Activity Work Plan (AWP) — provides information about how you will deliver services. The Disability Representative Organisations program Policy Team will negotiate and approve your AWP at the start of an agreement or reporting period. Item E. Reporting of the grant agreement specifies when the AWP is due. You will need a copy of your grant agreement and grant opportunity guidelines to complete the AWP. A copy of your grant application, where relevant, is also useful.
Activity Work Plan Report (AWPR) — documents what you have delivered against the approved AWP. Item E. Reporting of the grant agreement specifies when the AWPR is due. Please use your approved AWP to document your achievements and progress for the reporting period in the AWP Report column.
Each table includes guidance text to assist you to complete the template. Add rows to the tables as required.
If you have any questions about completing the AWP or AWPR, please contact your Funding Arrangement Manager. See Item F. Party representatives and address for notices in your grant agreement.
Activity details
| Organisation Name | People with Disability Australia Ltd |
|---|---|
| Grant Activity Name | Disability Representative Organisations |
| Grant Activity ID | 4-JMATUZ |
Activity Work Plan Page 1
Activity deliverables
When completing the Activity Work Plan, populate the Objective, Deliverable, Time frames and Measures of Success sections. Only complete the AWP Report column when submitting your AWPR.
You may duplicate the rows in this table as many times as necessary to describe each deliverable.
| Objective | Deliverable | Time frames | Measures of success | AWP Report |
|---|---|---|---|---|
| e Describe the intended outcome that your activity / service aims to achieve. | e Describe the key tasks / output that you will complete to achieve the activity objectives. | e Specify the timeframes in which you expect to complete the deliverable. | e Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured. | e Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable. If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable. |
| e Outline the need for the activity/service. | e Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable. |
Overarching (Mandatory):
Actively engage with the objectives of the DRO program
| | | | | | Active engagement in systemic disability advocacy issues, policies and legislation regarding ‘all people with disability’ and ‘LGBTIQA+’, including: | | Evidence of: | | | | | | | | | e National systemic disability advocacy | | e Submissions and representation to Government about systemic disability advocacy issues and/or policies. | | | | e Australia’s Disability Strategy 2021-2031 | | e Awareness raising and information distribution to members and general community (including to hard-to-reach cohorts). | | | | e Australian Government disability reforms. | | e Collaboration with other disability and non-disability organisations to promote the rights of people with disability. | | |
Activity Work Plan Page 2
Activity Work Plan
-
Describe the intended outcome that your activity / service aims to achieve.
-
Outline the need for the activity/service.
-
Identify key issues that the activity / service seeks to address and the groups that may experience these issues.
-
Describe the key tasks / output that you will complete to achieve the activity objectives. Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable.
-
Specify the timeframes in which you expect to complete the deliverable.
-
Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured.
-
Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable. If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable.
-
UNCRPD related activities
Engagement activities may include submissions and representation, awareness raising, and information distribution activities (including to hard-to-reach cohorts).
- Collaborate with the provider delivering the National Coordination Function (NCF).
Evidence of engagement and collaboration with the NCF
Ongoing
Evidence of:
- Collaborating with the NCF
- Attendance at NCF meetings and engagement activities.
- Collaboration with other DROs across key advocacy activities and submissions particularly where DROs represent the same cohorts.
Providing required data and information to the NCF in a timely manner to support regular reporting activities to the department, including information related to activities, demand and
Activity Work Plan
- e
lb. Sf Community tt tt tt tt ttt tt +t Rabarearigs <* ++ +e e+44+4+44444 i Grants Hub Phe eee eee eee et Australian Government Improving your grantexperience
Objective
- Describe the intended outcome that your activity / service aims to achieve.
- Outline the need for the activity/service.
- Identify key issues that the activity / service seeks to address and the groups that may experience these issues.
Deliverable
- Describe the key tasks / output that you will complete to achieve the activity objectives.
- Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable.
Time frames
- Specify the timeframes in which you expect to complete the deliverable.
Measures of success
- Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured.
AWP Report
- Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable.
