  • Plan implementation conversations is a CI Connect module created by the Frontline Learning team.

  • You’ll need approximately 45 minutes with limited distractions to complete this eLearning.

  • You can complete the eLearning in multiple sessions and your progress will be saved. Once complete, you can revisit the content anytime.

  • This eLearning is not formally assessed but you may find knowledge check activities throughout. Knowledge check activities can be attempted multiple times.

  • This eLearning is the only component of this module. Once you successfully complete this eLearning, you will have completed the Plan implementation conversations module.

INTRODUCTION

  • Accessibility and navigation

  • Learning objectives and success criteria

PLAN IMPLEMENTATION MEETINGS

  • Recognising opportunities for improvement

  • Plan implementation meeting refresher

  • The impacts of plan implementation meetings

  • Plan implementation best practice

SCENARIOS

  • Scenarios introduction

  • Scenario 1: Rasha receives a complaint

  • Scenario 2: Mariana reviews a request

  • Scenario 3: Nathan receives an enquiry

CONCLUSION

  • Summary

  • Was this helpful?

  • Feedback and exit

Lesson 1 of 13

Accessibility and navigation

First things first

Here is some important accessibility information before you begin.

  • To navigate through the course simply scroll down and select the CONTINUE button at the end of each section.

  • When the CONTINUE button is selected it will vanish and you will be able to move freely between sections of the course you have already completed, as well as access the next section that has been unlocked.

  • If you need to stop, the best time to take a break is at a CONTINUE marker button, as it will be easier for you to remember your thoughts upon resuming.

  • All hyperlinks will open in a new browser tab.

  • This course is optimised for screen readers. JAWS, NVDA, VoiceOver, and TalkBack are all enabled.

  • Closed captioning has been enabled and is accessible on most videos, by selecting the CC option.

  • This course contains audio. We suggest using headphones.

Alternative instructions for using your keyboard

Screen reader users please note: some of the following keystrokes may require the use of the passthrough key to work. For JAWS users select JAWS key 3 followed by the desired keystroke.

Text, Statement, Quote and List blocks

  • Use the Up and Down arrow keys to scroll through text.

  • Use the Left and Right arrow keys to flip through quote carousels.

  • Select Enter or the spacebar to check and uncheck boxes in checkbox lists.

  • Use the Left and Right arrow keys to flip through image carousels.

  • To zoom into an image, use Tab or Shift+Tab to select it, then select Enter or the spacebar.

  • To zoom out of an image, select Enter, the spacebar, or Esc.

Multimedia blocks

  • For audio blocks, select the spacebar to play and pause the media.

  • For a web page, select Enter to open it in a new browser tab.

  • For an attachment, select Enter to download it.

  • For a code snippet, use the Up and Down arrows to scroll through the text.

Interactive buttons

  • Use Tab or Shift+Tab to select a button.

  • Select Enter to activate the button.

For further screen reader keyboard navigation instructions please follow this link.

Lesson 2 of 13

Learning objectives and success criteria

Introduction

This module reminds us of the importance of quality plan implementation, in particular, a clear, transparent and effective plan implementation conversation, and the impact it can have on the participant, their stakeholders, our colleagues and partners and Scheme sustainability.

Learning objectives

Learning objectives are short statements that describe what you will learn from this module. You can think of them as a list of ‘things I will learn’

After completing this module, you will understand:

  • the importance of an effective plan implementation conversation

  • the risks and consequences of not having an effective plan implementation conversation

  • the consequences of a poor plan implementation conversation

  • the roles and hand-off points in plan implementation

  • the features of a quality plan implementation conversation

  • the requirements of clear and detailed handover notes

  • how and where to record the details of a plan implementation conversation, and what to document

  • how to have difficult conversations.

Success criteria

Success criteria are measurable action statements. They are sometimes used to support assessment. You can think of them as a list of ‘things I will be able to do’

After completing this module, you will be able to:

  • identify our legislative obligations to involve participants in plan implementation

  • identify the roles and hand-off points

  • identify the benefits of a quality plan implementation meeting

  • explain the impacts that failing to have a plan implementation conversation can have on other work areas

  • explain the impacts that a poor plan implementation conversation can have on other work areas

  • explain the impact of poor plan implementation on Scheme sustainability

  • identify the features of a quality plan implementation conversation

  • conduct a quality plan implementation conversation

  • record clear and detailed handover notes, as required

  • accurately record the details of a plan implementation conversation.

Lesson 3 of 13

Recognising opportunities for improvement

Like all CI Connect modules, this module aims to address opportunities for improvement that have been identified by Agency staff, our participants, their families, carers and nominees.

Plan implementation is an important step in the journey for participants, their families and supports, and it is one we need to do well to deliver the best possible outcomes.

