Don't gossip and say nasty things!

‹ PrevPage 1 of 45 · Source p. 333Next ›
Comments

SPEAKER:

Just letting everyone know in the room that the microphones are voice activated. Everything you say will be picked up on the microphone. It is counter to what you normally have.

SPEAKER: Don’t gossip and say nasty things!

SPEAKER: You don’t have to press, it will automatically come on. Which is great because you know how we always forget to put on our mics. But it means if you speak and you don’t want it on the microphone, you need to press the button.

SPEAKER: It is a mute button.

LIZ CALLAGHAN:

Alright, I think we might commence. Welcome everyone to our second DRCO Forum meeting for the year. Thank you everyone for attending in person and online. I am Liz Callaghan, Branch Manager of co-design and engagement and I’m chairing today’s forum in the absence of Jamie Lowe who is on annual leave at the moment.

So, just before we start, just a couple of things to cover off. Obviously, would like to pause for a little minute and acknowledge the traditional owners and custodians of the Country on which we meet today and their continuing connection to land, sea, and community.

Today, in this room, we are meeting on the lands of the Wurundjeri people of the Kulin Nation. I pay my respects to them and their culture and to Elders past, present, and emerging and I would like to acknowledge that respect to any Aboriginal and Torres Strait Islanders here today.

I would also like to acknowledge and pay respect to people with disability, who are the reason the NDIS was built.

Very quickly, some housekeeping. It is a hybrid event. This is the second or third time we have done it. I think we are across everything we need to be. For those on Teams, if you could place your device on mute and turn your video off unless you are speaking, this will help to avoid any background noise and help with the internet connection.

For us in person, we just went through the microphones. Remember, if you want to say something off-line, keep your hand on the mic. All the mics are voice activated and on. Teams will automatically focus on the person speaking and bring them into view. So, let us know if you have got any problems. We have the tech going as we go on. Put it in the chat and we will pick that up.

If you are unable to use the chat, please click the raise your hand button on Teams. We have got Kate in the room again today, who is the hybrid between questions that are raised on Teams and will bring them into the room. Thank you, Kate.

For those in the room, the toilets are located towards the end of the corridor on your right. I think we have all been here enough times to know where those things are.

In case of an emergency, use the fire exit located in the corridor immediately to your left.

If you need anything during the meeting, please reach out to Caitlin, who can assist you. And we do have captioning for this meeting and the URL to the live captions will be posted in the chat.

So, I think we might skip the rollcall. We will be able to see who is online, I think. Just for those online, we can see you’re online, but we might just quickly go around in the room because the video doesn’t show who is here too clearly.

We will start with Bill. Just very quickly.

SPEAKER: Bill Guy from Community Mental Health Australia.

SPEAKER: Niha from National Ethnic Disability Alliance.

SPEAKER: Katherine from Inclusion Australia.

SPEAKER: 1

Caitlin from the National Disability Insurance Agency.

SPEAKER:

  • Caitlin Hannah from National Disability Insurance Agency.
  • Lisa Studdert from the NDIA.
  • Liz Callaghan NDIA.
  • Robbi Williams.
  • Simon Birchall from physical disabilities or just go.
  • Ross Joyce from AFTA.

LIZ CALLAGHAN: Great. Thank you. We do have an action log, which I think we will get you once we have had a session with Martin because I know he is… And follow up the agenda items. We will do that after we have heard some comments from Martin.

It is Martin’s last day at the agency. I am really grateful, Martin, that you have come here. It is nice to be in person with you. We have got a poltergeist in the microphone, it is moving on its own. It is a bit scary.

But we are very glad to have you here and we would like to just open it up for you to have a bit of a discussion and take questions. That was what we had planned.

So, I might, in the spirit of time, move over to you if that is OK, Martin.

MARTIN HOFFMAN: Thanks. I think that should be working. It is great to be with you all this morning. Good morning those in the room. Great to be with you. As well as people on Teams.

I think this hybrid meeting format is sort of the way of the world and we are getting better at it, so I hope people feel fully able to be engaged no matter where they are. As Liz said, this is my very last day in the agency.

I quite genuinely feel pleased that it is by the quirk of scheduling, this meeting which was long set happens to be on that day. I think that is quite appropriate and so forth that we are talking with you as the senior representatives of people with disability, participants on that last day. I very well remember the sort of equivalent meeting back in November 2019.

When we were all in the same room because that is the way we did it then. I think a bit further down the other end of this facility. And that was in the first few weeks of starting, so there is a nice sort of open and closing to that.

I’m going to make a few comments, short-term and looking forward. But as always, I’m looking forward to the questions and discussions you may have. Very pleased to have Lisa here with me. Now to some of you I am sure. Doctor Lisa Studdert will be taking over as acting chief executive tomorrow. It is tomorrow, you can call her on Saturday.

(Laughter)

Lisa will do a fantastic job. But there is a recruitment process starting ASAP. The board met yesterday, got that underway. If anyone wants to put their hand up, you are welcome.

More… I mean that sort of half jokingly, but seriously.

Also importantly, if you know of people that you think are appropriate, who might not jump out, might not be on lists, but should be, very soon there will be a sort of, the recruiter and the channel for doing that.

It is, the minister has been quite firm and open on the view that this is genuinely an open recruitment process. And he and the board want to see the best possible candidate.

So, you may well have ideas or thoughts or roles to play in that. Speaking of the government update, I would say you all know Mr Shorten well. You have engaged with him over a number of days. He has started an active way and visited the agency in multiple locations already. Spoken with staff across the country and I’m sure he will continue to do that. As well is continuing to engage directly with participants, the sector, providers, and so forth.

I think this biggest single thing he has committed to out of the election commitments was the Review, capital-R Review of the scheme. It is described as a review of the design, operations, and sustainability of the scheme. Design, operations, and sustainability. Broadly cast.

That will be a bringing forward of the Review that was always committed to for 2023 and the bilateral agreements between the Commonwealth and the states, starting that ASAP. DSS is preparing advice on that. Clearly setting the terms of reference will be very important. Settling how it is done. Those are matters for government in terms of Productivity Commission as was original or not.

Regardless of whether it is Productivity Commission or separate, who are the associate commissioners if it is to be Productivity Commission or the eminent persons panel if it is to be done separately.

You will have views on that, I am sure you will make those known. But that is really sought to be put in place ASAP, so that it is underway well and truly before the end of the calendar year.

I think that is a fantastic and necessary thing at this point in time. Today is also the nine years since the scheme started. There are some people who have been working in the agency or the precursors for 10 years now.

Of course, I know many of you have been involved at least that long in the scheme and its precursors.

The other thing I was just going to mention, we were talking about the agenda today. There are some great sessions on that. The system improvements for the CRM business operating system, we will have an update on that. I don’t promise that a computer system solves everything, but, gee, it goes a long way. Having a fit for purpose system with case management functionality is super important. Very pleased that we are going to be launching that before the end of this year, probably starting in Tasmania as a trial or first rollout site. Before moving nationally very quickly after that.

I know there have been good discussions about partnerships in the community this morning, and we will keep on working on that. We have the balance between the scheme and contracts finishing next year, and the desire for all parties that all LAC services and early childhood services are done and getting the balance right.

Please continue to lean into that, and getting back into the conceptions of the balance of roles and responsibilities in the scheme. The co-design work, Sam Bennett will talk about that. There has some really good progress that has been made.

I think that Sam will use one of the decks, or they will certainly circulate it, a very good presentation that was given at the last meeting. It really sets out the challenges of what are the actual decisions that we make against the Act and the information that is required for that and how do we do it?

I know that some of you in this room were at the last meeting, and there is really good work being done there. There have been things getting done in the co-design project and all the projects. It’s getting that balance, isn’t it, between moving at the appropriate pace to genuinely do co-design while maintaining that sense of urgency that comes with dissatisfaction with the status quo that we all share.

It is really about the tortoise winning the race over the hare, so go tortoise. You would have seen the increase in the disability support work in the real and large Fair Work Commission award wage decision passed on.

You have seen other prices frozen, subject to further work particularly in therapy, support coordination, and time management. You have seen the payment to large attendant care providers reflecting costs in the prior year of 21-22. Communications and that went out this week.

Pricing is another one of those tension points, where on the one hand we are very conscious of the feedback that we get from you, directly from participants around the dissatisfaction with the NDIS premiums, and on the other hand, providers are saying that the prices are not sufficient and should be higher.

There is a real tension there between different views, evidence, values, and finding a steering path to do that.

Those are just some of the tensions that the scheme is comprised of.

Those are the things that I wanted to talk about that are currently underway and that is important. Going forward over the next few months. Reflecting a little bit on the almost 3 years that I have been in the job, as I was saying with Ross beforehand, with fire, flood, and plague as well as the scheme itself, it has been quite extraordinary what we have all dealt with.

The scheme has almost doubled in that time alone in terms of the number of participants. There is no doubt, or no doubt in my mind, that huge improvements have been made, a huge difference has been made in people’s lives, tens of thousands and hundreds of thousands of people are receiving benefits and huge change has been made.

That reflects the tremendous efforts of the staff and I really have tried to care for the staff of the agency knowing that the very difficult job many of them do. We talk about the scheme and we talk about the policy, and we talk about the Act, sustainability, and the macro. I have tried never to forget that the scheme is about a relatively junior public service in the hierarchy, like the APS 4 or 5 in the public service language.

A regional town having difficult conversations with participants and their families and how the scheme works and how it should work. That’s not an easy job to do, and overall, our staff brings tremendous commitment and passion to that.

The thing that I will go away thinking about that we, together, have not really settled still after 9 years, is the fundamental questions around who is the scheme for, what does it provide, and how do we decide that?

This scheme is so idealistic, so brave in its conception. Society would attempt to define, not define, attempt to provide support on what was individually reasonable and necessary for that person. We just step back from the day-to-day, but that is so radically different from the way social services are normally defined, rationed, provided.

It’s incredible for Australian society to do disability in that way. Guess what? It’s really, really hard. We are trying to do that in a system that is incredibly qualitative in its decision-making. To the extent, this is an outrage, to the extent that the Federal Court has held that reasonable people can disagree on what is a reasonable and necessary support.

As I joke, that’s wonderful for lawyers. It keeps them very busy. It’s really bad for an agency trying to deliver a fair and equitable scheme and at the end of the day, I think it’s really bad for participants because it sets a level of disagreement and dispute even when everyone is acting reasonably.

Everyone being flawed humans, we don’t act reasonably all the time. Even if we were, we would have a level of disagreement. Then, you are trying to do it at a volume that is massive. We make over 15,000 decisions affecting participants and their plans every week. These decisions are made by over 1000 different people in over 100 different locations.

That is when they are actually at a location and not just from home. That just adds to this complexity of qualitative and subjective decision-making. We have to find a way forward on that.

The co-design project is a really key part of that. I think, and I said this at the DRM meeting two weeks ago to the Ministers, I think governments need to step up and do section 35 rules, the Act provides under section 30 for capital-R Rules. No such rules have been made.

We have a very subjective, qualitative, and short framework direct to the agency in terms of making operational guidelines and making decisions and those capital-R Rules that reflect the will of government, the will of the people, have not been made. I would urge, as I did tell the ministers that you also turn your mind to capital-R Rules around what is the expectation around SDA living alone in a two-bedroom apartment and so on and so on.