- If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable.
outputs for activities completed under this agreement, and other metrics as required.
Specific Reporting (Mandatory)
Representation of LGBTQIA+ cohort
- PWDA will expand its Ongoing Establishment of an LGBTIQA+ advisory group, with supporting governance infrastructure Development and implementation of an LGBTIQA+ strategy developed with the LGBTIQA+ advisory group
- LGBTQIA+ Advisory group —a Membership of key membership-based organisations relevant to representing the LGBTIQA+ interests of people with disability. This may include, but is not limited to (and is subject to change depending identified priorities of the forthcoming LGBTIQA+ advisory group):
s 47E(d)s 47E(d)s 47E(d)
Activity Work Plan
-
e
-
i z Com munity PPh Parr Pr
-
Australian Government Improving your grantexperience
| Objective | Deliverable | Time frames | Measures of success | AWP Report |
|---|---|---|---|---|
| Describe the intended outcome that your activity / service aims to achieve. | Describe the key tasks / output that you will complete to achieve the activity objectives. Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable. | Specify the timeframes in which you expect to complete the deliverable. | Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured. | Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable. If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable. |
| Outline the need for the activity activity/service. | ||||
| Identify key issues that the activity / service seeks to address and the groups that may experience these issues. | ||||
| 6s 47E(d) | ||||
| 6s 47E(d) | ||||
| 6s 47E(d) | ||||
| 6s 47E(d) | ||||
| Evidence of (where possible) of the following | ||||
| Representing LGBTIQA+ interests to relevant government agency, departmental, ministerial, parliamentary or other relevant stakeholders | ||||
| Representing cross-disability interests to industry, academic, community or other relevant sector stakeholders. | ||||
| Representing LGBTIQA+ interests to disability sector stakeholders. | ||||
| Attending and contributing to LGBTIQA+ community events and key forums (e.g. Better Together annual conference, Sydney Gay and Lesbian Mardi Gras and Midsumma) |
Activity Work Plan
Describe the intended outcome that your activity / service aims to achieve. Outline the need for the activity/service. Identify key issues that the activity / service seeks to address and the groups that may experience these issues.
Objective
Describe the intended outcome that your activity / service aims to achieve.
Deliverable
Describe the key tasks / output that you will complete to achieve the activity objectives.
Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable.
Time frames
Specify the timeframes in which you expect to complete the deliverable.
Measures of success
Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured.
AWP Report
Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable.
If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable.
Promoting collaboration between relevant stakeholders when needed.
Allocation of funds to all people with disability (over two years) - $1,100,000 (GST exclusive) — All people with disability
DRO to distribute funds and future indexation and supplementation payments, in accordance with the agreement with department around the allocation of cohort funding.
$200,000 (GST exclusive) - LGBTQIA+ people with disability
Department around the allocation of cohort funding.
Additional funding of $225,000 (GST exclusive) (over two years) for disability reforms.
Specific Reporting (Non-Mandatory)
July 2024-June 2026
Evidence of funding distribution in accordance with the agreement with department around the allocation of cohort funding.
Objective
- Describe the intended outcome that your activity / service aims to achieve.
- Outline the need for the activity/service.
- Identify key issues that the activity / service seeks to address and the groups that may experience these issues.
Deliverable
- Describe the key tasks / output that you will complete to achieve the activity objectives.
- Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable.
Time frames
- Specify the timeframes in which you expect to complete the deliverable.
Measures of success
- Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured.
AWP Report
- Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable.
- If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable.
Providing systemic cross-disability advocacy through international mechanisms and networks, including non-CRPD UN treaty body mechanisms
Active engagement in systemic disability policy issues important to people with disability through:
- relevant mechanisms related to the Convention on the Rights of Persons with Disabilities (CRPD), including processes of the CRPD Committee
- relevant consultation mechanisms of international and regional Disabled Peoples’ Organisation (DPO) networks and institutions (e.g. the Pacific Disability Forum and the Commonwealth Disabled Peoples’ Forum).
Ongoing
Retaining the following memberships:
- Consultative Status with the United Nations Economic and Social Council (ECOSOC).
