DOCUMENT 5
Attachment A - The Review (issues identified during and post the Review)
The following tables outline the issues identified during and post the Review and their status as indicated by the Table Legend below with status updates as of 25 July 2023.
Table Legend:
- Action Completed
- Action Progressing
- Action Not Started
- CU: Action undertaken as part of the internal procurement capability enhancement programme “Capability Uplift” (identified prior to “the Review”)
- RA: “Review Action” (in response to “the Review”)
Recommendation 1: Tighter control over Limited Tenders and documented justification.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 1.1 The Procurement Policy was published in December 2022 and includes tighter wording and guidance on the justification for limited tender and associated documentation. | - | Dec 22 | CU (Stream 2) |
| 1.2 Practitioner advice around the use of limited tenders has been circulated to all procurement staff. | - | Jun 23 | RA (Stream 2) |
| Progressing | |||
| 1.3 PCSB is developing a reporting mechanism to identify limited tender usage. It is intended that this reporting will be provided to the CEO and Board on an annual basis. | May 23 | Oct 23 | RA (Stream 5) |
| 1.4 Additional reporting parameters are being incorporated into preparation of the July 2023 Senate Order 13 (Murray Motion) report to include notification of limited tender and variations. | May 23 | Aug 23 | RA (Stream 5) |
| 1.5 The NDIA sources its procurement data from the current SAP ERP system controlled by Services Australia (SA). PCSB has commenced discussions with SA to enhance the current SAP capability to allow capture of limited tender and contract variation data. Awaiting a timeline from SA as to potential delivery. | May 23 | TBA | RA (Stream 5) |
| Not Started - NIL |
Status Update
1.3 PCSB has developed a manual reporting mechanism to identify limited tender usage for the July 2023 Senate Order 13 report. From July 2023 onwards it is intended that the Jira Service Desk will enable less manual compilation of this information. This report will be provided to the CEO and Board on an annual basis (if required). This is on track to be finalised by the nominated October 2023 end date. Please refer to 1.4 for status of automating this process.
1.4 The Procurement Reporting team is currently preparing for Senate Order 13. Additional information regarding limited tender reporting obligations and variations is being finalised via a manual collection process and will be incorporated in the Senate Order 13 report. The proposed end date of August 2023 is on track to be met.
1.5 Initial discussions with SA have taken place in June and July 2023, with a follow-up correspondence list of reporting requirements to occur over the coming weeks. A delivery date will be assigned if/when SA confirm SAP capability of delivery.
Recommendation 2: Limited Tender or single supplier approaches to be fully justified and documented, with approaches leading to potential chain procurements closely monitored and justified.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 2.1 The Procurement Policy was published in December 2022 and includes tighter wording and guidance on the justification for limited tender and associated documentation. | - | Dec 22 | CU (Stream 2) |
| Progressing | |||
| 2.2 Procurement templates are being amended to explicitly draw out the use and justification of limited tender. This activity is part of the full refresh of procurement templates and standard operating procedures. | Oct 22 | Jul 23 | CU (Stream 2) |
| 2.3 PCSB will design and deliver a module that provides more guidance around the topic of limited tender. Training will be for PCSB procurement officers, and other relevant NDIA officials. | Dec 22 | Dec 23 | CU (Stream 2 & 6) |
| Not Started | |||
| 2.4 PCSB has requested for Internal Audit to conduct a review around the use of limited tender over a 12-month period. Awaiting advice on program from Internal Audit. | Sep 23 | Oct 23 | RA (Stream 5) |
2.5 redacted PCSB will review current business practices to determine if all limited tender proposals should be reviewed and endorsed by PCSB (regardless of value) prior to Delegate consideration. A first step will be to examine non-compliance reporting to identify if there is an issue. |
Nov 23 | Dec 23 | RA (Stream 2) |
| 2.6 PCSB to commence a review and analysis of key procurement documents for development as ‘smart forms’. These would include the limited tender justifications outlined in the template amendment detailed at point 2.2. | Oct 23 | Nov 23 | CU (Stream 2) |
Status Update
2.2 Refreshed templates for Approval to Proceed and Variations have been finalised and released to procurement officers in July 2023. The Spending Proposal template is underway and will be with the PCSB Branch Manager for clearance and approval in the coming weeks. Once these 3 templates are finalised it will complete the Review response - although other templates are being developed as part of the Procurement Enhancement Program (refer also 2.2, 4.3, 5.2, 6(a).3, 8.2, & 9.3).