All of the cases that we see that level of disagreement and even disputation. I think it is a big ask for the agency and my APS 5 in Bendigo all having to decide that with the operational guidelines that I have set in the absence of capital-R Rules.

I hope that is useful and of interest as we go forward. The big Review is a chance to open some of those issues and move us forward. I remain, as I said, tremendously proud and excited about what Australia has attempted to do in the scheme. It is radical when you think back and see what Australia can do.

It’s only been 9 years. Medicare was extremely controversial, extremely disputed. Governments went into elections trying to get rid of it, but you can’t get rid of it now. It’s just the way that Australian society works. The NDIS will become part of the fabric in the way that Australian society works. We are not there yet, but in 9 years, perhaps.

4 Page 336 of 390

I leave with a complete sense of gratitude for the opportunity to have done this job.

It’s made me a better person, leader, and manager. Extremely grateful for the opportunities, learnings that this job afforded me in this time and, clearly, I wish the participants first and foremost, the scheme itself, the agency, all carers and representatives and advocates, all the very best for the future.

I will stop there, that’s more than enough for me now and as I said, very keen to have questions, comments, or reflections. We have scheduled a bit of time, so thank you.

LIZ CALLAGHAN: Thanks, Martin. You can direct the questions.

MARTIN HOFFMAN: Bill?

BILL GYE: Thank you so much for your contribution, and it was an interesting 3 years to do this work in. As you move out of the role, and maybe also moving out of any limitations that the diplomacy of your role requires…

MARTIN HOFFMAN: I don’t know if I’ve been particularly diplomatic!

(Laughter)

BILL GYE: I guess the question is, not necessarily now because it’s too much of an ask, to ask you to reflect upon your experience and take the opportunity to feedback from your new position of independence outside on how the scheme can be improved.

The mindset that I have there is what you would have done different which is now baked in, but something that could or should be improved upon? I don’t expect you to answer that right now, just putting a question at the end we would really appreciate your input in the coming weeks.

Like if you write your biography or a book or something.

MARTIN HOFFMAN: Thank you Bill, I certainly have a few notes jotted down so I might make a personal, citizens submission to the Review. (Laughs)

SPEAKER: Thank you Martin and for the work you have done over the last three years. As we were discussing before, what a ! of things you have bought into. Let alone with the scheme. You have presided over getting the scheme in full rollout.

I think as I said to you, there are a number of things that were literally kicked down the road to deal with in terms of complexity. Because there is a big focus on getting numbers through the door and reaching full scheme rollout. I think you did walk in during a challenging time without all the stuff on top of it. The only thing we didn’t have was a pestilence.

It was a challenging time for us all to work through that. The other side, when you mentioned the scheme, nine years rollout today, my reflection on that is, it has taken nine years for us to and as of today, we are actually getting some money towards providing our advice. To the agency and to the NDIS.

You know, and obviously, yes, there is ILC funding, but that is very much project funding. Thank you very much to yourself and the team were actually taking that on board and putting that in.

After nine years, we actually get paid for some of the many, many, many hours everyone has put into that. I have only been doing it for six years, but there has been a lot of work put in by everybody around the table and online and others that might not be here. Thank you for that recognition from yourself and the team.

Our contributions are important. We are all coming at it from the right place, along with the agency as well, in trying to get the best scheme you possibly can. For people with disability and their families across Australia. I just wanted to highlight that and say, it might have taken us nine years, but thank you.

MARTIN HOFFMAN: Is anyone online? I can’t see any of the little hands? Which is fine.

5 Page 337 of 390

LIZ CALLAGHAN:

OK. Are there any…

SPEAKER:

Mary. Just another little reflection. Many of us around the room and online were involved as the scheme has been developed. As the Productivity Commission went around the country twice, and I supported people with intellectual disability and held back to sit and tell the Productivity Commission what their lives are like and what should be better.

For many of those people now, their lives are better. But there is still, they are not perfect yet. There is still work to be done, but the scheme has made and is making a huge difference to people’s lives and we will of course keep shifting the goalposts, don’t we?

MARTIN HOFFMAN:

We should.

SPEAKER:

We have to because that is what advocates have to do. We focus on the bit that still needs to be done. So, we take for granted actually. Because we just expect that this huge, new, brave scheme as you described, ambitious scheme which came about because people with disability in every state and territory and much worse in some than others though, were being appallingly discriminated against.

And people get left on waiting lists for years and years and years and nothing happening for them. And no services being provided. So, it is not that we, we haven’t forgotten the shift that’s been made and the huge difference it makes. It is just that it is not our job.

It is not our job to pat you or agency staff or anybody on the back and say,

ROBBI WILLIAMS:

Making full use of the technology available to us. My eulogy is short, thank you and good luck. I recognise the challenges you talked about and people can agree to disagree on reasonable and necessary, it is a bit of a bombshell.

I’m thinking around stuff that purple orange is talking about with (inaudible) around something that I thought I had that in New Zealand when I was involved in mental health reform. Which essentially encountered similar issues to the NDIS, albeit on a much smaller scale.

But it was the scale I think. I think one of the things that we learned, when a system presents itself or a set of issues present themselves as being really complex. Sometimes, while one seeks complex solutions, actually that doesn’t end up happening. Counterintuitively, sometimes pursuing simplicity can be a way to navigate through complexity.

I guess, it is really to invite any comments you might have, Martin, around, are there ways in which, given some of the challenges that lie before the scheme now, are there ways in which the scheme could navigate through some of the difficulties by leaning into the idea of simplicity?

I know the idea of co-design, there is a very simple idea behind co-design. Which is that people who have got a stake in the system can contribute to produce a better system for the designers itself. That is a simple idea, there is a lot of truth in it. And all the other things alongside it.

One of the things I am aware of, before the UK became a complete basket case around social services, when I was visiting some of the lead authorities involved with social care 15 years ago, one of the things I was aware of that in running a pathway to support people to connect to the essential supports that they needed, there was a focus on simplicity.

Around trying to ask with as few questions as possible, using that to establish the person’s situation sufficient to land a draft budget. From there, the person that is able to develop some intentionality, some priorities, things ever like to work on for themselves and their family, then present that back to the funder for consideration and sign off so they can press on with things.

Do you think it’s a folly to think about things like simplicity for a scheme like the NDIS?

MARTIN HOFFMAN:

Thanks, Robbi. No, I don’t. And the staff all know that I often talk about simplistic solutions are designed or fail, but simple solutions, supposedly Einstein said that he would give anything for simplicity that lies on the far side of complexity.

You have to get to the complexity to get to the simplicity. I think that is right, that the scheme as we operate it today, there is a level of complexity in the decision-making that we expect of our staff. It is just impossible.

No matter how hard they were, no matter how good the management team it is, it is just impossible to make the level of complexity of decisions that we expect in the way a plan is constructed. To the level of what is the design of the bathroom that the home mods will approve or not approve?

In terms of the layout of the shower versus the toilet versus the vanity or whatever. On and on, the sort of, this many hours of this therapy on top of this many hours of that therapy, et cetera, et cetera.

It is just impossible at that level of detail to do it, either efficiently or fairly or quickly. And yet, that is what we ask of them. So, it takes this tremendous leap of faith and togetherness and co-design in order to say, we can all conceive of a system where an overall budget, draft budget, tentative budget, whatever, number, is settled on.

And then planning can start, with or without the agency being involved in those final decisions, more potentially with good support coordinators, with the family, depending on the circumstances. With carers, et cetera.

It takes that leap of faith that that overall budget figure is going to be reasonable and necessary. And it’s not going to disadvantage people. Which is why last year, we founded, because of the, we didn’t have the compact or the agreement or the faith, that you could give up line by line approval in case the total wasn’t big enough.

So, we absolutely have to get to the simplicity of an overall budget. That therefore does not require decision-making by a public servant. As I spoke in some of the hearings last year about Phoebe Sundays, it is ridiculous that my staff decides how much support she will get on a Sunday as opposed to a Wednesday. Because sometimes, a Sunday is one half times as costly as a Wednesday. And so forth. Let the family decide the hours of care that best suit their family circumstances and so forth.

7 Page 339 of 390

That requires us to get to that leap of faith together.

It is not just faith, there is science to it. You can work out, you can do the TSPs, you can look at them with different experts in different cohorts and different types of disability and come to a judgement.

But that is absolutely where the scheme has to get to. Or it will just flounder. In my team, we have good operational managers. I think it is extraordinary given the task we have set ourselves, the level of actual performance in terms of against time and against standard, that we actually achieve given the complexity of our task.

I talk to my colleagues running large private sector organisations and the whole thrust of business, be it in telcos, and electricity companies, in any large customer service organisation, is to radically reduce the number of products. Telstra has gone from 50 mobile plans to sort of four. Origin goes from 20 or 30 different electricity and gas plans down to two or three because you have got to get rid of the complexity to it. I say, “That is really interesting, we have got 520,000 products!”

(Laughter)

MARTIN HOFFMAN: That is sort of what is expected. Anyway.

LIZ CALLAGHAN: Very quickly, there are a couple of others.

ROBBI WILLIAMS: I think that the scheme was hamstrung by the costs. We have had this conversation with John Walsh in the past and with Sarah. I remain convinced that the best of intentions, when the Commission did their work on the disability care and support, the data that they were able to reach for wasn’t data that utilised support. It was data associated with conventional supports.

For people to have a fair go at having participation in terms of their choice and control, that create a profile of individualised supports that I think is very hard for the agency to deliver given the funding.

I know that it has moved, somewhat, but I think the assumptions that have sat behind the scheme’s funding has been predicated on conventional supports as opposed to what might actually be required for it to successfully connect to community life.

MARTIN HOFFMAN: I probably would have a view that we are now at a level of funding that, yes, it’s an investment. But, any investment, we still need to decide how much to invest in it and we still need to decide that in comparison to the other investments that we face. Or, that you have in front of you including other pressing social needs.

The community needs, other wider social needs. I think pretty much now, when we look at estimates, there is a lot of money and we need to look at how to use it better, how to use it best rather than looking at it as going consistently.

Mary?

MARY SAYERS: Hi Martin, I’m sorry that I couldn’t join you today, I’m in WA visiting family.

When I first met you, I spoke about the 54% of participants aged under 25 at that time, but we really need to look at the developmental aspects happening for children and young people as well as the disability related aspects of their life. I think the agency has done a really good job around research and investment in early childhood and thinking about what is needed in terms of a best practice model.

Yet I despair that the agency has yet to look at the developmental aspects for children above 9 to 25. How do we continue to advocate for children and young people, really need an inclusive life instead of setting them up for a lifetime of segregation and othering.

I remember when you first started, there was a lot of blocks for young people getting on the scheme. A lot of that has been cleared up which is really great, but how do we do it where we have advocacy to make sure that the message and advocacy gets through? We need to look at the developmental aspects that children and young people are at first and not defined by their disability. What got in the way of those discussions in the agency? Certainly, to my mind, there hasn’t been a lot of progress.

MARTIN HOFFMAN:

FOI 24/25-0332

I think that is probably fair. My somewhat controversial answer would be one of the things that the scheme, sector, community needs to think about is the balance between choice and control versus effective and beneficial.