- Key international and regional DPO networks and institutions, especially the Pacific Disability Forum and the Commonwealth Disabled Peoples’ Forum.
Evidence of (as required) the following:
- Building the capacity of people with disability to participate in international mechanisms.
- Building the capacity of sister DPOs, especially in the Asia-Pacific region, to implement the CRPD in their home country, based on Australian experiences.
- Engaging with CRPD-related activities and CRPD Committee processes.
- Submissions to relevant international policy development mechanisms, reflecting the Australian experience.
Activity Work Plan
Page 7
Activity Work Plan
Page 8
| Objective | Deliverable | Time frames | Measures of success | AWP Report |
|---|---|---|---|---|
| Describe the intended outcome that your activity / service aims to achieve. | Describe the key tasks / output that you will complete to achieve the activity objectives. | Specify the timeframes in which you expect to complete the deliverable. | Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured. | Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable. If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable. |
| Outline the need for the activity/service. | Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable. | |||
| Identify key issues that the activity / service seeks to address and the groups that may experience these issues. | ||||
| Representation and/or relevant communications to treaty body committees | ||||
| Representation at meetings of international and regional DPO networks | ||||
| Discussing international policy developments with parliamentarians, including with relevant Ministers and government departments and agencies | ||||
| Advocating for international CRPD developments within Australia’s human rights framework, including working with Australia’s National Human Rights institution (NHRI), the Australian Human Rights Commission. | ||||
| Actively engaging with the Federal Budget process | Pre-Budget submission to the Australian Treasury | Annually (May) | A Pre-Budget submission made to the Australian Treasury | Participation in the Budget Lock-Up |
Actively Engaging with the Committee on the Rights of Persons with Disabilities Country Review of Australia
- Describe the intended outcome that your activity / service aims to achieve.
- Outline the need for the activity/service.
- Identify key issues that the activity / service seeks to address and the groups that may experience these issues.
Objective
Describe the intended outcome that your activity / service aims to achieve. Outline the need for the activity/service. Identify key issues that the activity / service seeks to address and the groups that may experience these issues.
Deliverable
Describe the key tasks / output that you will complete to achieve the activity objectives. Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable.
Time Frames
Specify the timeframes in which you expect to complete the deliverable.
Measures of Success
Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured.
AWP Report
Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable. If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable.
Participation in the Budget Lock-Up
Evidence of media engagement related to the Federal Budget, as it pertains to the cross-disability interests of people with disability.
Evidence of activity and collaboration with relevant processes related to CRPD Committee’s review of Australia.
2026
Evidence of (as required) the following:
- Supporting relevant stakeholders such as the Australian Human Rights Commission and the Attorney-General’s Department
- Distributing information and raising awareness to members and the general community about the CRPD Committee’s review of Australia
- Providing expert advice to relevant Ministers, ministerial offices, parliamentarians and departmental staff
Activity Work Plan Page 9
Supporting the UN Human Rights Council’s 4th Universal Period Review (UPR) of Australia
-
Evidence of activity and collaboration with relevant processes related to the UPR.
Activities may include, but not be limited to: submissions, research, representation, awareness raising and information distribution activities.
-
2026
Evidence of (as required) the following:
- Supporting relevant stakeholders such as the Australian Human Rights Commission and the Attorney-General’s Department
- Supporting the authors of
- Providing expert advice to relevant Ministers, ministerial offices, parliamentarians and departmental staff
- Participating in and promoting relevant engagement and/or consultation activities.
Actively engaging and contributing to and influence outcomes of the annual UN
-
Evidence of activity and collaboration other organisations and/or foreign
-
2025/2026 (June)
Evidence of (as required) the following:
- Supporting and collaborating with DSS, the Department of Foreign Affairs and Trade.
Activity Work Plan
- e
hf Community tt tt tt tt ttt tt +t Rabarearigs <* ++ +e e+44+4+44444 i Grants Hub Phe eee eee eee et Australian Government Improving your grantexperience =
Objective
- Describe the intended outcome that your activity / service aims to achieve.