2.3 This module is currently under development. This will be supported and enhanced by revised approval templates, SOPs and policy updates. It is expected to be completed as per the nominated end date.
Activities to address items 2.4-2.6 have not yet commenced, however it is expected that they will be implemented within planned timeframes.
Recommendation 3: Reporting on the number of suppliers invited to respond to RFQs / ATMs in the NDIA’s website and Annual Report.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed - NIL | |||
| Progressing | |||
| 3.1 The NDIA intends to publish the number of suppliers invited to respond for each procurement on its website in line with Senate Order 13 reporting criteria and timing. | May 23 | Aug 23 | RA (Stream 5) |
| 3.2 The NDIA sources its procurement data from the current SAP ERP system controlled by SA. PCSB has commenced discussions with SA to enhance the current SAP capability to allow capture of number of suppliers invited to respond. The PCSB is currently undertaking a manual process to capture this data while awaiting a response from SA. | Jun 23 | TBA | RA (Stream 5) |
| Not Started - NIL |
Status Update
3.1 The Procurement Reporting team is currently preparing for Senate Order 13. Additional information regarding publishing on the number of suppliers invited to respond to each procurement is being finalised and will be incorporated in the Senate Order 13 report as applicable. The proposed end date of August 2023 is on track to be met.
3.2 Initial discussions with SA have taken place in June and July 2023, with a follow-up correspondence list of reporting requirements to occur over the coming weeks. A revised delivery date will be assigned if/when SA confirm SAP capability of delivery.
Recommendation 4: Procurement officers to declare Conflicts of Interest (CoI) prior to and during procurement process as required.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 4.1 PCSB provides guidance in the Probity Protocol published in March 2023 on which level of probity advice is appropriate based on the risk and complexity of the procurement activity. All NDIA Officials are required to sign general CoI forms on an annual basis to perform their duties (managed by the NDIA’s People and Culture Division). All procurement officers are required to submit an annual CoI form. | - | Mar 23 | CU (Stream 2) |
| Progressing | |||
| 4.2 People and Culture expect to refresh the NDIA’s CoI management process to be more efficient, accessible, and connected. In the interim, procurement officers and evaluation team members will be required to complete a form annually. Procurement will implement a centralised process to record the CoI declarations. | Dec 22 | Sep 23 | CU (P&C and Stream 2) |
| 4.3 Templates for approval to approach the market and spending proposals are being amended to explicitly call out CoI obligations for delegates. | Oct 22 | Jul 23 | CU (Stream 2) |
| 4.4 PCSB will design and deliver a module that includes additional guidance on the topic of CoI. Training will be for internal PCSB procurement officers, and other relevant NDIA officials. | Dec 22 | Dec 23 | CU (Stream 2 & 6) |
| Not Started | |||
| 4.5 PCSB will review its current practices to determine if the use of CoI Declarations should be completed for all procurements (regardless of value), and not just for high risk, complex or strategic procurements. | Jul 23 | Aug 23 | RA (Stream 2) |
Status Update
4.2 PCSB has established processes for CoI management. Centralised tracking mechanisms are in the process of being developed to minimise duplication across procurement activities.
4.3 Refreshed templates for Approval to Proceed and Variations have been finalised and released to procurement officers in July 2023. The Spending Proposal template is underway and will be with the PCSB Branch Manager for clearance and approval in the coming weeks. Once these 3 templates are finalised it will complete the Review response - although other templates are being developed as part of the Procurement Enhancement Program (refer also 2.2, 4.3, 5.2, 6(a).3, 8.2, & 9.3).
4.4 This module is under development. This will be supported and enhanced by the revised approval templates, SOPs and policy updates. It is expected to be completed as per the nominated end date. Probity training will be undertaken for all procurement managers in September 2023 via an external provider.