I think the focus on… I would suggest, this might be going to Bill’s point about wider perspectives, but the overwhelming focus on choice and control as a mantra for plans, those that swung too far from that direction away from effective and beneficial that the scheme should fund things specifically for children…

Audio lost

(Multiple speakers)

MARTIN HOFFMAN: Thumbs up? Yes? Good.

I think we need to think collectively together around where the pendulum sits in terms of funding things that are effective and beneficial for the early intervention and developmental aspects of children and young people.

One thing that sticks with me is Jim Mullen from Amaze in Victoria now said to me,

This does represent a big chunk of the community.

We hope very much that your next adventures have much more sunshine and fewer storms. Please, never ever stop showing up.

We have just the tiniest, chocolate and a card.

(Laughter)

We realised this morning that we should have bought you some bright socks. So, all the very best from all of us, Martin.

(Applause)

MARTIN HOFFMAN: So, I’m going to leave quickly now and let you get on to the rest of the agenda. Is that what is happening, Liz?

LIZ CALLAGHAN: That is what is happening. All the best!

MARTIN HOFFMAN: Thanks, Cheers.

(Multiple speakers)

LIZ CALLAGHAN: Thank you everyone, Liz speaking. That was a very good session.

We will just pick up on the agenda items before we started the session with Martin. We know that there are a number of presentations today, et cetera. We have got some action items. We have an action log that attracts all of the action items. This was distributed to attendees from the stakeholder engagement inbox and a calendar invite earlier this week.

Did everyone get the opportunity to review that? The action log prior to the meeting? Yes? Thank you.

We will move on, if that is OK. For our next agenda item, just a reminder for everybody, if you are speaking, if you could just say your name before you start just to help with the captioners, that would be really beneficial, thank you.

For our next agenda item, I would like to welcome Garth O’Brien who is sitting next to me. Garth is the general manager of participant experience design, to provide us an update on the PACE program of work. I believe we have a presentation. There is lots of nodding, so that will come up momentarily.

Thank you, Garth, just to let you know, to mute yourself, you have to hold it down, but it’s voice activated, so you will be fine.

GARTH O’BRIEN: Garth speaking, thank you for inviting me. I would like to acknowledge the Wurundjuri people as the Traditional Custodians of these lands.

I’m here to talk to you about the participant process and platform improvement program. Thank you for inviting me here to give you an update on the progress, and possibly for people who haven’t worked here for much I was going to go through a quick recap over what it is and go into a little bit more detail as to what we are up to and what stage we are up to and also going into a little bit more detail around what is under the hood of some of the design.

The end of the presentation, we have a couple of prompts around what you would like me to come back to work with you on and get updates on in the future as well. So, thank you.

I wasn’t planning on going through every slide in the pack. But there is a fair bit of information. The intention is that we will continue to attend this, so it becomes a bit of a build on previous presentations and the like.

If you could skip to slide five please. So, what is the program? The program is really intending to do a couple of things. One of them is around changing our IT system. But that in itself isn’t a reason to do something.

Our current systems don’t allow us to be able to meet the obligations which we have set for ourselves under the participant service improvement plan and the participant service charter. The new IT system and processes which we are looking to clean up as part of that move are around making it easier for staff and partners to do

their jobs. So, less time fighting with the system, less time fighting to try to understand how a process is supposed to work.

More time being spent on participant experience. So, redirecting that effort which is currently admin and burden of system strain into interactions with people.

Looking at those interactions themselves, just picking up on feedback which we have received over the last 10 years. Around ways in which we could improve those, the experience of people interfacing with us.

And so, slide six is a very high level view of the various components we are looking at as part of the program. I will go into a bit more detail today on the participant journey.

I won’t talk about that so much, but it is taking a step back and saying, our internal processes, how do they support a participant in their interactions with the NDIS and more broadly?

The system and tools. This is where I spoke most last time. This is where we are moving from services Australia, SAP CRM system, which we have had for the last six years, never been fit for purpose, to an in-house built service sales system. Which is being managed by ourselves. Not being administered for us by someone else.

Looking at our portals, the participant portal, there will be a new portal which will be spun up as part of the new system. And there will be a provider portal later. At the moment, we have guidelines, Practice Guides, bits of research, and that is a formal bits of information which help people do their job and make decisions.

All of that sort of stuff is being consolidated and built into the system so there is a single source of truth for staff. Increasingly, that knowledge will start to come through our quarters as well so that people who are using the portals, our participants, have access to the same sort of information.

And our correspondence framework. That is one where we have an action and on 11 July, I think the date is, we are meeting with a few of you and the invitation is open to others to talk about how we should be thinking about with the correspondence and thank you to those who are attending that.

This is happening in parallel to co-design. Sam Bennett is coming in after the tea break I think to give you an update on that. The co-design is particularly the IGAPS, for information access and planning co-design, is one where the program which we are building here will eventually pick up those outputs.

What is not in scope for the program is to change the way which we make decisions. To change the information we gather. Or any of that stuff which is within the co-design programs. But we are building the system in a way where it can flexibly respond to the outputs of co-design.

As the information gathering for access and planning co-design gives clarity and guidance to what is the information which we should be asking to support an access decision or support planning, we will pick those new policies up and be able to feed them in with our major system overhaul.

If I could skip us to slide 10 please. The slides which I have skipped over give a bit of the business case as to why the current system we have got doesn’t support us to do what we need to do. And how it is quite locked.

In fact, because it is so locked up and the cost and time involved in making any changes, we have quite a fragmented way of doing business. Things are off system. We have shoehorned things into how the system is built, which ultimately leads to bad experience and repeating information. Work getting lost, backlogs, and the like.

The new system is being built in a way where business processes are contained within a package of work. That work is allocated to someone. It has a service level agreement assigned to it.

It is able to, it has the ability to do work item tracking. In the portals, in the participant portal, when an enquiry is lodged, you will be able to see where it is up to. When it is expected to be resolved. Be able to place queries onto it. So, if you haven’t heard anything for a while, then notification to the person who owns it around questions like “can I get an update on this?”

As well as that, I mentioned the knowledge management, but it really is quite key. Even if I am not changing as part of this, the way in which we make a reasonable and necessary decision all the way we make an access position, we are trying to get more consistent decision-making across our staff by making sure that the information that they need is available rather than relying on them being able to find it.

Not all access is equal, so it is not a sledgehammer approach. There are some things we need to do. There are other things that will come a bit more discretionary. If it is a piece of decision-making that is a need to do, for example, a risk assessment for someone to self-manage, so looking to see whether or not there are financial or

11 Page 343 of 390

FOI 24/25-0332

safety risks involved with that sort of decision, then it is built into the system rather than being in an off-system piece of guidance material.

As opposed to a decision, knowledge management which might be around various support options for certain circumstances. So, things that will be more contextual. These do not sit in the system, but on the side of the system with more guidance rather than mandatory.

Skill tagging is something that the system has and we are going to start to use. The idea of this is that work goes to the staff member who is skilled to do it. They can get extremely complex and there is a number of views around who is best placed to do work and stuff like that.

We are building the capability at quite a general level to start with. And then, again, as we get information coming out of the co-design sessions, that starts to get more refined. But having it built into the system to start with is one of the levers we have got around being able to respond without having to do major ICT changes in the future.

I spoke a little bit and I will talk about it a lot more in a sec, the reuse of the staff effort which currently goes into fighting the system. We have focused on what are the interactions which we want people to be having good experiences on both sides with.

And so, in the current world, that is largely focused on plans and plan implementation. We have got the opportunity and we have taken it to have a look at people who never apply to access or when they are going through the access process. In the old language, the Tier II sort of world.

Formalising some of those connections in the form of community connections plan and the early supports plan, which already exists, but bringing it in system for people with developmental concerns.

The community connections plan, early supports plan, is really around helping participants, people with disability, to connect to community mainstream. Maximise the supports that are available in the community. Work with goals, similar sort of stuff to what the formal NDIS (inaudible).

What the formal (inaudible). Sorry. Perfect, thank you.

And some of those concepts which we have around goal attainment and the like. Portals, I have spoken about already. I will talk about them a teeny bit on the next slide, which is on user acceptance testing.

This is kind of the exciting part. This is the update since I last spoke to you. Two days ago, we finished the end-to-end access to planning IT build. The thing has gone from being an idea to now we have got something built.

This is where the fun bit starts. All through the design build, we have been working with participants. So we have had a group of roughly 60, 80 participants who have been involved from problem statement through to design a solution. Our staff as well, there is 200 of them, involved in this process.

Now, working off the user acceptance testing. The same people who have been involved are now in the system testing it. The testing process is going to go for at least four months. And from here, we start to refine.

We have got the 200 or so people who have been involved in their testing. Every test case has accessibility versions of that test case as well.

So, the system being tested for a number of people is different ways of interfacing with the system. The group of people who are doing user acceptance testing over the next month or so grows. By the time we finish user acceptance testing in about four months time, we expect it will be about 500 people that are involved in user acceptance testing.

The idea of going it like that means is because it will have to be a national rollout when we do this. There are lessons from the last time we did a system change that there wasn’t enough testing. The accessibility was a second priority.

There was zero change management, which meant the thing flopped. Bringing so many people into user acceptance testing is to make sure that the system, A works, B, works for all staff and works for participants and C, that we have enough people who are familiar with it that when it does nationally roll out, there is localised support for the rollout.

So, I will now just go to slide 13. And just talk, this is a very busy slide. For those trying to decipher it, I won’t talk you through at a high level. Feel free to jump into any of the detail that is jumping out to you. It is the way we have broken down the participants end-to-end journey and their interface with the NDIS. I am not a big fan of thinking about it in a linear way, but is the easiest way to put it on a page.

12 Page 344 of 390

The bit that I am most excited about is actually box number one here which is, which looks very small compared to everything else, but it is probably the newest bit for the scheme.

Which, it says “learn about the NDIS and other services.” We call it partner supported connections. But it is around the two to 4 million people with disability in the community who, most of them, won’t ever apply for the scheme or be eligible the scheme. It is around how do we build the infrastructure around that, build the capability to have a service model.

There is a number of discussions going on around what the model looks like, but in any event, it is a bit of a black box around what happens. So, in the community supported connections, it is where people will first interface with the scheme.

Be able to work with a partner in the community, work within LAC, work with an early childhood support coordinator. Community connector in regional and remote areas. To understand what their needs are. To work through whether or not there needs to be some more intensive support on formalising plans, formalising access to supports.

Starting to capture what those referrals are and the success of them, so that we start to get data points around how good it is, the mainstream interface of services provided by the government and across different communities.

At some point though and for some people, that will be quite quickly in the exchange. It will be evident that the services in the community are not sufficient. There is additional support required, which is best provided by the NDIS. So then, the access process is a supported process

Which will reduce the need for us to ask for additional information. Give a bit more clarity around what happens next. That that person who was working with you on community connections also works with you to approach the scheme and submit access requests.

We are building the process for the access decision, but not touching it. So, as I say, building it, waiting for the levers that come out of the co-design to understand what changes in the process. The process is there.

Number 6 in this box was a positive to come out of COVID-19 and other unfortunate situations. The check ins that we have been doing with vulnerability well-being check-ins have become the norm. It’s in the order of 1,200,000 of these a year once we roll it out.

The idea is the check-in becomes the most common interaction between the participant and the agency. It is a check-in on how your goals are going and how your supports are going, what barriers you are experiencing. That is the standard bit but it’s also on how to improve monitoring to allow us to be more responsive.