- Outline the need for the activity/service.
- Identify key issues that the activity / service seeks to address and the groups that may experience these issues.
Deliverable
- Describe the key tasks / output that you will complete to achieve the activity objectives.
- Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable.
Time frames
- Specify the timeframes in which you expect to complete the deliverable.
Measures of success
- Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured.
AWP Report
- Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable.
- If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable.
Conference of State Parties (COSP)
-
governments who attend COSP.
-
the Australian Human Rights Commission, and any other government officials attending COSP
-
Supporting and collaborating with other organisations (Australian and foreign) and/or foreign governments who attend COSP
-
Producing and/or partnering with other organisations producing side events in line with the COSP themes for each year
-
Delivering interventions related to the COSP themes each year, that draw on our expertise
-
Participating in International Disability Alliance and other DPO networks activities, including attending the Civil Society Forum, as needed
-
Distributing information and raising awareness to members and the general community outcomes that PWDA influences
N.B. If funding obtained through the DSS Supporting Participation by representatives of people with disability in key international forums on human rights, then this activity will report activity of PWDA delegates not funded by that program.
Objective
- Describe the intended outcome that your activity / service aims to achieve.
- Outline the need for the activity/service.
- Identify key issues that the activity / service seeks to address and the groups that may experience these issues.
Deliverable
- Describe the key tasks / output that you will complete to achieve the activity objectives. Deliverables should be specific, measurable, and linked to the intended objectives of a service or deliverable.
Time frames
- Specify the timeframes in which you expect to complete the deliverable.
Measures of success
- Identify one or more measures of success for the stated objective/s. This should include indicators that will, once collected, demonstrate the impact of the action(s). A measure of success includes what the Department of Social Services and/or you intend to measure, how it will be measured, and when it will be measured.
AWP Report
- Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable. If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable.
Amplifying the voice of people with disability at the next Federal Election
| Objective | Deliverable | Time frames | Measures of success | AWP Report |
|---|---|---|---|---|
| Amplifying the voice of people with disability at the next Federal Election | 2025 Federal Election Platform | 2025 | A 2025 Federal Election Platform released, based on consultation with our national membership. | Document if your intended deliverables have been achieved, or outline if you are on track to achieve the deliverable. If you are not on track to achieve the deliverable, outline what steps you have taken so far and steps you will take in the future to achieve the deliverable. |
| Evidence of media engagement related to the Federal Election, as it pertains to the cross-disability interests of people with disability | Evidence of media engagement, including: Publication of a media release/s Media mentions Communicating key election platforms of election candidate with the disability community through our communication channels. |
Risk management (please note any predicted risks & related mitigation strategies)
When completing the Activity Work Plan, populate the Risk and How the Risk will be Managed sections. Only complete the AWP Report column when submitting your AWPR.
You may duplicate the rows in this table as many times as necessary to describe each identified risk.
Risk Management
List any risks you have identified that could affect the successful delivery of activities, outputs and/or outcomes.
Risks might include, but are not limited to activity, operational, health and safety or reputational.
How the Risk will be Managed
Outline the action(s) your organisation will take to mitigate and/or manage each risk.
This should include consulting your FAM ahead of any media contact referencing activities or issues related to your Grant Agreement.
AWP Report
Document if your risk management strategies were successful and/or provide an update on how they are progressing.
List any new risks are identified, and new management strategies as required.
Contestability of PWDA’s Legitimacy to Represent LGBTIQA+ People with Disability
No organisation that has previously or currently have a focus on LGBTIQA+ people with disability have a membership basis that is both made of entirely of people with disability and has a national focus. PWDA is unique in this regard.
However, to manage the risk, PWDA has existing relationships with all organisations who have a focus on LGBTIQA+ people with disability, and will undertaking the following to mitigate risks:
- Establish an LGBTIQA+ Advisory Group and invite organisational members to join
- Develop and reiterate an LGBTIQA+ strategy based on the priorities identified by the forthcoming LGBTIQA+ Advisory Group
- In developing the above strategy, further market and stakeholder analysis will be conducted; to inform additional contextual, specific and/or individual risk mitigation strategies we can apply to stakeholders
- Where relevant, and subject to the above analysis, PWDA’s Strategic Partnerships team will with relevant organisations to scope for potential partnerships where natural synergies exist and/or develop Memorandums of
Risk
-
List any risks you have identified that could affect the successful delivery of activities, outputs and/or outcomes.