The interaction below has 3 items. Select each item to explore the findings from recent Engagement and Inclusion Branch activities about participants’ experiences with plan implementation meetings.

Questions

45% of questions from engagements are related to people not knowing how to use their plan and potential underutilisation due to this lack of knowledge.

Feedback

20% of feedback was about how plan implementation is communicated and a lack of communication with participants.

Comments

20% of comments were negative when talking about the plan implementation experience.

(Source: Insights report — Plan implementation meetings, Reporting and Resources, Engagement and Inclusion Branch, 18 December 2024)

In addition:

Over the last year, there has been a significant increase in the number of complaints, requests for review and enquiries resulting from poor or non-existent plan implementation.

These increases are being driven by people not understanding their plan or the decision the delegate made. Had these things been effectively communicated at a good quality implementation meeting, many complaints, enquiries and plan change requests could be avoided.

In the next topic, you will explore how we can achieve improved outcomes through robust plan implementation.

Lesson 4 of 13

Plan implementation meeting refresher

Whether the Agency conducts a plan implementation meeting, or we hand over to our partners in the community, the same principles for quality plan implementation apply.

Why do we have a plan implementation meeting?

We have a plan implementation meeting to help the participant or their representative understand their plan, ensure consistent messaging and provide an opportunity for us to identify risks.

Let’s explore these reasons in more detail below. The interaction below has 3 markers. Select each marker to access the content.

Help the participant understand their plan

The focus of the plan implementation meeting is to help the participant, or their representative, understand:

  • what supports have and haven’t been funded, and why
  • what they can use their plan for
  • how they can start using it to achieve their goals.

Ensure consistent messaging

A plan implementation meeting provides the opportunity for the participant or their representative to include stakeholders, such as support coordination services or other providers, to ensure consistent messaging and communication about their NDIS plan.

Identify risks

Having a two-way, verbal conversation gives us the opportunity to identify risks for the participant in implementing their plan. Risks may include language or cultural barriers, barriers to accessing services in rural or remote areas, or lack of informal supports. This can inform when and how often we set check-ins with participants, based on their situation and their preferred communication style, frequency and approach.

CONTINUE

When do we have a plan implementation meeting?

A plan implementation meeting will be offered in all circumstances where a new NDIS plan is approved in PACE via a Plan Approval Case.

An implementation conversation may also be of benefit and be offered in other circumstances, for example when:

  • a plan change request has been declined, or when the current plan is not being appropriately utilised
  • a budget update has been approved and there are changes to the plan that will require implementation support
  • an internal review request has resulted in a budget update that requires implementation.

A participant can choose not to participate in a plan implementation meeting, though it is highly recommended for first plans or major changes to a plan. When a participant chooses not to accept a plan implementation meeting, the planner should have a quality conversation about plan implementation during the plan approval meeting and then document this discussion clearly. This might be via email, letter or conversation.

Important note: Safeguards must be in place for those participants who are unable to be contacted or who choose to decline the offer of a plan implementation meeting. This is particularly important for participants from culturally and linguistically diverse (CALD) backgrounds, First Nations participants, participants with intellectual disability, participants in rural and remote areas, participants with complex support needs and where multiple family members have plans.

When a meeting is declined, a delegate should consider alternative ways to provide information on their plan, how to use their plan, declined supports or other relevant information. This might be via email, letter or conversation with an authorised representative, such as a support coordinator.

Two meetings or one?

It is best practice to hold a separate implementation meeting, once the participant has had time to review their plan and think about further questions they may have. There are limited circumstances where combining the plan approval and plan implementation meetings might be an option.

Here are the key points to remember:

  • Participants with first plans should always be offered a separate plan implementation meeting.
  • Participants have the right to request a separate plan implementation meeting.
  • If the participant and planner agree to a combined meeting, it must be clearly documented.
  • Clearly document that an offer for plan implementation was made and record the outcome of that offer.
  • Where a plan approval meeting and a plan implementation meeting are combined, explain that you are doing both and why you think that is suitable for this participant. This needs to be clearly documented in both the Plan Approval Case and the Plan Implementation Case. Refer to the knowledge article: Record the implementation meeting offer outcome.

Dispelling the myths

There are some common myths planners sometimes believe about plan implementation meetings. These myths are contributing to increased enquiries, complaints and reviews. Explore the myths and learn the reality below.

The interaction below has 4 items. Select each item to access the content. A text description is available below the interaction.

‘I covered everything in the plan approval meeting. The participant does not need a plan implementation meeting too.’

‘I had an email exchange with the participant. That should be enough to constitute a plan implementation meeting.’