If you’re seeing changes in the way, participants having a bad experience with providers, as we are having these check-ins, we want to identify those questions and make sure that everything is OK.

Planning, as I said, we will slowly go through this at some point. After their first plan, some people move towards access. Other people, as part of the check-in or the participant reaching out to us, I have a little bit of a dream that if no one ever has to quote each part of the Act when they are engaging with us, that’s a win.

… It is a document, so it should be part of a natural person’s engagement. Sometimes I make a joke about not knowing which part of the Tax Act applies to me and then I get shocked when I go to the accountant.

Part of the development plan, this is going into a planner activity. Although partners in the community, early childhood support, early childhood partners help serve to provide information that informs the development of the plan.

The plan itself is something which a delegate will work with a participant to be developed. The skill that I was working at earlier is that the plan will go to someone earlier to make a decision in most cases. It is in the design that a participant will be meeting with the person making the decision, whether or not that is face-to-face, virtual, or on the phone. It’s meant to be more flexible, and hopefully that will open up more opportunities.

The construct of the plan, the budget, we are moving towards a more flexible development of the plan and so that means in most cases, the budget will be described in more of the support categories level, so this is funding to assist with core daily activities, not going into the specifics as to which services you can spend it on.

Instead, the discussion is moved into plan implementation and the plan handover. It’s doing a couple of things. It is allowing us to have more flexibility in the way a plan is spent and the way that participants can make decisions around how to best support their needs without having to come back to the agency to adjust things.

13 Page 345 of 390

It is also allowing us to get clearer around what can be spent on.

At the moment, we do have the support catalogue and matches to the support categories. It is a bit of a monster of a thing to try and look at. It’s hard for us to say and see how each plan is going to be spent even though there is this document that exists. The reason for that is because each plan is built differently and so the constraints within it at an individual level, moving to a more specific whether the plan is structured, we can be more clear for every person that these are the breadth of supports that can come from the budget.

I’m just trying to get through the main bits here. Having more formal handover processes, so people don’t need to tell their story multiple times. The way in which a plan is described is going to be structured in the evidence and makes it easier for it when someone else is looking at it, when someone else is helping a participant understand how that information is going to be consistently represented across all the plans, meaning that people find it easier to consume all the information and do a good job of explaining.

We were fortunate enough to be able to get in the variations in the NDIS Act update. We were building against in anticipation of that, but we don’t need to go through formal planning processes to be able to adjust that.

Then, over on the last bit of this one is running enquiry advisement. This is the most frequent type of interaction which people have with us. Planning happens once a year or so. In the future, formalised planning will happen every 3 years or so.

Most people’s interactions are the short, sharp ones. They are also the ones most poorly recorded in our system. Formalising this so that they are located on the central record, going to the person who is most skilled to do it, having SLAs associated with it so that they… So that you know how long that it is going to take.

I might actually pause for a bit because I feel questions coming through, I can’t see them so. After this, I will get into what are the opportunities for us to work together.

LIZ CALLAGHAN: Thanks, Garth. We do have a break scheduled in about 10 minutes but we will carry it over for another 10.

I will pass it on to Kate to voice the questions.

MARY SAYERS: Hi, this is Mary from Disability Australia. Hi Garth. I’m assuming the 7 to 9 year olds who might not have a full plan, and I think it’s really important that you are clear around what these new plans are as compared to traditional planning particularly when explaining it to other stakeholders.

Also the question around this ‘exit’ from the NDIS. Again, I think you are referring to children and young people who may not need ongoing lifetime support. I think it is really important, it comes to earlier points around the pathways for children and young people versus the pathways… Because, I think I can imagine this will strike fear into the heart of many people have already proven lifelong disability and there is this reassessment.

I think it is really important, language is everything. I think I understand what is going on, but I have never heard of this community connection plan and I’m pretty close to the work.

Any comments on that would be really appreciated.

GARTH O’BRIEN: Thank you, great questions. As I said, not a fan of the linear view of the journey because it looks like everyone goes through every step and that is certainly not true. I might start with the transition out of the NDIS.

Yes, there is no intention there at all of having people go through that as part of the permanent disability pathway. It is really around early intervention. And, if it is successful, how do we normalise that some people’s journey with the funded elements of the NDIS is time-limited?

And then, what does that look like? The reason why it is on here, though, and I skimmed over it a little bit, but what we really want is for the person who is involved in box number one, learn about the NDIS and working with you to be consistent as much as possible throughout the entire journey.

When you get to box 13, which is transition out of the NDIS, we actually end up in box one which is around that ongoing interaction back into the community. On the community connections plan, you wouldn’t have heard of it because we developed it as part of this. It’s not intended to be for any specific age group, it’s around children and adults.

14 Page 346 of 390

FOI 24/25-0332

It documents where those connections are required more formally, things where there is a need for us to be able to make sure that they are working and the like. The only supports plan, we have (inaudible) at the moment for children under six which is what the current policy says around early support.

Is a world in the future really supports are rolled out for other cohorts were that is appropriate and the system is being built in a way which accommodates to those policy changes in the future. That Community Connections Plan is something which the participant groups will be working with and is a good way to formalise what happens in that tier two world at the moment.

LIZ CALLAGHAN: We have another question online, and we have Katherine and Bill in the room.

KATE JUDD: Kate speaking, we have Jenny and then Katherine and Bill.

JENNY KARAVOLOS: Hi Garth, Jenny from Australian Autism Alliance. Great presentation at the moment. Is this… Not to see if they can break this process, but what is intuitive or logical to someone else might not be for someone on the spectrum, for instance or any other disability?

GARTH O’BRIEN: That’s a good question. I would be so bold as to say that we have to break it. We want to break it rather than when it’s out in the real world. We have only just kicked off, but with so many people involved it means that there are people who are going to deviate from the normal path, and it is encouraged.

SPEAKER: Thank you, we will go to Katherine McAlpine.

KATHERINE McALPINE: Thank you, I had questions about the Community Connections Plan and am glad to know that I’m not the only one who had questions about it.

You talked about risk assessment and there are groups of people who self manage large plans who have real problems interacting at the moment. I would like to invite you right now to come into community practice and talk to that group. I think that group particularly needs part of it.

There is also the flagging of people covered by grandfathering provisions. People who might not meet the requirements now, or who have been long-standing institutionalised. Some older people, we have heard stories of 60 year old women getting plans cut.

It is a small cohort, but there are no flags in the system. At the moment, there are problems in SDA that I’m aware of where they are grandfathering in the system and there is no way to get that flagged. It’s ridiculous. I’m particularly talking about people who have been institutionalised. Not people who have come in since the scheme began. There are very specific things to make sure that they don’t get lost in what comes across as the standardisation of things?

I understand from your perspective, this is more consistent to decision-making but for us, what about the people, to Jenny’s point, are standardised? I have got some other questions, around people in the complex needs support pathways, but those are the things that come straight to mind.

GARTH O’BRIEN: I’m not aware of the specifics, but in terms of general capability, 1 of the things that makes those current grandfathering decisions hard for a person to consider when they are making the decisions is that they get lost.

The system we have currently got, it is essentially a long list of every interaction. That list keeps going. He spent years trying to look for something in that list. What comes across as being standardisation in this is that standardisation of where something lives, which then makes it easier for more consistent decisions. That is what I mean by consistent decisions, decisions that would be able to be made over and over again because the information is where it should be.

KATHERINE McALPINE: You are talking about consistent decisions for one person, as opposed to consistent decisions between people?

GARTH O’BRIEN: Both. Consistent decisions for people’s experience plan after plan, it will be the same information that is able to be found. And then in terms of how staff consider that information, consistent across the decisions that are being made across participants because the guidance material on how to interpret information…

15 Page 347 of 390

KATHERINE McALPINE:

If if I give you a person with complex needs who might have a one million dollar plan and whose family might be self managing, if they get some consistent decisions, they get consistently told that they have to go back and test the market when they have really had service failure, they get told that they can only self managed for six months because when did all this evidence and evidence and all the rest of it… Want to make sure that the group of people are not going to be…

That is a group of people I am particularly inviting you to come and be with the people at the pointy end of the stick. It is not going to be significantly disadvantaged and have an even more workload than they do at the moment, which is astronomical.

GARTH O’BRIEN:

I understand. Thank you.

SPEAKER:

Bill and then another question in the room. Niha and Simon. Bill had his hand up first and then Simon and Niha.

BILL GYE:

Bill from Community Mental Health Australia. Robbi set the standard here. I know we are at the pointy end of time here with morning tea coming out. I have two topics. I think the issue of goals and outcomes is a really thorny one and I think that is still a conceptual mess for us there.

I will bring that up in the Investment Effectiveness Program discussion this afternoon. The question I want to put, and this may already be on the agenda, but thinking of the DRCO Forum as partners in the program, Salesforce offers us all sorts of opportunities in terms of reports – more querying.

It would be great to be able to engage with the scheme to gong query and find out information that is relevant to us if we have access to that. This is identified obviously of course, but at the moment, the way it works is, we went into the quarterly or six monthly reports come out. Which is a hazard but still curated set of data that is useful for us in our consideration.

But that would be great if we could put that on the agenda as a consideration for us to be partners to be able to go into the dashboard, to access reports about the scheme would be really useful for us.

SPEAKER:

Thanks, Bill. We will take that as a comment. I wasn’t sure who is first, but Simon, would you like to go first?

SPEAKER:

Isn’t it really an action to put it on a future agenda?

SPEAKER:

(Inaudible)

SPEAKER:

We will take that as… Caitlin already captured that. ESP, thanks, Katherine. That’s an action, thanks, Bill.

SPEAKER:

Simon from PDA here. I am concerned about letters been developed by the CRM and then sent directly to people without some kind of checking by a human being. Much as computers are wonderful things.

The main thing about it is that we get called from time to time by very upset participants who are being told that they cannot have a wheelchair and they are expected to use a walking frame, for example.

And then the only thing that the letter says is that if you are not happy about this, go to the AAT because this is your review and you are stuffed basically.

There is no phone number, there is no email address apart from the 1800 number and enquiries@ndis. That is not good enough. I would like to be part of the correspondence meeting group if I can.

Also, what else was I going to say? I just lost my thought. Can you bring us a sandbox version of the tools? That the planners are going to use, so that we can see how it works. Because if we know how it works, we might be able to help reassure people that things are being done properly rather than just a public servant who was looking to make sure that they meet their KPI of cutting people’s plans. Which is probably something that people think happens.

GARTH O’BRIEN:

16 Page 348 of 390

That’s certainly not one of the key performance indicators, but, yes I can.

As I said, we just finished the access and planning end-to-end which means that by the time we get to the next one of these, I would like to give you a demo of what it is.

Just a bit of assurance as well on the correspondence. You are very welcome to attend. There is, not every letter is being designed in a way which is just spat out of the system. Depending on what the letter is, it goes through human writing and guidance before getting sent out.

SPEAKER: Thanks, Garth. That is an action, you are going to have a look at access and planning and to end as a sandbox version. Neha?

SPEAKER: Neha from the National Ethnic Disability Alliance. Thank you for the presentation. Just a quick question. When you mentioned community connections, I just wondered if that would be modelled like the previous community connector model that was there?