-
Risks might include, but are not limited to activity, operational, health and safety or reputational.
How the Risk will be Managed
-
Outline the action(s) your organisation will take to mitigate and/or manage each risk.
-
This should include consulting your FAM ahead of any media contact referencing activities or issues related to your Grant Agreement.
AWP Report
-
Document if your risk management strategies were successful and/or provide an update on how they are progressing.
-
List any new risks are identified, and new management strategies as required.
-
Understanding (MoU) where potential conflicts could arise.
-
Develop and invest in organisational processes and structures that embed an LGBTIQA+ lens to all our business units, leveraging our expertise in individual advocacy, and disability training and education.
Contestability of PWDA’s legitimacy to represent
the diversity of LGBTIQA+ people with disability
While PWDA represents the cross-disability interests of LGBTIQA+ people with disability, we recognise that specific systemic issues may arise from the basis of another characteristic, such as gender, Indigeneity, cultural, religious and/or linguistic background, age or some other relevant attribute.
To ensure PWDA represents the diversity of the LGBTIQA+ with disability, and will undertaking the following:
-
Ensure intersectional representation in LGBTIQA+ Advisory Group
-
Ensure a diversity of impairments and conditions in the LGBTIQA+ Advisory Group
-
Provide an intersectional lens in all outputs PWDA creates related to LGBTIQA+ people with disability
Activity Work Plan
Page 14
Risk Management
-
List any risks you have identified that could affect the successful delivery of activities, outputs and/or outcomes.
-
Risks might include, but are not limited to activity, operational, health and safety or reputational.
How the Risk will be Managed
-
Outline the action(s) your organisation will take to mitigate and/or manage each risk.
-
This should include consulting your FAM ahead of any media contact referencing activities or issues related to your Grant Agreement.
AWP Report
- Document if your risk management strategies were successful and/or provide an update on how they are progressing.
- List any new risks are identified, and new management strategies as required.
Leverage our existing and strong working relationships with cohort-based Disability Representative Organisations (e.g. WWDA, FPDN, NEDA, Inclusion Australia) to ensure appropriate partnerships and/or relevant factors are duly considered and actioned.
Ensure all of our engagements with the community are culturally aware, culturally safe and trauma informed.
Duplication of Activities and Outcomes
Organisations such as the Self Advocacy Resource Unit (SARU), Inclusive Rainbow Voices and Rainbow Rights and Advocacy may duplicate activities that produce the same or similar outcomes to what we intend.
To manage this risk, we will undertake the following risk mitigation strategies:
- Engaging stakeholders early and often, to identify areas of existing duplication and/or potential duplication and if required operate in partnership and/or have a clear delineation through an instrument e.g. Memorandum of Understanding.
- Engage clear collaborative pathways and co-ordination processes with these groups/stakeholders.
Activity Work Plan
Page 15
Risk Management Plan
Risk Management
- List any risks you have identified that could affect the successful delivery of activities, outputs and/or outcomes.
- Risks might include, but are not limited to activity, operational, health and safety or reputational.
How the Risk will be Managed
- Outline the action(s) your organisation will take to mitigate and/or manage each risk.
- This should include consulting your FAM ahead of any media contact referencing activities or issues related to your Grant Agreement.
- Leverage our internal Strategic Partnerships team to manage new partnerships, to ensure project requirements and project governance mechanism are clear and agreed between parties.
- Implement appropriate governance and administrative processes and infrastructure to support the identification of duplicative activities, e.g. creating a Communities of Practice.
AWP Report
- Document if your risk management strategies were successful and/or provide an update on how they are progressing.
- List any new risks are identified, and new management strategies as required.