Recommendation 5: Modify approval templates to ensure clarity of VFM requirements and Delegates’ signing obligations
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 5.1 The new procurement policy published in December 2022 includes tighter wording on the justification of Value for Money. The NDIA Accountable Authority Instructions (AAIs) require NDIA Officers to procure goods and/or services in a manner consistent with the CPRs. | - | Dec 22 | CU (Stream 2) |
| Progressing | |||
| 5.2 Procurement templates are being enhanced to require clarity regarding VFM justifications, and the obligations of Delegates (with reference to the AAIs). This activity is part of a full review of procurement templates and standard operating procedures. | Oct 22 | Jul 23 | CU (Stream 2) |
| 5.3 PCSB will design and deliver a module that includes additional guidance on the topic of value for money and exercising delegations. Training will be for internal PCSB procurement officers, and other relevant NDIA officials. | Dec 22 | Dec 23 | CU (Stream 2 & 6) |
| Not Started - NIL |
Status Update
5.2 Refreshed templates for Approval to Proceed and Variations have been finalised and released to procurement officers in July 2023. The Spending Proposal template is underway and will be with the PCSB Branch Manager for clearance and approval in the coming weeks. Once these 3 templates are finalised it will complete the Review response - although other templates are being developed as part of the Procurement Enhancement Program (refer also 2.2, 4.3, 5.2, 6(a).3, 8.2, & 9.3).
5.3 This module is under development. It is expected to be completed as per the nominated end date.
Recommendation 6(a): The NDIA and SA review their requirements in relation to Probity and Legal advice to ensure that internal advice is available for all procurements and is used on all procurements over a certain value, risk and/or complexity threshold. External probity and legal advice should be considered for all complex, high risk and/or high value procurements, with the final decision on whether to use advice made and declared by the decision maker.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 6(a).1 The PCSB has its own internal Probity Officer providing probity advice to PCSB and business areas. Where a procurement is considered strategic or complex PCSB may recommend that an external / independent probity adviser is engaged. | - | Jun 22 | CU (Stream 2) |
| Progressing | |||
| 6(a).2 PCSB will publish a standard Probity Register template on the Intranet to capture CoI details, confidentiality declarations and other probity related matters for procurement activities that specifically requires details of any decision on whether not to use legal or probity advice. | Jul 23 | Aug 23 | RA (Stream 2) |
| 6(a).3 A modification is being made to the new approval documentation templates to include a statement on whether probity advice was accepted or rejected, requiring details of the decision for rejecting any advice. | April 23 | Jul 23 | CU (Stream 2) |
| 6(a).4 Additional text will be added to the Probity Protocol to specify the requirement that only the Financial Delegate can consider and accept or reject any probity or legal advice. | Jul 23 | Aug 23 | RA (Stream 2) |
| Not Started - NIL |
Status Update
6(a).4 This will be included in the next iteration of the Probity Protocol. This is on track to be delivered by the nominated end date.
6(a).2 This will be included in the next iteration of the Probity Protocol. This is on track to be delivered by the nominated end date.
6(a).3 Refreshed templates for Approval to Proceed and Variations have been finalised and released to procurement officers in July 2023. The Spending Proposal template is underway and will be with the PCSB Branch Manager for clearance and approval in the coming weeks. Once these 3 templates are finalised it will complete the Review response - although other templates are being developed as part of the Procurement Enhancement Program (refer also 2.2, 4.3, 5.2, 6(a).3, 8.2, & 9.3).
Recommendation 6(b): Consideration of Independent Probity and Legal advice for strategic complex and high risk procurement.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 6(b).1 PCSB provides guidance in the Probity Protocol published in March 2023 on which level of probity advice is appropriate based on the risk and complexity of the procurement activity. | - | Mar 23 | CU (Stream 2) |
| Progressing | |||
| 6(b).2 A Probity decision Tree is being developed for the next iteration of the Probity Protocol. | Jun 23 | Aug 23 | RA (Stream 2) |
| Not Started - NIL |
Status Update
6(b).2 - The Probity decision tree will be included in next iteration of the Probity Protocol (that includes the probity decision tree). This is on track to be delivered by the nominated end date.
