Inquiry Recommendation Australian Government Response Recommendation – as at [DD Month YYYY]

‹ PrevPage 1 of 7 · Source p. 294Next ›
Comments

Inquiry Recommendation

Australian Government Response Recommendation – as at [DD Month YYYY]

Inquiry Name: Inquiry into Services, support and life outcomes for autistic Australians

Committee: Senate Select Committee on Autism

Recommendation: The committee recommends that the National Disability Insurance Agency work with state and territory governments and non-government housing providers to increase the supply of the ‘robust’ category of Specialist Disability Accommodation.

Government Response: In 2019 the NDIA undertook a limited cost assumptions review of Specialist Disability Accommodation (SDA) pricing, specifically to identify where market supply was not increasing as expected. One result from this review was to increase the SDA price caps for ‘robust’ dwellings of between 9.4 per cent and 14.1 per cent. Since that

OFFICIAL

At this time, a steady increase in supply has been achieved. There are currently 441 dwellings enrolled in the ‘robust’ category.

SDA dwelling enrolment data also indicates that there are currently 334 brand new dwellings (equivalent to 624 rooms) under construction, which are intended to be enrolled in the ‘robust SDA’ category. These are being built by registered SDA providers including community housing providers and developers who are yet to engage or register as an SDA provider.

The NDIA also undertakes regular market development activities, most recently focussed on supporting both state and territory governments and other SDA providers to consider and develop renewal programs of their existing SDA stock. In the majority this stock is ageing, and as more contemporary homes are established using the SDA Design Standard, this need for redevelopment or refurbishment is increasing.

The SDA Pricing Review was scheduled to take place through the first half of 2023, however a decision has been made to commence this earlier to support investor and market confidence. Robust SDA pricing will be considered as part of the price review. Any changes from the review will only come into effect from 1 July 2023.

— PAGE TEXT END –

OFFICIAL

The NDIA is continuously improving the structured data available on SDA and continues to work with states and territories to ensure housing and accommodation is available for NDIS participants, including ensuring participants have access to affordable, accessible, and appropriate housing.

Page 300 of 344

OFFICIAL

Contact Officer/s: Implementation Plan: Please provide a reference, link or attachment to this record for the implementation plan completion for this recommendation. Planned Implementation Date: [DD Month YYYY] Key Milestone Dates and Deliverables: Update and Status as at [DD Month YYYY]: Please advise if you have met the most recent milestone, and if not, why along with how you’re tracking towards the next milestone. If finalised/completed, please fill in under “Evidence of completion”.

               (Status key is located on the final page)

                         Page 301 of 344

Evidence of completion

Outline a summary of actions undertaken to implement the recommendation.

The summary of actions should clearly align with the intent (implicit or explicit) of the recommendation as specified in the Australian Government Response (AGR). The completion pack should also include the activities that you—as the responsible officer for the recommendation—has performed to confirm that the recommendation has been implemented as specified in the AGR.

Provide clear and demonstrable evidence to support the case that all aspects of the recommendation have been fully addressed, including a chronology where possible. Examples of evidence could include a minute (EC in PDMS) noting:

  • The Government introduced XX legislation on XX date (linked to the Federal Register of Legislative Instruments), which addressed the recommendation by—describing the—and how—:

  • xx; and

  • xx.

  • The 20XX-XX Budget (MYEFO) funded $XXX to implement xx. This supports the implementation of this recommendation by xx (EC/MC/MSXX-XXXXXX refers).

  • The xx program that was implemented on xx date supported the recommendation through xx…

  • The National Disability Insurance Agency implemented xx initiative on xx date, which provides xx and does xx.

Please ensure all relevant documentation that supports the completion of this recommendation is referenced and saved appropriately. • PDMS is an approved record-keeping system and documents can be attached to this PDR. You can also link to other relevant PDRs or to publicly available information, or reference documents saved in other record-keeping systems such as HPE content manager. • The retention of these records will ensure that appropriate evidence is available to management and to the Australian National Audit Office as part of their regular performance audits on the implementation of committee inquiries’ recommendations.

Background/Issues

Provide relevant background and include any issues the Deputy CEO should be aware of in relation to the implementation.

Please remove all purple text prior to completing this form and use: Arial (Body) 12pt Black

Clearance

Name Role Date Cleared
Director DD/MM/YYYY
Branch Manager DD/MM/YYYY
General Manager DD/MM/YYYY

Deputy Secretary Clearance – last clearing officer

Deputy CEO Last Clearance Date

The table above is populated from PDMS and will show the last clearing officer’s name which needs to be your Deputy CEO.

Status Key

  • On Track (Green circle) The recommendation is on track for implementation by the agreed date and the risks are being managed while the implementation is underway.
  • Problematic (Amber circle) One or more elements of the recommendation’s implementation by the agreed date requires substantial attention or the risks are not being managed while the implementation is underway.
  • Urgent and decisive action is required (Red circle) Significant elements of the recommendation warrant urgent attention due to the inherent risks associated with the findings, or implementation of the recommendation by the agreed date has failed or is likely to fail.
  • Finalised (Purple triangle) This recommendation need not be included in future reports. The responsible Deputy Chief Executive Officer has agreed with the implementation progress, approved the archiving and accepted any residual risk. Finalised recommendations will not be included in future reports.

Page 304 of 344

Comments

Loading comments…

What kind of comment is this?
Add a comment