Staff Turnover
Staff turnover affecting the successful delivery of activities, outputs and/or outcomes. Staff turnover and associated delayed in recruiting new staff has been a risk in delivering activities in the past. To address this, the following risk management strategies are in place:
- Allocating and investing a healthy amount of funding for professional development for staff (see budget below).
- Allocating a budget line item to consultancies (see below budget) to ensure we have access to highly qualified contractors to deliver work on a needs basis.
Activity Work Plan
Risk Management
| Risk | How the Risk will be Managed | AWP Report |
|---|---|---|
| List any risks you have identified that could affect the successful delivery of activities, outputs and/or outcomes. Risks might include, but are not limited to activity, operational, health and safety or reputational. | Outline the action(s) your organisation will take to mitigate and/or manage each risk. This should include consulting your FAM ahead of any media contact referencing activities or issues related to your Grant Agreement. Having clear individual workplans and management processes and structures to ensure effective communication and manage workloads and stress. | Document if your risk management strategies were successful and/or provide an update on how they are progressing. List any new risks are identified, and new management strategies as required. |
Underspending Funding Amount
PWDA plans to use redacted in FY2024/25 of the LGBTIQA+ funding (total of $200,000) as we establish ourselves as the peak representing LGBTIQA+ people with disability. Therefore, we plan to spend $800,000 of the funding in this financial year.
To mitigate the risk of underspending this amount, we will:
- Monitor the budget monthly and use existing management processes to monitor expenditure
- Re-forecast for the remainder of the FY during our annual mid-year budget re-forecast process
Elevate risks to Funding Arrangement Manager as needed, to discuss additional measures if needed.
Budget
When completing the Activity Work Plan, populate the Items and Budgeted Amount sections for the financial year. Only complete the AWP Report column when submitting your AWPR.
You may duplicate the rows in this table as many times as necessary to describe each item / key category.
Activity Work Plan
+.
+.
+. rt +. t+ + ++ +++4+4
Community Grants Hub Improving your grant experience
| Items | Budgeted Amount | AWP Report |
|---|---|---|
| List the budget category (e.g. staff, travel) | 2024-2025 | 2025-2026 |
| Distribution of funding per cohort (over two years): | ||
| All people with disability $1,100,000 | ||
s47E@yy— 2024-2025 |
||
s47E@jey— 2025-2026 |
||
| LGBTQIA+ People with disability $200,000 | ||
| Combined total: $1,300,000 | ||
| Additional funding of $225,000 (over two years) for disability reforms, to be distributed in line with the percentage split of the above. | ||
s47E(aym — 2024-2025 |
||
s47E(@ye — 2025-2026 |
||
| All figures are GST exclusive |
| Wages and salaries (including on costs and professional development) - | | | | |
| s 47E(d) | | | | |
| Shared services contribution (for staff and services that are shared by all business units in the organisation e.g. human resources) - | | | | |
| s 47E(d) | | | | |
| Travel and associated costs - S47E(d) | | | | |
| Consultancies and contractors (to supplement core staffing when need arise and/or respond to emerging issues) - | | | | |
| s 47E(d) | | | | |
| Overheads - s47E(@) | | | | |
| TOTAL: $800,000 |
We note the below is an indicative budget and is subject to change, as budget processes for this financial year will not commence until early 2025.
| | | | |
| Wages and salaries - s 47E(d) | | | | |
| Consultancies and contractors - S47E(a) | | | | |
| Shared services contributions - S47E(a) | | | | |
| Travel and associated costs - S47E(a) | | | | |
| Overheads -S47E(@) | | | | |
| TOTAL: $725,000 |
Stakeholder
When completing your Activity Work Plan, populate the Stakeholder, Interest or Impact and Engagement Strategy sections. Only complete the AWP Report column when submitting your AWPR.