And if yes, will that be delivered by the partners in the community? Because the last one was actually delivered by the grassroots level organisations. I know it is still the NDIA, the agency that runs it, just checking if that is still…

GARTH O’BRIEN: The intention is partners in the community. The system and the process which is being built is really going to apply to what the current way of working is. So, but it is being built in a way where it doesn’t, where it can change as policies change, without being a major overhaul.

Right now, the intention in here would be that our current partners in community doing the community connections, agency planners doing the plan build stuff, in reality, it is all just roll out and systems.

If tomorrow we decide that we want access staff to be doing plan decisions or something ridiculous like that, it is just a switchover of roles.

NEHA: Just to follow on from that, with respect to community connections, we have access supporters as part of that. As well as having help with every other thing we have done. Mainstream support and connecting them to different services within the NDIA. And for those community partners on the outside.

Have we already have a good understanding of what the partners in the community will be doing with respect to this?

GARTH O’BRIEN: With our current partners.

NEHA: Sorry.

GARTH O’BRIEN: It is not currently captured on systems. It is only through working with them to understand what it is that they are doing and be systems being built around that.

NEHA: OK.

GARTH O’BRIEN: Did that answer your question?

NEHA: Kind of. We can maybe discuss this further.

LIZ CALLAGHAN: Thank you. There is no more questions online. We might bring this session to an end if that is OK, Garth. I know you had some more material you wanted to go through, but I think the lesson is we didn’t have enough time.

So, do we want to have our break now for 15 minutes and then come back? And, for those online, we will be back at 11:55. Yep. Thanks, Garth, for that.

I think, Garth, you are very open to fielding any questions this group might have around specific issues that we might not have covered on the slides today, is that OK?

GARTH O’BRIEN:

Absolutely. It is easier if they come through…

LIZ CALLAGHAN:

Through us. And we will collate them. Let’s undertake to do that as well. Thank you.

(Break)

SPEAKER:

Test, test.

(Multiple speakers)

SPEAKER:

I don’t think the sound is on, at least here in Zoom land.

LIZ CALLAGHAN:

We are just waiting for a few stragglers, apologies. Thank you everybody. I think we will make a start, but others are held up having a discussion. So we would like to welcome the general manager of policy advice and research, Sam Bennett, known very well to all of you, to take you through our next couple of agenda items. Sam has a slide deck that will put up momentarily. Welcome, Sam.

SAM BENNETT:

Thank you, Liz, wonderful to be here. Hope you are all well. We’ve got I think one hour, is that right, Liz? We’ve got an hour and we can use that time however you would like but we sent some material out in advance and will share those slides and walk through them. I should just say we’ve also got Joshua on the line, who is our branch manager for strategy. He will be talking and providing some updates on a couple of the projects we’ve been working on through codesign with the disability community and that is the CALD and Aboriginal and Torres Strait Islanders strategy.

I thought it’s probably a good point in time first out in the financial year to give you a full run through and we provided material on that basis, that you’ve got a good picture of all of the work that is underway. If there are specific things that we don’t get to or cover in the level of detail you would like, please get in touch with me outside of this and I will happily do that.

What I thought we would probably do is approach this in a couple of chunks. First, I’ll walk through some of the slides that will give you an overview of the approach we are taking, as well as some insight into early thinking we’ve been doing without codesign advisory group around evaluation of the work. Probably take about 5 or 10 minutes, then we can pause for any questions or comments, then the second and longer piece would be to run through briefly the approach we are taking each of the six projects to give you an update there. And then to provide an opportunity for any questions or comments there might be on that.

I will just check, does that work for you? Does it sound like a reasonable use of time? Good. If you can move on to the first slide in the pack and onto the next, to give you an overview, this is material you are familiar with, just a reminder of the engagement framework that we published at the back end of March this year.

It talks about the different ways that we engage, the attitudes that we want to underpin our approach to engagement and talks about codesign as well, and you will recall our conversations kicked off in September last year that we committed to learning by doing as it relates to codesign and just getting on with some of the important issues that the scheme faces. We did a bit of priority setting, including with this group and our independent advisory Council around the focus of some of that independent learning by doing.

I want to thank you around the table as well for your involvement in that process over the last nine months. It’s still relatively early days, I would say, but plenty of learning is being done. I won’t labour this, there is only two points I want you to take from it. One is, we are not co-designing everything but trying to reserve this for some of the bigger strategic issues facing the scheme and impacting most on participants, where we confirm with you that there is a high value of working collaboratively on solutions together.

All of our engagement should be transparent and respectful, hope that’s how we approach it. Codesign is the way we are doing everything. And the second point I would make, and I hope this is evident as I walk through the projects and Josh talks to you about a couple of the others later, there is no fixed blueprint we are applying here, no one single approach, we are thinking flexibly and creatively about how we codesign these different programs very much on the basis of the issue at hand, and also what stage we are at in the process.

18 Page 350 of 390

As I talk through some of the latest slides, on policy projects where we’ve already spread the net wide last year and done significant public consultation and got a lot of feedback, we are starting from a different point and using different processes that we are for the others.

That will give us a range of different approaches to look at to determine as we progress which we adopt and use more widely.

Just a reminder of the governance arrangements that were set around this for you, a number of you have been on our codesign advisory group for some time now, I think it’s about 10 or 11 times, Liz? That meeting beginning back in October last year, we also have the three members of the Independent Advisory Council on that group which exist to provide us with advice on how we are approaching codesign and what the priorities on that should be.

As you will see on the next slide, we are moving on to having some initial conversations around evaluation, sorry, if you could just go back. And just the other point to draw out is we have set up four projects we are progressing the individual pieces of work, steering committees, which are doing the co-planning phase up until recently, but the stage we are at across all of these projects now is that we have endorsed codesign and engagement plans by the steering committees that were in the process of beginning to execute. I will talk to you about how we are going about that in a moment or two, but those are bringing together participants and network DCRO representatives, our independent advisory Council, states and territories, DSS and the Quality and Safeguards Commission as well. So an awful lot of energy that’s gone into the co-planning, after 30 hours of meetings in those steering committees on the oppressed codesign for each of those individual projects.

On the next slide, how we evaluate this is really important. It’s a different way of working for the agency. It’s something that we want to get right, something we want to embed in our culture and ways of working for the long-term, and to do that well we think that having an evaluation around the process from the early stages to support continuous improvement of our codesign approach and methodologies is a really important thing to do.

So we’ve started to have some conversations with our codesign advisory group about that, specifically around the scope of such valuation and how it would be conducted. We are at the point of having drafted a theory of change which we are happy to share with this group, if you would like to see that. It needs further testing and refinement so certainly not finished.

And we’ve been talking about what some of the key questions are that we want to ask of such an evaluation. I think the two other points I would make from this slide, a lot of the conversations have been around scope and what we want to be clear about is the process of codesign and the extent to which that works in empowering the disability community to be working with the agency to resolve the issues with the scheme. Evaluation doesn’t extend, or at least this one doesn’t, to each of the individual policies we are working on. There will be a separate evaluation as it relates to those and will come to those in good time once those policies are agreed.

The second point is we will commission this externally, I think it’s important we have an independent perspective on this. Our advisory group has been clear on that and we are in the process at the moment of just asking for feedback from organisations that might be approached for such a piece of work.

Once we’ve codesigned the evaluation framework, which is what we are now doing with our Co-design Advisory Group, will be going out and talking to the group about how we involve people and how we are in line with Commonwealth procurement rules.

I just want to share with you the draft questions that we are posing here on the next slide. Around evaluation. They relate to whether the approach to co-design is appropriate to achieve its intended objectives, whether the process itself as it’s being used in each project is operating according to what we know is best practice around successful co-design. Whether the early outcomes from the process are achieved, and there are a few listed there, transparency of decision-making, shared understanding and improved understanding of the issues from different perspectives. Between the agency and the disability community and all of its diversity.

A disability community that feels empowered and has confidence and trust in the NDIS and the Agency, and are desirable and feasible policy solution for key stakeholders, because what we want to come out of this process is something that is desirable and so is feasible for us to implement in the context of the Agency’s Administration of the scheme under the Act.

And then finally whether the approach is likely to endure, so sustainability but not in the way that we often talk about it, what it means is that is this something that we can sustain and adopt more widely? So we can co-design more of the solutions we need for the scheme into the future.

I thought I might pause there before we get to the individual projects and just invite any feedback on that. If you have comments on the individual projects, you might want to say that for the next pause we take but very happy

FOI 24/25-0332

SIMON: Simon from PDA here. I’ve got ongoing concerns about the overarching scheme for the co-design project, co-design process and that kind of thing. I think there is far too much focus on steering committees and they are standing in the way of direct engagement between us, for example, who are not on the steering committees and also participants, in that everything is funnelled through steering committees, it’s still a very tiered approach and I’d really like some thought on revising that, but it might be too late if these decisions have orally been made.

I’ll talk about the IGAP thing, which I am particularly miffed about.

DR SAM BENNETT: The steering committee’s role, for the most part their job is to take us to a point where we’ve got codesign and engagement plans endorsed and we are now going out and having that what a conversation, and I will talk to you about that in relation to each of the projects. They will have a role further down the track which is helping us to make sense of some of the outputs from those wider conversations and engagements we have, but that is the role they had, which is very much the co-planning phase of the work we’ve been doing.

And we’re kind of beyond most of that now, so that’s what I would say to you, is that those opportunities for engaging on all these issues will be coming down the track.

SIMON: The IGAP one, the steering committee so at the end of the process as well.

SAM BENNETT: The steering committees help us to get the design right, we talk to everybody we need to and hear the voices and perspectives…

SIMON: There are key activities just involved in the steering committee.

DR SAM BENNETT: Which key activities?

SIMON: I don’t want to pre-empt the discussion if anyone else wants anything about it but

SPEAKER:

It seems like the old consultation model.

SPEAKER:

I think we will go to Catherine.

CATHERINE McALPINE:

You asked to circulate the theory of change, can I accept that offer? And when you talk about co-design the evaluation of the individual projects will happen separately, well that include a comparison of different projects taking different approaches to co-design? A comparison of those projects? We are happy with some processes but not others.

DR SAM BENNETT:

Within this evaluation, absolutely. When we have a final home and living policy and it is implemented, we would evaluate in a separate process.

CATHERINE McALPINE:

There is different satisfaction in processes. This one is a complex one and might need another discussion. We have an ongoing problem about the way evaluations are designed in terms of accessibility and the participation of people with an intellectual disability. When we talk about the supported decision making co-design process, there is hard work involved, a lot of people with intellectual disability and psychosocial disability.

I would like to have a more detailed conversation about that. If this is a problem with government in general, not unique to the NDIA, an opportunity to have with the most approachable government agency in terms of interest in this, is to say you need mechanisms where people with an intellectual disability can participate in everything including evaluation.

The move and evaluation has become very complex. Fewer questions but they are very complex. There is no easy read version. I want to talk about how we unpick that.

DR SAM BENNETT:

These are drafts, not final. They are not the questions we would ask people, they provide us with a frame for how this might come together. We have heard this advice from our advisory group as well, and when we commissioned this we make it a priority it is accessible.

CATHERINE McALPINE:

I would like to have a deeper conversation. We had a terrible experience through the DES reform process, consultation questions and what have you. It is about the whole design in terms of the way you recruit and other things for it. It’s not as simple as making sure the questions are an easy read.

