QUESTION TIME BRIEF
Inklings program
Key Messages
What is the Inklings program?
- The Inklings program is in line with recommendations from the NDIS Review, including early supports for children with emerging developmental concerns and child development checks.
- The Inklings program focuses on building the skills of parents and families to understand how best to communicate with their baby and understand their baby’s thoughts and feelings by using infant-led interactions, and building skills on how to follow their baby’s focus of interest.
- The Inklings program provides an environment for parents, carers, and families to support and nurture their baby’s development and foster greater confidence, connection and belonging. It is crucial for families to be able to understand how their child communicates and to know their strengths from an early age.
- The pilot uses a range of resources, targeted to parents and families, such as short videos to help parents better develop their own strategies to engage and support their child.
- Inklings has evolved from the Video-feedback Intervention to promote Positive Parenting (VIPP) therapy, emanating from Leiden University in The Netherlands. The efficacy and safety of VIPP has been shown through a number of trials.
Facts And Figures
- In April 2023, Minister Shorten announced the Telethon Kids Institute will deliver a pilot program examining whether earlier intervention for babies showing early differences in their social and communication skills will lead to better outcomes for infants and families.
- The pilot will enable approximately 700 families in Western Australia to participate. Participation in the program is voluntary, by referral from Western Australian health services.
- The pilot, funded by the NDIA, will look at the effects the program has on babies between 6-18 months and their families, and benefits over time to a broad cohort of children.
- The program is based upon initial research conducted by the Perth-based Telethon Kids Institute with La Trobe University and the Western Australia Child and Adolescent Health Service, which yielded promising results.
- The grant is valued at $13.8 million (inclusive of GST) over 3 years and commenced in July 2023.
- The NDIA is monitoring the progress of the pilot in accordance with the grant conditions. The NDIA will also lead the evaluation of the program. The evaluation will inform any future investment in the model.
Potential Hot Issues
If Asked – About the South Australian Government Pilot
- On 31 January 2024, Minister Rishworth jointly announced with the South Australian Government a pilot of the Inklings program in metropolitan, rural and remote South Australia, supporting up to 1,300 infants between the ages of 6 to 18 months. Delivery of this pilot was a key recommendation of South Australia’s Royal Commission into Early Childhood Education and care.
- The Commonwealth Government will contribute up to $8.4 million to deliver the first of the two pre-emptive early intervention pilots, in SA over 2023–24 to 2026–27.
- The South Australian Government’s total financial and in-kind contribution to the pilot is $6.473 million.
- A joint investment of $14.8 million has been committed to fund the pilot in South Australia.
If Asked – About community and sector criticism of the pilot models
- Some members of the Autistic community have expressed concerns about whether the Inklings program is ‘best practice’ and the possibility of adverse impacts of the pilot on Autistic babies.
- Inklings has the highest quality evidence available for a social communication program in this age group.
- The program develops the skills of parents and caregivers to engage and communicate with their babies in a way that is directed by the unique needs of each child.
- The pilots are being undertaken with ethics approval.
- The NDIA will be evaluating the Western Australian pilot.
What consultation was undertaken with the autistic communities?
-
Engagement was undertaken with states and territories to explore their interest in a piloting a ‘pre-emptive’ program for babies to support them and their families to meet their development milestones. This led by the Department of Social Services.
-
Following initial scoping of ‘pre-emptive’ programs with an evidence base that focus on development for babies and which are currently available in Australia, it was found there were limited interventions.
-
The pilot in Western Australia is being undertaken in partnership with WA Child and Adolescent Health Services and WA Country Health Service.
How does the Inklings Program align to the draft National Autism Strategy?
-
The Draft National Autism Strategy has been released for public consultation and will be further refined based on feedback provided. The final strategy is expected to be presented to the Government by the end of 2024.
-
Commitment 16, of the draft National Autism Strategy, aims to “improve access to quality, timely, neurodiversity-affirming and equitable supports and services for Autistic people, including for people living in rural, regional and remote areas”.
-
The Inklings program is designed for very young children aged 6 to 18 months and their families. It is designed for parents or carers to build their own strengths as a responsive communication partner for their baby providing an environment in which their child can flourish.
-
It does not aim to change a baby’s behaviours or to prescribe a specific neurotypical outcome for the child. Rather, the approach uses baby-led interactions and follows the child’s focus of interest to promote enjoyable and meaningful interactions between baby and parent.
If asked: How will the Pilot support First Nations families?
-
Telethon Kids Institute is currently leading a First Nations’-focussed consultation in Western Australia to hear First Nations’ perspectives on the accessibility, suitability, and cultural safety of the Inklings program across metropolitan, regional, and remote communities across the state. The consultation project will inform potential adaptations to enhance the cultural safety and accessibility of the program for First Nations’ families. The consultation will also inform the suitability of the program for regional and remote communities in Western Australia.
-
Inklings will not be rolled out in First Nations communities until this consultation, which is expected to take 12 months, is concluded.
If asked: What else will the NDIA be doing to support children and their families outside of the Scheme?
-
The NDIS Review makes a number of recommendations and actions to reform systems of support for children and their families in Australia, both within and outside the NDIS.
-
The main focus of these recommendations is improving connections with mainstream and other services, and making sure children receive early intervention supports that are effective in maximising their social independence and supporting them to participate in their communities.
-
The Government will take the time to consider the review’s recommendations. Our reforms will be well planned, well governed and designed and delivered in partnership with people with disability and the disability community.
Contact and Clearance Information
Contact: Janice Biggs, Evidence and Practice Leadership Branch | redacted Cleared by: Samantha Taylor, General Manager, Policy, Evidence and Practice Leadership Division | redacted Date created: 14/02/2024| Last Updated: 10/05/2024 Date cleared in MO: 13/05/2024
🚩 Suggested fixes
Comments
Loading comments…
Comments are temporarily disabled.