs to be your Deputy CEO.

Status Key

  • On Track (Green circle) The recommendation is on track for implementation by the agreed date and the risks are being managed while the implementation is underway.
  • Problematic (Amber circle) One or more elements of the recommendation’s implementation by the agreed date requires substantial attention or the risks are not being managed while the implementation is underway.
  • Urgent and decisive action is required (Red circle) Significant elements of the recommendation warrant urgent attention due to the inherent risks associated with the findings, or implementation of the recommendation by the agreed date has failed or is likely to fail.
  • Finalised (Purple triangle) This recommendation need not be included in future reports. The responsible Deputy Chief Executive Officer has agreed with the implementation progress, approved the archiving and accepted any residual risk. Finalised recommendations will not be included in future reports.

Page 297 of 344

Comments

Loading comments…

What kind of comment is this?
Add a comment