DR SAM BENNETT:

Certainly not seeking to minimise the importance of that.

LIZ CALLAGHAN:

Kate or Bob?

BOB:

Bob Buckley from Autism Aspergers Advocacy Australia. Autism is one of the big groups in the NDIS, but I am not saying that reflected in the co-design process. It is hard to detect our presence in this. I’m wondering why it is like that, and will it deliver the sorts of outcomes? I think part of that has to do with the fact that the issues that are being addressed are not really the ones that confront our community in this process.

The other half of this, we just went through an election and one of the things that got up through the election, we hope to see a national autism strategy emerge. In none of this do I hear any recognition of the reasons why we have asked for a national autism strategy, and that is because we get left out of things like this all the time, and if we don’t say we have to be recognised, this is a group that is come from being a disorder 30 years ago to being the most numerous primary disability and the NDIS and yet it is not reflected in most of the processes.

I have concerns about this process in so many ways. I want to put that on notice. Thank you.

DR SAM BENNETT:

All I can say is we are keeping a close eye on the demographics of people we speak to through these processes, with a view to making sure we reach all the audiences we need to. We have participants with autism on a number of our steering committees and we’ve taken it to the autism advisory group. It is a work in progress but we are mindful of moving all different audiences and autism is very important for the reasons you have outlined.

21 Page 353 of 390

MARY SAYERS:

I probably want to respond to both the previous comments being critical of the process. An important thing for me is not throwing the baby out with the bathwater. Having to reconvene, CYDA convenes the forum for DCEOs to meet monthly. Interpreters keep getting cancelled. We were meant to have a meeting last week, we would have been able to get prepared for this meeting today so we could say, this is the joint sector view about what is working well and what is not.

The whole challenge of interpreters means we don’t go ahead if we don’t get interpreters. I wanted to respond to Bob and Simon, we would have been in a better position to come to this meeting had we been able to meet last week. Despite a long-standing booking, we couldn’t get Auslan interpreters confirmed.

I want to acknowledge Bob and Simon’s position but also be defensive. CYDA is trying to make sure we are keeping everyone in the loop but we are having access barriers that make it hard. We are meeting not next week but the week after, it is after the Codesign Steering committee. Just wanted to acknowledge that Simon and Bob have valid concerns but we have not been able to come back to you as a sector and say this is what is working well and this is what is not working well.

That is challenging for us, as one of the DRCOs. The second point we’ve talked about the co-design’s committee, the difference between the group and the co-design process. The advice that all of us, and I am one of them, who has been on the Codesign Steering Group committee, we need to make sure we have representation of diverse cohorts in the co-design.

I think that has been listened to and I wanted to reassure Bob and Simon, even if you are not yourself on the steering committee, many others are advocating for a wide diversity of inclusion of participants.

LIZ CALLAGHAN:

Thanks, Mary.

DR SAM BENNETT:

You are right, the most common conversation we have been having across the steering committees is about wide diversity of voices. Today is one opportunity for you to tell us what is working and what is not from your perspective. We welcome further opportunities to have that conversation with you, it will be a rolling ongoing evaluation that gives us insights into how we improve the process as we move along.

I would suggest we move into the content aspect. That was about process and how we are working and thinking about evaluation. There is some information in your pack that relates to the individual projects we are progressing through some process of co-design. They are quite different and that will be evident to you as we walk through these.

I will talk to you first about information gathering for access and planning, I have talked to this group about that a couple of times previously, but to give you an insight and an update on that and there are members on the steering committee for this project that are part of this group. Obviously, we welcome your perspective as well.

A reminder, this is a task that came out of last July’s disability reform ministers meeting where we were tasked to develop a person-centred model of assessment. Our process to do that is starting very much from needing to understand all of the different perspectives that exist across the sector, participants and the wider disability community, about how things are going at the moment, what are people’s experience of NDIS access and planning processes and decision-making now?

That is following a co-design principle. We need to have a shared understanding of the problem before we move on to think about how it might be fixed and resolved. A lot of the conversations to date have been about that first stage of work, and there are a number of things we are commencing, have commenced or will be commencing shortly, which is summarised on this slide.

We have been running a number of focus groups, we put the word out through Participant First, upward of 100 participants are working on a series of focus groups that Graeme Innes has been facilitating to ask a series of questions that we agreed with the steering committee about what are the things people find most challenging and difficult with access and planning processes with the evidence requirements that exist as part of that.

We have had three, a further three will be concluded by the end of July and transcripts of those will be synthesised and provided back to that steering committee. We have also got a process underway now where we have reached out to DCRO organisations about how you can assist us to reach different cohorts and population groups and run a series of workshops to hear from your constituents and important stakeholders as to their experience of access and planning processes as well.

We hope that work will commence sometime in August.

And to spread the net wider, codesigned with that steering committee a survey which will go out today. That is for prospective participants, applicants and existing participants of the NDIS and carers and family members to provide their view on the same set of questions that are being asked in the workshops about people’s current experience of access and planning processes. What is working well and what is not. As Robbi described, that is funnelled into further conversations about what it tells us are the key issues we need to be solving and the short, medium and longer term options for how we do that. This is only the first stage of our wider codesign topic, is going to run at least a further year. There will be other points in the process where again we spread the net wide to talk to people about how we move forward. If you can move the slide on.

What we are really trying to make sure we get from these processes is some tangible short-term improvements where we can, because every single week that passes, there are 11,000 decisions made by the Agency primarily in planning under our existing model. There needs to be some momentum behind our improvement attempts in that context, and making the link back to Garth’s presentation previously, there are ways we can improve that. If there are forms for example they could be clearer about evidence requirements, templates that could be made clearer and simpler, we could pick those up as we go, and then the longer term task that we have been given by governments is around what the assessment model might need to look like specifics of the NDIS into the future.

If you can move the slide on. I just wanted to flag this further, I said that would be a survey going out this afternoon, we are asking about things on the slide here, experiences are providing information to the scheme, experiences in relation to planning meetings in that regard, as well as any other feedback that people want to provide us. It will be open until the end of August. As I said, we’ve taken extensive feedback on this survey, I think almost all of which we’ve adopted from our steering committee. And we really value any help you can give us by publicising this and getting it out to your network so we can get the broadest response we can through this process.

Moving on to the next slide. Home and living another big issue for the scheme, last you back in December we put out a summary report and feedback, and now we are moving into a slightly more targeted stage on the basis of the feedback we received to look at what design work needs to be done around this policy. There are four key components that we are co-designing around which comes on the next light, but we’ve established a cortisone group, participants, do CRO representation providers and also four different testing groups.

So we are taking design work to that core group and then broadening out to those testing groups to help us to ensure we’ve got all the bases covered, including people with intellectual disability, complex communication support needs as well. We have engaged a co-facilitator for our design challenge work in Natalie Wade, who I think is well known to this group, and we are also working with Robbie’s organisation to help us to reach out to some of the other important communities we need to hear from as this work progresses.

This is just a reminder of the four components consistent with what we consulted on but further refined through work we’ve done with this particular steering committee. And the groups that I’ve just referred to will be helping us to put some meat on the bones of these, we really want this policy to provide much better systematic upfront support to participants to understand their options and think about what home and living solution might work best for them.

We consults on the potential extension of the line item that exist for individual living options to the much broader cohort of people with home and living goals. So that is where we think much more broadly about how we can do that.

And this is a link to IGAPS, and what will enable us to streamline access to participants to a home and living budget, we want that budget to be more flexible so people can use it on a broader range of options. And we also think that there is a strong case for there being a delineated stream for those with home and living goals, so what does that look like? So we’re getting access to the best advice and support and specialist knowledge on home and living for the disability in those circumstances.

I’m racing through but there is a lot of content, so just want to cover these off. Participant safety, this comes off the back of the piece of advice from our advisory Council looking at all of the preventative safeguards that exist within a planning pathway, right from access through to check ins and plan reviews. We are also looking on the basis of the Council’s advice how we can support people to plan better for their own safety. Obviously, there is a much wider important strategic context here as it relates to implementations from the Robertson review and also the Commission’s review of the Quality and Safeguards Framework, which is going to begin later this year.

The early stage here, we’ve had a research protocol endorsed by a steering committee that’s looking at national and international best practice safeguards looking at these issues and we’ve just started a series of workshops to go out and talk to participants, providers, NDIA staff, planners and LACs about this issue as well. The taxable be to go out through the DRCO network again, potentially using the net participant network engagement panel speaking to your constituents about this important issue.

23 Page 355 of 390

Supported decision-making

Supported decision-making is another one we agreed is a key priority, another that builds off the back of excessive consultation undertaken in 2021 and the feedback we received, including from any of your organisations. We have again had a co-design and engagement plan endorsed with our steering committee relatively recently that we’ve made a start on implementing. And there is a key partnership with Inclusion Australia, who are leading the process to ensure that participants, optically those that are benefiting from supported decision-making, I thoroughly engaged and involved in how this policy is progressed, and there is a bit of an insight there into the approach we are taking, working in close partnership with Inclusion Australia so the people with an intellectual disability are engaged and involved in all of the decision-making from top to bottom about how this will work and helping us to reach out to other groups so that we are covering all of the bases in terms of the diversity of voices that we want to hear from.

If you move the slide on. Just finalising what the key topics will be on the basis of the feedback we received from our consultation last year. Work will kick off very soon and we expect that to conclude sort of end of September, and have a policy position endorsed at around that time that we can then start to move onto a conversation around implementation and what that lets look like.

I think I’ll hand over to Josh to talk about cultural and linguistically diverse strategy.

Joshua Ng

A context, the NDIA as of March this year we have more than 44,000 participants who are culturally and linguistically diverse nationally, almost 9% of the scheme. Through this work we are asking questions about how we measurably improve outcomes for participants over the next four years. The objectives of this project are threefold, firstly to run the common design process to support CALD participants, carers and organisations. Their families, carers and organisations, and early development action that can be monitored and progressed to achieve goals. In terms of the approach for this work as Sam mentioned, it follows a four-phase approach outlining the NDIA’s engagement framework firstly to prepare our engagement, secondly to discover the challenges facing CALD participants, developing solutions with participants in the sector.

If we move onto the next slide, we are have recently finalised the discovery phase, so all the actions we were facilitating through roundtable meetings in over 30 sectors, to develop the areas of focus goals. Through this process we worked very closely with leader as well, and we found five areas is critical which can be addressed through codesign. Infrastructure, front-line capability, accessible communications, markets and data. We also reviewed and finalise the discovery phase report.

We are now in the develop phase with the CALD community to support and improved outcomes. There is also formal governance established for this phase but in terms of focus groups, we have face-to-face activities with participants, families who speak languages other than English, whose voices are not usually heard, and also hard to reach participants who identify as CALD as well.

If we move onto the next slide, similar to the CALD strategy, our First Nations strategy follows a co-design method as well. There is a context here that the current Aboriginal and Torres Strait Islanders strategy was released in March, 2017. At the start of last year we started a process to refresh the strategy and as of March this year we’ve got about 37,000 participants who are on 7% of total participants who identify as First Nations. And through this cortisone process we are seeking to address the question of how the agency can measurably improve outcomes for Aboriginal and Torres Strait Islanders participants over the next four years.