‘I can close the Plan Implementation Case in PACE without conducting a plan implementation meeting, so it must not be mandatory.’

‘The partner will conduct a plan implementation meeting, so I do not need to worry about this.’

Description - Dispelling the myths 1.docx 289.8 KB

CONTINUE TO DISPEL SOME MORE MYTHS

The interaction below has 4 items. Select each item to access the content. A text description is available below the interaction.

‘The plan is pretty straightforward. The participant is capable of most things and very smart. We covered everything in the plan approval meeting. I will cancel the Plan Implementation Case.’

‘That participant was really difficult to communicate with, and I think we covered everything in the plan approval meeting. I would like to avoid talking to them again if I can.’

‘This participant has had plans before. They know how to use their plan and do not need another meeting.’

‘They have a support coordinator who knows their situation well. I do not think I need to have a plan implementation meeting.’

Description - Dispelling the myths 2.docx 314.2 KB

CONTINUE

What are our legal obligations?

Participants must be involved in the decisions that affect their plan. If NDIA staff do not engage in appropriate plan implementation conversations with participants, and if we do not keep accurate records of our decisions and interactions, there are significant legislative risks, operational risks and participant impacts that arise as a result.

While the NDIS Act does not force participants to engage with us or be involved, our goal is to empower participants to make informed decisions about their plan. The legislative risks relating to plan implementation are around appropriately supporting participants, particularly to understand how to spend in accordance with their plan.

The Participant Service Charter

The NDIS Participant Service Charter (PSC) details what our participants can expect from us. The Charter was first released in 2020 and was updated in 2022 to align with legislation changes.

The 5 engagement principles

The PSC is based on 5 principles for our engagement with participants.

Explore each principle below. The interaction below has 5 markers. Select each marker to access the content.

Transparent Responsive Respectful Empowering Connected

Transparent

We will make it easy to access and understand our information and decisions.

Responsive

We will respond to your individual needs and circumstances.

Respectful

We will recognise your individual experience and acknowledge you are an expert in your own life.

We will make it easy to access and use information and be supported by the NDIS to lead your life.

Connected

We will support you to access the services and supports you need.

CONTINUE

How many of these principles do you think we are upholding when we engage in quality plan implementation conversations with our participants?

The interaction below has 5 items. Select each item to explore how we can apply these principles to plan implementation meetings.

Transparent -

We explain how the plan can be implemented.

Responsive -

We will ask the participant what barriers they have to implementing their plan and how we can support them.

Respectful -

We will acknowledge that a participant already has an idea of the supports that have worked in the past and what will work now.

Empowering -

We will facilitate the building of knowledge and capacity for the participants and their families to do these tasks independently. We will support the participant to access the supports they need. We will assist the participant to link with supports.

Connected -

We will support the participant and their family to access services and supports.

CONTINUE

The Participant Service Guarantee

Under the Participant Service Guarantee (PSG) we have made these commitments about plan implementation meetings:

  • Offer to hold a plan implementation meeting after the plan is approved: 7 days
  • If the participant accepts the offer, hold a plan implementation meeting: 28 days

It is important to make sure the offer is documented to avoid confusion between planners and partners.

Important note: Due to the challenges of contacting participants in remote/very remote regions, planners need to consider the best options available, including time, place and communication method. In some cases, they may need to consider undertaking implementation during the plan approval meeting, whilst they have the participant available. Follow-up can then occur via email or written letter (if email is not accessible).

Customer service mindset

Whilst we have committed to these standards, it is also important to maintain a customer service mindset in all of our interactions with participants.

Explore why a customer service mindset is important. The interaction below has 2 tabs. Select each tab to access the content.

PARTICIPANTS INTERNAL STAKEHOLDERS

In this context, we can consider our participants to be our customers. We are here to provide them with the information and support they need.

In many cases, participants will have a lifelong relationship with the Agency. They need to feel heard and their encounters with us need to be fair and respectful.

PARTICIPANTS INTERNAL STAKEHOLDERS

We also have internal stakeholders:

  • our partners in the community
  • our Agency colleagues in teams that are impacted downstream by the level of service we deliver to participants.

If we skip a process or do not do something as well as we could, we may be creating more work for these internal stakeholders. These internal stakeholders include:

  • the Complaints team
  • the National Contact Centre (NCC)
  • Internal Reviews
  • External Reviews
  • the Escalations team
  • Service Delivery
  • Scheme Integrity.

CONTINUE

Rework and work volumes

When we do not provide clear, transparent and effective plan implementation conversations, we also create more work for ourselves.

This may include multiple plan change requests from participants if they:

  • do not understand our decisions
  • do not know how to implement their plan successfully
  • do not have an opportunity to pick up on errors we may have made in the plan implementation conversation.