Recommendation 7: Review adequacy of record keeping arrangements and develop plan to improve user skill and compliance.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 7.1 HPE Content Manager is the NDIA’s current EDRMS platform. This system is mandatory for all staff and is documented in the Records and Information Management Policy published in January 22. Additional resources are available for staff to assist with record keeping, including training videos and quick reference guides. There is currently a mandatory e-learning module called “Introduction to Records Management”. | - | Jan 22 | CU (Corporate Services) |
| 7.2 The Procurement Policy published in December 2022 was enhanced to provide additional detail on record keeping requirements and obligations. | - | Dec 22 | CU (Stream 2) |
| 7.3 A quality assurance review was introduced in mid-2022 testing key policy non-compliance and verification of appropriate procurement documentation records. Compliance reporting was introduced in January 2023 to provide senior executives with visibility of records contained within the EDRMS. This is produced biannually, with the next report to be tabled in July 2023. | - | Jul 23 | CU (Corporate Services) |
| Progressing | |||
| 7.4 The NDIA has identified a more fit-for-purpose record-keeping solution to potentially replace the current EDRMS. The initial business case was endorsed by the NDIA’s ICT Prioritisation Committee in March 22. Further activities to follow on this project. | Jan 23 | Dec 23 | RA (Corporate Services & ICT) |
| 7.5 PCSB will design and deliver a module to support good records management practices as part of standard procurement activity. Training will be for internal PCSB procurement officers, and other relevant NDIA officials. | Oct 23 | Dec 23 | RA (Corporate Services, Stream 6 & ICT) |
| Not Started - NIL |
Status Update
7.4 ICT have commenced planning for procurement of this EDRMS solution. ICT have nominated a revised projected implementation date of Dec 23.
7.5 This module is under development. Training of any new EDRMS platform being implemented by ICT will be developed and rolled out as part of the transition to a new system.
Recommendation 8: Provide advice to Agencies when a contract has been varied several times (via Austender), or in the case of the Agency, develop its own reporting system.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed - NIL | |||
| Progressing | |||
| 8.1 The NDIA sources its procurement data from the current SAP ERP system controlled by SA. SAP does not currently offer the ability to capture contract variation data. PCSB intends to develop a functional brief for discussion with SA to enhance the current SRM capability. If this cannot be accommodated, the NDIA will investigate a manual work around. This may have resourcing (and cost) implications which would need to be considered further in the context of priorities for the NDIA. | Sep 23 | TBA | RA (Stream 5) |
| 8.2 Templates for spending proposals and variations to be amended to clearly outline all associated variations for delegate visibility. | Oct 22 | Jul 23 | CU (Stream 2) |
| Not Started - NIL |
Status Update
8.1 Initial discussions with SA have commenced in June and July 2023. It is unclear at this stage whether there is capability to capture contract variation data within the current SRM capability. Once capability is determined, an updated schedule and action plan will be provided with revised delivery dates.
8.2 Refreshed templates for Approval to Proceed and Variations have been finalised and released to procurement officers in July 2023. The Spending Proposal template is underway and will be with the PCSB Branch Manager for clearance and approval in the coming weeks. Once these 3 templates are finalised it will complete the Review response - although other templates are being developed as part of the Procurement Enhancement Program (refer also 2.2, 4.3, 5.2, 6(a).3, 8.2, & 9.3).
Recommendation 9: Review adequacy of procurement training programs and officials’ procurement experience, and enhance as necessary
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 9.1 Certificate IV Procurement and Contracting training opportunities are regularly available for both APS and Labour Hire staff in PCSB. | - | Jun 22 | CU |
| Progressing | |||
| 9.2 The “Procurement Plus” training suite is currently being developed to uplift capability. This suite will comprise a wide range of procurement and contract management activities. Training will be targeted across the NDIA, with a mix of formal training and self-directed learning materials available for NDIA staff. | Dec 22 | Jun 24 | CU (Stream 4 & 6) |
| 9.3 The procurement capability enhancement programme includes a full review and refresh of standard templates and standard operating procedures. This is supported by the expertise of PCSB procurement officers to improve NDIA procurement practices and outcomes more broadly. | Dec 22 | Jul 23 | CU (Stream 2) |
| Not Started - NIL |
Status Update
9.2 PSCB is working on a broader procurement enhancement program which guides the procurement capability uplift project (Procurement Plus) and future continuous improvement activities. The Procurement Plus training plan will be drafted in consultation with PSCB staff (anticipated Oct 23). This capability uplift program will be delivered year-round and customised to meet the needs of staff.