So we are in the preparing stage of codesign, so less progress compare to the CALD strategy. With also conducted a preliminary desktop review but we are also very conscious that this strategy is in the context of other policies, actions and plans. This includes for example the Commonwealth agreement closing the gap, the NDIA reconciliation plan and we’ve got other strategies that intersect with this work as well, so just a remote strategy and the ECS remote strategy was in development as well.

So today we have reviewed recommendations from a range of government and non-government reviews and organisations working very closely with FPDN, so where we are now.

I’m might pass it back to Liz to field questions.

LIZ CALLAGHAN

Thanks, Josh, Sam. I will open up the floor. I know that’s a lot of information, but just looking online there doesn’t seem to be any questions in the room. Catherine, we will go to you first.

CATHERINE McALPINE

More of a comment than a question, the lack of interpreters meant we couldn’t talk about this, my observation about the way we feel about the different projects is different in terms of the level of co-design. The two we are the most engaged with where we say there is a red-hot go happening, it feels like we are doing something that will look like co-design. In home and living that is not what it feels like. It feels like there are moves happening in the middle of co-design and new materials coming out of home and living. Our representative has spoken to you

DR SAM BENNETT:

I’ll come back on that briefly if I may, we are addressing these issues differently

And if you’ve taken one thing from the presentation, we have deliberately different approaches across the different pieces of work. For home and living the focus is on the longer term reform. It is on big reform of home and living and how that works across the scheme. What we have is an $8 billion partnership scheme supporting vulnerable participants and making improvements in the short to medium term as well. There is a wider project of work around home and living that has short-term improvements being progressed while also keeping the co- design group focused on the big picture change we want to see.

That is complex, I appreciate, but it is also something that is part of the challenge of running a large, complex service delivery organisation.

CATHERINE McALPINE:

I acknowledge the complexity, but some of the changes are not seen as improvements by the people on the Co- Design Committee, it doesn’t feel like… If it was short-term and long-term, that would be fine but that is not what we are getting reported back.

DR SAM BENNETT:

That is good feedback.

CATHERINE McALPINE:

When we talked internally, what is happening in one group or another and I support a difference in approach, but in the early stages, where we are now, it feels like one is working better than the other.

LIZ CALLAGHAN:

Do we have any other comments or hands up? Giancarlo?

GIANCARLO DE VERA:

I wanted to highlight a few things, in the home and living steering committee, it was alluded to, the longer term and the need for pressing changes now because of the need to meet the needs of some of the most vulnerable people in the scheme.

As a group we need to recognise is a tension. I have concerns around the timeliness of some of that, it feels like the design elements in the workshops are predetermined. I have raised concerns around the timeline. I think is a function of the need to meet pressing needs. I raised the issue around the longer term vision, in a larger paradigm of potential future changes, which I raised at the last steering committee.

And what that means for a policy developed in isolation, this time next year we could see a different series of policies coming through from the Royal Commission and the Productivity Commission. The concern I have, while I appreciate the tension between pressing need a longer term vision and the need to recognise the work already happening in public consultations, there is something we need to come together in recognising that if there is a pressing need, we need to identify them. At the moment I would echo Catherine’s comments around the elements of the workshop being somewhat predetermined, without necessarily having the chance to talk about that in a way that helps balance the need to meet pressing demand and longer term changes.

DR SAM BENNETT:

Thanks, that is thoughtful feedback and I appreciate it. The tension you described as a real one. We feel that too. We have a pressing need to make improvements where we can in the here and now, but we need to know it needs to look different in the longer term. We are doing work internally to map our short to medium term initiatives in what we think could be the end state vision, we don’t want to do things that are not coherent in terms of the progress we have made on that so far.

I think on the workshops, I don’t think the outcome is predetermined. I hope that was clear in the slides. To give you one example again, what we will be designing is the question. All of the feedback through public consultation was positive and affirmative about this being one of the right questions to answer, how do we provide much more timely, upfront support for people in their NDIS journey that have home and living goals, to think about what their options might be and to not be on an inevitable pathway to a group home.

That is what we are trying to get ahead of. It is that challenge that will go into the co-design groups. There is a determined question but the answer is very much open to the design process now for us to determine the solution.

LIZ CALLAGHAN:

Thanks, Sam. Mary?

MARY MALLETT:

I hadn’t had time to look at the PowerPoint that we shared yesterday, I didn’t realise the CALD and ATSIEB strategy, we were not thinking about them as co-design. I haven’t had time to think about it. Off the top of my head though, there is such a lot of work to be done. Joshua raced through that very quickly.

What is the next further opportunity we will get? I agree, working with NIDA and other groups, we all need to be able to seriously feed into those processes.

JOSHUA NG:

Good question, shortly we will organise some style event where we bring the advisory group together, looking at processes in the design phase to move forward. A series of sum events coming up and individual focus groups that will include meeting hard to reach CALD participants.

MARY MALLETT:

Will those opportunities be circulated to us?

JOSHUA NG:

Absolutely. It will be coming shortly.

LIZ CALLAGHAN:

Catherine?

CATHERINE McALPINE:

When it talks about workshops with target groups, it seems to me that the individual at advocacy program would be critical to that. It says participants, carers, NDIA staff… You have other people on it but it feels like the purpose is part of safeguarding. It seems astonishing that has not been specifically identified.

DR SAM BENNETT:

Absolutely on our radar. You are right.

LIZ CALLAGHAN:

Looking for further comments or questions. Robbi?

ROBBI WILLIAMS:

I think the work is interesting and the topics are important. Is there a contextual pathway co-design project that looks at how the Agency might do an upfront assessment that leads to a choice of planner and so on?

DR SAM BENNETT:

Essentially that is IGAP in a nutshell. We make 11,000 issues per week and our data is clear there is issues with consistency in that pathway. We would be looking to streamline how the process works and the potential outputs of that, different approaches to planning.

LIZ CALLAGHAN:

Thank you. To recap on the actions from this session, we will distribute the theory of change across the membership here. Sam has undertaken to have a deeper conversation with Inclusion Australia around participation of people with intellectual disability in the evaluation process for co-design. Josh has committed to making sure, when the co-design opportunities arise for First Nations and CALD refresh schemes, that will be communicated as well.

Thank you. That was really good. And Sam and Josh, we all appreciate the time and effort you have gone to to make this presentation. We will break for lunch now and come back at 1:30. Lunch is just outside. We will see you all then. This is a comment to people in the room, come back on time because everyone online was on time for this session. Please pay them the courtesy of being back here at 1:30. Thank you.

(Lunch break)

SPEAKER:

We are live again.

LIZ CALLAGHAN:

We are all back now with better attendance at 1:30 PM by the people in the room at this time then at morning tea, so well done. I hope everyone had a good lunch. We did, it was very nice.

26 Page 358 of 390

I now like to welcome and introduce you to the NDIA Chief Counsel, Matthew Swainson, who is going to provide an update on the AAT, and Matt and I have had a bit of a chat about this forum. Matt understands who’s online and was in the room today. He will be very happy to take questions.

SPEAKER: (inaudible)

LIZ CALLAGHAN:

Someone has got the microphone on. I would hand over to Matt now.

MATTHEW SWAINSON:

Thank you very much for having me here this afternoon. It looks like I’m living the stereotype of my profession, already been told about that already today, I guess just to introduce myself, I am the Chief Counsel at the NDIA, rapidly getting across the issues going on across the Agency and the sector.

I come from ComCare, workers compensation, I was head of legal there for about seven years. So we hope this afternoon to give you an update about what’s happening with our AAT program. I will get straight to the point on that and I don’t think I can start talking about that without acknowledging I’ve been here for five weeks, so we need to acknowledge, I guess, what’s going on in the program and the criticism and commentary about the program.

I think we at present have about 4500 AAT matters, and that number has risen quite quickly to that point. It’s not a pleasant or nice place to be. It’s a disputation process and I think it is incumbent on all of us to acknowledge that a disputation process is by its nature not a pleasant or a place where you want a participant to be. From what I’ve seen and for what I looked at the agency before starting, I do acknowledge there is an issue there that we need to put some effort into resolving those numbers, is not a sustainable number. And for those participants who want to seek a review, and it is a statutory right that we try to do that as quickly as we can, and what we can to make sure what is inherently a tough process, it does need to be as tough as it is.

That’s certainly what our new Minister said after the election, that he wants to make his presence there in that space, so I’m not gonna talk about things will continue as normal. The Minister made an election commitment to make things better and clearly will be working towards dealing with that. And doing what we can to help.

I guess, did you want me to flip through slides or just talk?

LIZ CALLAGHAN:

If you’ve got a slide presentation, you can use that.

MATTHEW SWAINSON:

I’m more than happy to go through slides. I think there’s four ways of looking at what we want to improve in the space. Clearly what goes into the AAT starts with decision-making, so we’ve got to look at that from a decision-making point, a lot of that is about communication, making sure we are explaining decisions and making sure we are engaging with participants through that point.

AAT is there as clearly a pipeline and we need look at that. I think reducing the number of planning decisions the progress to review, is a good outcome. Internal review, there is another decision-making point. Looking at a number of internal review matters that then proceed to the AAT, and I think I’ve been a Commonwealth litigator for most of my career and the AAT is meant to be fair and quick and informal mechanism of dispute, that’s what it was set up to do. It’s not always the case.

So if we can reduce the number of matters going through at the AAT, that would be good, but there are going to be cases that we can’t agree on and it is a statutory right to seek that review, so we’ve got to support that. If you want to come through to the AAT, we’ve got to reduce the time frame there.

The Minister did make some commitments around this during the election period, a lot of that was about I think reducing the use of external lawyers in the scheme. The quickest way we can do that is reduce the number of cases in the AAT, that’s probably quite a focus. But I think he is absolutely invested in us making an improvement on that. Lisa and I met with him and a number of representatives I think last week, on the 22nd, and out of that we came out with some clear commitments that we got a plan, looking at the caseload at a very accelerated rate. I think as of next week we’re going to put, in management speak, Tiger teams looking at that caseload and doing an intense review everything before the AAT.

We hope to finish that probably by early October. So we got to make sure we’ve got some resources on that. We are also looking at what we might be able to do in terms of providing, under the current legislation, so not talking about changing the legislation at the moment, putting in some mechanism as a pressure release valve, and that really is about not so much an alternative review pathway, because that would require some change to the legislation, but at least some sort of mediator or conciliator that is a bit at arms length from the Agency that a

participant could talk to or use or I guess facilitate a discussion between the Agency and the participant that is not an adversarial process but as a pressure release valve.

So we’re looking at a model of what that might look like, where it’s best place, you know, we’re quite conscious that is another administrative process, another thing that the applicants would need to gear up to and deal with. So we are going to need to test that with people working in the sector.

I guess on the good news, some of the work they had already been started on this, I know Lisa and Martin on a weekly basis have been committing some time to sit there and go through cases, and some of the initial work I think that’s been happening in internal review space has meant that over the last few weeks the numbers of matters coming in to the AAT have reduced, the matters we are resolving are now exceeding the numbers coming in.

That’s a trend we’re looking at over a matter of weeks, not long-term, so we just need to make sure we sustain that.

OK, that is the update where I am. I guess another big part of this is the model litigants and ensuring that the NDIA discharges this obligations as a model litigants. In this game we need to go beyond that because we are dealing with a particular cohort of vulnerable people, most will be self represented may not actually understand how to engage the disputation process, so that something will need to look at. It’s an obligation I would like to talk to people about.