You may duplicate the rows in this table as many times as necessary to describe each stakeholder.
| Stakeholder | Interest or Impact | Engagement Strategy | AWP Report |
|---|---|---|---|
| Name the stakeholders who you will need to engage with in the delivery of this activity. | Describe why you need to engage with the stakeholder. For example, what interest does the stakeholder have in the activity, or how will the activity affect the stakeholder? | Describe how you will engage with the stakeholder to mitigate potential risks. This may relate to the stakeholder’s interest in, or the impact of, the activity. | Document whether your stakeholder engagement strategies were successful. You may want to provide an update on how they are progressing. Consider if your current stakeholder engagement strategy requires updating. |
| PWDA members/people with disability | Primary stakeholder: We are funded to represent and provide systemic advocacy for this stakeholder. | Implementation of PWDA’s existing communications and membership engagement strategies, structures and processes, remain engaged with our members |
Stakeholder Engagement
| Stakeholder | Interest or Impact | Engagement Strategy | AWP Report |
|---|---|---|---|
| Name the stakeholders who you will need to engage with in the delivery of this activity. | Describe why you need to engage with the stakeholder. For example, what interest does the stakeholder have in the activity, or how will the activity affect the stakeholder? | Describe how you will engage with the stakeholder to mitigate potential risks. This may relate to the stakeholder’s interest in, or the impact of, the activity. | Document whether your stakeholder engagement strategies were successful. You may want to provide an update on how they are progressing. Consider if your current stakeholder engagement strategy requires updating. |
| LGBTIQA+ people with disability | Primary stakeholder: We are funded to represent and provide systemic advocacy for this stakeholder | e Implementing governance processes (e.g. Board advisory committees) to leverage the lived experience of our Board, who are 100% people with disability, and are voted by our members annually. e As above and establishing and LGBTIQA+ Advisory Group, who will in turn support us the development of an LGBTIQA+ strategy. | |
| Targeted LGBTIQA+ organisations and networks | Secondary stakeholder: As per our risk assessment above, we have identified the potential for duplication of activities and outcomes with LGBTQIA+ organisations who also have a focus on LGBTIQA+ people with disability. While we share a common interest to advance the rights of LGBTIQA+ people with disability, we may differ on approaches and/or may want to | See strategies listed in the risk assessment above. |
Activity Work Plan
Page 20
Activity Work Plan
| Stakeholder | Interest or Impact | Engagement Strategy | AWP Report |
|---|---|---|---|
| Name the stakeholders who you will need to engage with in the delivery of this activity. | Describe why you need to engage with the stakeholder. For example, what interest does the stakeholder have in the activity, or how will the activity affect the stakeholder? | Describe how you will engage with the stakeholder to mitigate potential risks. This may relate to the stakeholder’s interest in, or the impact of, the activity. | Document whether your stakeholder engagement strategies were successful. You may want to provide an update on how they are progressing. Consider if your current stakeholder engagement strategy requires updating. |
| Disability Representative Organisations | Secondary stakeholder: We have a common interest to advance the rights of people with disability but may differ in certain areas. | Participation in the NCF Working on a partnerships basis as needed | |
| Disability Carer Organisations | Secondary stakeholder: We have a common interest to advance the rights of people with disability but may differ in certain areas. | Maintaining strong and productive working relationship in relevant forums (e.g. the NDIA CEO Forum) and working on a partnerships basis as needed. | |
| Disability Service Providers | Secondary stakeholder: We have a common interest to ensure people with disability are supported to participate fully in society, but we may differ on what and how supports are provided. | Maintaining strong and productive working relationship in relevant forums and working on a partnerships basis as needed. | |
| Australian Government department, | Secondary stakeholder: We have a common interest to ensure people with disability are supported to | Implementation of a government relations plan and strategies |
Activity Work Plan
| Stakeholder | Interest or Impact | Engagement Strategy | AWP Report |
|---|---|---|---|
| parliamentary or agency officials | participate fully in society, but we may differ on how and the best systems, policies, laws and programs will promote the full participation of people with disability. Additionally, we may differ on how much a measure will cost to promote the full participation of people with disability. | Participation in established government consultation mechanisms and advisory groups. Maintaining strong and productive working relationships with key officials and staff. | Document whether your stakeholder engagement strategies were successful. You may want to provide an update on how they are progressing. Consider if your current stakeholder engagement strategy requires updating. |