This can also mean we are not reducing our volume of work already on hand, because we are committing this energy to addressing matters that could have been avoided with a quality plan implementation conversation. It is also important for us to make room for the transition to New Framework Planning.

Who is responsible for the plan implementation meeting?

Which team holds the responsibility for plan implementation will depend on the participant’s circumstance, particularly their streaming.

Select the different roles to find out more.

The interaction below has 3 items. Select each item to access the content. A text description is available below the interaction.

Partner - early childhood

Partner - LAC

Agency staff

Description - Who is responsible for the plan implementation meeting.docx 313.4 KB

CONTINUE

Important note: Regardless of who is responsible for implementation, responsibility for completing the Request for Service and Manage Provider Relationship Cases once a new plan is approved always lies with the delegate who built the plan, regardless of the team they are based in.

Whilst this step does sit technically in the implementation part of the journey and partners in the community do complete implementation, delegates should ensure this is done at the time of approval.

In the next topic, you will explore the impacts of plan implementation meetings.

CONTINUE

Page 720 of 865

Lesson 5 of 13

The impacts of plan implementation meetings

The benefits of excellent plan implementation

A quality plan implementation conversation is a great opportunity to engage directly with the participant. It helps ensure:

  • the participant understands how they can exercise choice and control while spending in accordance with their plan
  • the participant feels empowered to use their plan appropriately to live their best life
  • reduced risk of over/underutilisation of funds
  • Scheme sustainability.

Explore more benefits below. The interaction below has 2 items. Select each item to access the content.

An implementation meeting will support the participant to:

  • understand what the NDIS can and cannot fund
  • understand their plan, including the supports that have and haven’t been funded, and why
  • understand how to use their plan and start using it
  • get the most out of their funding to achieve their plan goals
  • understand fund management and how supports are paid
  • understand funding periods
  • connect with services and providers of their choice
  • understand service agreements
  • understand their review rights
  • get answers to any questions
  • understand the check-in process.

The meeting will help to deliver key benefits, which include:

  • more support for participants to understand, implement and use their plan flexibly
  • additional support to connect participants with providers and community and mainstream services
  • a reminder of their approved funds management type/s and how funded supports are paid for
  • the empowerment of participants to be able to build their own capacity and their capability to understand and be able to work within budgets to use their plans flexibly to meet their needs
  • the opportunity to identify any risks the participant may face when using their funding and discuss appropriate responses
  • the maintenance of positive and open relationships between the participant and the NDIA.

CONTINUE

The quality of the conversation can significantly influence the relationship between the participant and their family with the Agency and can positively influence the family’s ability to use the plan in line with the participant’s goals.

What can happen when plan implementation is not excellent?

We know from talking to our participants and our internal stakeholders that, in many cases, we are either:

  • missing the plan implementation conversation step, or
  • having an inadequate plan implementation conversation.

This is leading participants to:

  • make a complaint about their plan
  • request a review or plan change
  • ask a question about their plan, via the NCC or Front of House, that could have been managed via an implementation conversation.

This translates into significant downstream impacts for other teams, if we do not get implementation right.

When this happens we:

  • do not deliver the best service to participants
  • cause unnecessary stress to participants
  • force participants to retell their story
  • negatively impact participants’ confidence in the Scheme
  • impact the workload of other teams
  • have a negative impact on Scheme sustainability.

What is going wrong and why?

So why do we sometimes miss a plan implementation meeting or conduct an inadequate meeting? There are lots of reasons, many of which seem reasonable. But, now that we have been reminded of why having a quality plan implementation meeting is so important, let’s try to flip the narrative.

Flipping the narrative activity

Let’s explore some examples of why a plan implementation meeting is skipped or inadequate. Then let’s flip it and consider the other side of each argument.

The interaction below has 6 items. Select each item to access the content. A text description is available below the interaction.

  1. It is not mandatory for a plan implementation meeting to be held in order to close the Plan Implementation Case.

  2. A planner’s performance is not linked to the number of plan implementation meetings conducted.

  3. There is plenty of opportunity for the participant to ask questions and discuss plan utilisation at the plan approval meeting.

  4. Plan implementation support can be offered via a follow-up email after the plan approval meeting.

  5. We can communicate about implementation with the participant’s support coordinator, and they will take it from there.

  6. We only really need a plan implementation meeting when a participant is new to the Scheme or they have a whole new plan.

Description - Flipping the narrative activity.docx 315.6 KB

CONTINUE

In the next topic, you will explore plan implementation best practice.

CONTINUE

Lesson 6 of 13

Plan implementation best practice

Let’s explore how we can apply best practice in plan implementation.

Comments

Loading comments…

What kind of comment is this?
Add a comment