9.3 Refreshed templates for Approval to Proceed and Variations have been finalised and released to procurement officers in July 2023. The Spending Proposal template is underway and will be with the PCSB Branch Manager for clearance and approval in the coming weeks. Once these 3 templates are finalised it will complete the Review response - although other templates are being developed as part of the Procurement Enhancement Program (refer also 2.2, 4.3, 5.2, 6(a).3, 8.2, & 9.3).
Recommendation 10: The NDIA and SA brief incoming Ministers on CPRs and PGPA Act, which set the role of officials as those who undertake and decide on procurements. Senior agency officials to be similarly advised.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed - NIL | |||
| 10.1 The NDIA commits to briefing incoming Ministers on CPRs and the PGPA Act post federal elections and/or Cabinet reshuffles. This briefing extends to NDIA Senior Leadership - CEO / DCEOs annually, as well as the NDIA Board Chair and Members within six months post a federal election. | - | - | CU |
| Progressing | |||
| 10.2 PCSB will design and deliver a module to support delegates that includes the topic of CPRs, PGPA Act and roles and responsibilities. | Jul 23 | Dec 23 | RA (Stream 6) |
| Not Started - NIL |
Status Update
10.2 This module is under development. This will be enhanced by updated approval templates and policy updates. It is expected to be completed as per the nominated end date. The broader enhancement program and associated reporting will be established by August 23.
Recommendation 11: The CEOs of the NDIA and SA support professionalism of procurement along the lines of Thodey Review (2019) recommendations.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 11.1 The NDIA CEO wrote to the Australian Public Service Commission to detail support for the professionalism of procurement recommended with the Thodey Review, and its inclusion in the Public Sector Reform Agenda. EC23-001441 refers. | - | Jul 23 | RA (Stream 2 & 4) |
| Progressing - NIL | |||
| Not Started - NIL |
Status Update
N/A
Recommendation 12:
12(a) That the CPRs be amended to explain the deterministic role of officials, and that they preclude Ministers, ministerial advisors and senior officials from directing officials in relation to procurements.
12(b) Should stakeholders seek to direct aspects or outcomes of a specific procurement, this should be documented and published on the agency’s website along with details of the procurement outcomes. Should there be a government decision, this would also be documented and published.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed - NIL (Recommendation 12(a) if for action by the Department of Finance) | |||
| Progressing | |||
| 12(b).1 A Standard Operating Procedure is being developed to support publication of any issues related to Recommendation 12b. This activity is part of the full refresh of procurement templates and standard operating procedures. | Oct 22 | Jul 23 | CU (Stream 2) |
| Not Started - NIL |
Status Update
12(b).1 Templates are being updated to include a declaration for delegates to address instances where a party has sought to influence the outcomes of procurements or grants. Internal processes are also being updated to data capture this information for reporting purposes.
Recommendation 13: CEO of the NDIA and SA supports briefing of Ministers on procurement and the roles of officials as part of the DoF induction for Federal MPs.
| Action | Start Date | End Date | Capability Uplift (CU) / Review Action (RA) Response |
|---|---|---|---|
| Completed | |||
| 13.1 The NDIA CEO wrote to the DoF Secretary to articulate support for the briefing of Ministers on procurement and the role of officials, as part of the DoF induction for Federal Parliamentarians. EC23-001437 refers. | - | Jul 23 | RA (Stream 2) |
| Progressing - NIL | |||
| Not Started - NIL |
Status Update
N/A
🚩 Suggested fixes
Comments
Loading comments…