| State/territory department, parliamentary or agency officials | Secondary stakeholder: We have a common interest to ensure people with disability are supported to participate fully in society, but we may differ on how and the best systems, policies, laws and programs will promote the full participation of people with disability. Additionally, we may differ on how much a measure will cost to promote the full participation of people with disability. | Implementation of a government relations plan and strategies. Participation in established government consultation mechanisms and advisory groups. Maintaining strong and productive working relationships with key officials and staff. |
Activity Work Plan
| Stakeholder | Interest or Impact | Engagement Strategy | AWP Report |
|---|---|---|---|
| Name the stakeholders who you will need to engage with in the delivery of this activity. | Describe why you need to engage with the stakeholder. For example, what interest does the stakeholder have in the activity, or how will the activity affect the stakeholder? | Describe how you will engage with the stakeholder to mitigate potential risks. This may relate to the stakeholder’s interest in, or the impact of, the activity. | Document whether your stakeholder engagement strategies were successful. You may want to provide an update on how they are progressing. Consider if your current stakeholder engagement strategy requires updating. |
| Community, housing, employment services and social security sector peaks | Secondary stakeholder: We have a common interest to improve the quality of relevant policies, programs, laws and systems, but we need to ensure policies, programs, laws and systems are inclusive of people with disability and promote our full participation in society. | Maintaining strong and productive working relationship in relevant forums and working on a partnerships basis as needed. | |
| Academics and researchers | Secondary stakeholder: We share a common interest in collecting and data to ensure changes to policies, systems, laws and programs are evidence-based, but we need to ensure that the research agenda is inclusive, and research is conducting on questions and issues that people with disability need to improve our full participation in society. | Maintaining a strong and productive working relationship with the National Disability Data Asset Council and the National Disability Research Partnership. Working on a partnerships and/or consultancy basis as needed with individual academics and researchers. Maintaining a strong and productive working relationship with relevant academics and researchers in shared projects (both PWDA and non-PWDA projects) |
Activity Work Plan
7 + + a + + A + + ca
Re hep. Fett ttt ttt + t+ kadai
Community Grants Hub
Improving your grant experience
| Stakeholder | Interest or Impact | Engagement Strategy | AWP Report |
|---|---|---|---|
| Name the stakeholders who you will need to engage with in the delivery of this activity. | Describe why you need to engage with the stakeholder. For example, what interest does the stakeholder have in the activity, or how will the activity affect the stakeholder? | Describe how you will engage with the stakeholder to mitigate potential risks. This may relate to the stakeholder’s interest in, or the impact of, the activity. | Document whether your stakeholder engagement strategies were successful. You may want to provide an update on how they are progressing. Consider if your current stakeholder engagement strategy requires updating. |
| Regulators | Secondary stakeholder: We have a common interest in ensuring the systems, goods and services people we receive are quality, safe and inclusive of people with disability, but we need to ensure that regulatory changes are inclusive of people with disability and/or collaborate to implement changes that improve the inclusion of people with disability. | Participation in established consultation mechanisms and advisory groups. Maintaining strong and productive working relationships with key officials and staff. |
Page 24
Further comments
Community Grants Hub
Improving your grant experience
redacted
You are welcome to provide extra information to illustrate your service. You may want to include a case study, examples of better practice, or barriers to success of the program.
Activity Work Plan
Page 25
Activity Work Plan
Authorised signatories of your organisation must complete this section. Once co-signed, the AWP forms part of the Grant Agreement. Your FAM will send you a copy of the approved AWP to keep for your records. Your organisation and the Commonwealth may request an update to the AWP at any time. Any updates will be subject to the acceptance and approval of the Commonwealth.
Signed for and on behalf of (Legal Organisation Name)
People with Disability Australia Department of Social Services
Signature
Name: Megan Spindler-Smith
Position: Acting CEO Assistant Director
Date: 05_/ 09 /2024 05 _/09 / 2024