I will stop there.

LIZ CALLAGHAN:

Lisa wants to say a few things.

LISA:

Thanks, Matt. If you say to this group and the groups who were in that call, who the Minister spoke to so you could just have a sense of the stakeholders engaged there. In broad terms, legal aid agencies, legal advocacy agencies, a couple of law firms that the Minister has had contact with who he knows are doing a lot of work in representing participants in the AAT hearings. So it was a loose gathering of people who came to the Minister’s attention, and some of you may know some of those groups. Because it was an unknown group to us, I have to say, to be honest, but obviously we are stepping up to the engagement there. Did I miss anyone there?

SPEAKER:

You said there was legal aid and then legal advocates, but the other general, a few of them are legally trained but most are not, they just general advocates to work on NDIS.

SPEAKER:

When I say they are unknown to us, my staff and teams know that but I haven’t met with them as a group. It’s interesting them coming together because it was helpful to us and I learned a lot of things and we are committed to continuing to talk at senior levels with a combined experience in perspective.

MATT:

An there is the NDIA systemic issues working group, which again looks like a bit of a grouping of similar minded organisations and legal aid people in there I think, advocacy groups, Mary might be able to fill you in on that one.

SPEAKER:

Is mostly the appeal advocates?

SPEAKER:

Yes, and it was Tuesday. To give a similar sort of update and start a conversation to hear about what the alternative dispute resolution model might look like. I think I feel we would like and the Minister would like us to do something that we can do immediately under the current legislation.

There is a lot that came out with the Minister and this group, ideas of looking at how we might look at appeals and reviews under the NDIS Act. And a lot of them will require change to the legislation, so not an immediate fix but there will be ideas that come through in other places of the system where we can do something quickly.

SPEAKER:

We do have a couple of questions in the queue and might just, Bob, you had your hand up first. If you could just introduce yourself to Matt, that would be good.

28 Page 360 of 390

BOB BUCKLEY:

My personal retirement is chockablock full now, over 40 cases in the AAT to help articulate the children with autism through the AAT because they can’t get legal aid and they can’t get advocacy through the NDAP that actually supports the case. I’ve run into a massive amount of problems with the NDIA not complying with the model litigant obligations, it’s really abysmal in that area, and I’d be really interested if there is any plan afoot to do something about that. Also, some of these cases just go on forever. Yesterday I got a statement fax issue of contention, a matter that’s been going on for three years, about the amount of money that the NDIA will pay for drop-off and pickup of a man for his (inaudible). Three years this has been going on. And the arguments the NDIA is putting up I just bizarre, it’s ludicrous. So I’m finding the space really challenging.

The charts you put up a really interesting, you said you’ve now got the number that are being closed ahead of being received, that’s only occurred once maybe.

SPEAKER:

There have been a couple.

BOB BUCKLEY:

What it doesn’t show is how many are in progress, this is the data that matters. And how long some of them are going, what is the distribution of how long they go in for? The other big concern, the ones I’m doing are young children, in many cases we are talking about significant percentages of the child’s life they are in the AAT. The process needs massive reform.

LIZ CALLAGHAN:

Thanks, Bob. Giancarlo?

GIANCARLO:

with the numbers it would be great to have a standing reporting item we can request every time we meet in this forum, it would be helpful to see the impacts of the changes of the NDIS Act will flow through. The change to the Act only happen a few weeks ago, it will be interesting over a longer period of time how this affects the AAT case load.

The second, I will start with a comment. You talked about the ADR process and the scope, I would have concerns around the ADR process being as a way to circumvent model litigant obligations, particularly relating to the need to not take advantage of a lack of resources to litigate a claim.

And potentially being misused as a way to stop things going to the AAT. I want assurance that the ADR process would not be looking to do that, because it would be obviously a shame to see the ADR process used in a way that settles things sooner rather than later, as a way of misusing the position of the claimant to litigate a claim before the AAT.

I wanted to put that forward. The follow-on question from that – what is the process in developing the scope of the ADR processes and how can we be involved? The question I have relates to the timeliness points that Bob mentioned. Around the fact that while we have to see how this impacts the caseloads, one of the things we have seen at disability Australia, we are in NDIS appeals provider, we’ve seen a change of behaviour in how the Agency relates to those who seek reviews internally and externally.

What is required to resolve an issue sooner rather than later to the point now where we am not seeing any engagement with any conversations with clients and people with a disability until they get close to settlement stage. Our experiences settlement is overwhelmingly in favour of the claimant we support. These matters shouldn’t have gone all the way to the AAT. A lot of it has to do with lack of transparency about what is required earlier in the piece. I say this in the context of not knowing how the changes to the Act will have impact.

Is there anything afoot to make sure more transparent processes in relation to the evidence required, or rather, making sure the Agency doesn’t ask questions they already know about a participant, that draws out the time of a claim?

MATTHEW SWAINSON:

I will start with a comment about the review rights, we are mindful that the right to go to the AAT is a statutory right, and the ADR model cannot disrupt that right. We are mindful of that. I think we need to talk to people about that model before we settle it, I will be working with Liz on what that looks like. We are very mindful of the statutory right and anything we put in place cannot upset that right. I can make that commitment, it will not upset that right.

In terms of the design of the model I will work with Liz to make sure there are no unintended consequences of us doing something we think is a good idea to release pressure that might have other consequences. I think the last question was around what are we doing, it went back to improving the decision-making process, Lisa may have a

comment, I think there is work going on in terms of operational guidance. That helps with transparency in terms

of how decisions are made.

The other part about it is putting in place more time and opportunity to engage with the participant in the primary decision-making point and also review decision-making point. That is the time to engage about evidence required. I think the third thing, I did mention what we are doing in terms of the AAT program, I’m focused on getting matters out of the AAT, we have recently re-established an early resolution team in the AAT branch, I think that was in place some time ago, as soon as a matter hits the AAT, that team can contact the participant to see what the issues are and see if there is something that can be done quickly.

I think that goes to communication, it’s not complete transparency but I think it will help.

LISA: There are a lot of reasons why it would be good for us to have more transparency and more support to participants and families and carers about approaching the first planning decision and making good decisions there. AATD is one of the reasons we want less cases they are, it would be inappropriate to suggest that’s the only reason. You’ve all been involved in lots of work and co-design is about guidance, better OGs, better engagement. We are not losing sight of that.

LIZ CALLAGHAN: Bill you have a question? Then Ross and Mary and Simon.

BILL: I will try to be brief. Thanks for the presentation, Matthew. I am from Community Mental Health Australia. If I can quote Mary, to get a sense of this group, we tend to be 5% acknowledging the great successes and 15% coming up with solutions but our role is 80% to talk about why things are not working. And we acknowledge the frustration and trauma of people on the frontline.

Clearly moving upstream to prevent people coming there is important. We want to mention something Martin Hoffman mentioned this morning, an interesting issue for someone working in law, whether it was a particular court ruling, the outcome was both sides of the claim had a reasonable claim, in other words a reasonable claim for the plan and a reasonable claim to reject it. That was weird, in complexity theory the only time that happens is you have a complex situation and partial perspectives, the blind man and the elephant, one of them thinks it is a tree and another thinks it is a leaf. They were both correct. The job is to have a comprehensive picture to see how the parts work together in that way you can resolve the matter. Just a comment.

Pointing to the fact that we still need to continue to enrich our understanding of people and their perspectives and what is happening out there. Nobody at the coalface has the full picture.

LIZ CALLAGHAN: Ross?

ROSS: I support the comments made by my colleagues and in particular it’s important we get more accurate information about what is at the AAT but more granular than what we have received before. It doesn’t help us if we are talking about 70% of the cases going in favour of the participant, that obviously demonstrates there is an upstream problem because the AAT is the downstream end point.

It would be good to get more granular information on that. I recognise you’ve only been in the role for five weeks. We have been banging on about this for years. The problems it causes for people with disability and their families to go through the system, I consider myself someone who would not want to go through the AAT process, even though I think I could handle it better than most people.

When you don’t have that to fall back on, when you are disadvantaged, and you have to face these significant legal processes that you are not used to, it is terrifying for a lot of people with disability. Some will choose to give up at that point. And that is not what should be happening. I commend you on looking at the upstream issues and I one of the other things to say, we need to get the planning part right.

If it isn’t, it’s not just a question… We need to find out those things and stop at that point and solve a lot of issues for the Agency and for us, but more importantly, for the participants. They would not have to deal with them over one or two or three years before things get resolved. The other granular things, how long are the cases lodged for, how long does it take to get to pre-decision? And what is the level of funding? Is it a dispute over $200,000, $20,000, $5000? That is relevant because it is about the assets of the agency, if they are trying to save a few thousand dollars on a wheelchair. I know there is the reasonable and necessary clause that’s fuzzy for all of us, but I don’t think we will ever get around that.

FOI 24/25-0332

I encourage you to be practical about the approach to that. Of course the Agency has a right, a legislated right, to reject elements of plans. It is the process from that point onwards, taking the approach we are dealing with people and generally disadvantaged communities who don’t have the time, capacity or money in their own right to be able to do the review part Justice.

Congratulations on looking at it, it’s good to see that Bill is moving on, he promised he would move smartly, that’s great. I also think it’s important that we see the Agency is now responding to that and taking on those challenges. Thank you.

LIZ CALLAGHAN: Thanks, Ross. (Inaudible) Mary?

MARY SAYERS: I was getting a bit of echo, sorry, in the background and couldn’t hear. Mary says, I am the CEO of Children & Young People with Disabilities Australia. We are the national representative organisation for children and young people with disability.

Given 54% of participants are aged under 25 and the prevalence of conditions like autism and intellectual disability among the scheme, I imagine that a large proportion of cases that come to the AAT may relate to children and young people.

I guess one of the things I am interested in is, A, transparency about that. Transparency around what types of plans are coming to the AAT. If they are settled or they are resolved, are there systemic or policy solutions that need to be made to address some of these claims?

And the problem at the moment is, the AAT and what happens at the AAT is shrouded in secrecy. We are, many of us are part of an NDIS Q working group which we work with the advocacy Centre. There have been freedom of information request. I am interested in how this new environment, we can be much more transparent about what other systemic things that are coming to the AAT.

Because the only way we are going to prevent the number of people needing to go to the AAT is not taking a case-by-case process of settling a case, but actually looking at what other policy decisions, what other systemic issues that need to be resolved to prevent it in the first case.

So, number one, I would like transparency about how many, a bit of a breakdown of the types of cohorts and age groups that are having challenges at the AAT. Or needing to go to the AAT. Because I suspect, and we had old figures that said it was around 1/4 of cases are children and young. I don’t know if that is increasing. We had a lot about children’s plans getting cut in the last sort of eight months.

Happy for you to respond anywhere you would like to that. Thank you. Thank you, in my time, it is the first time we have had the Chief Counsel come to this meeting. Really grateful to have you here.

MATTHEW SWAINSON: No problem. I think in terms of data, I am looking at colleagues over here. Lisa, thanks, gave me or not. I think we can commit to bringing back some more data.

I think that is a very sensible, reasonable request. (Inaudible) to come back with some more data. I have taken notes. You are interested in the timeliness, proportion of children, et cetera. We will have a think about that and come back on that.

Look, you know, in terms of settlement and transparency around that, I think it is very vexed issue. I take your point about what are we learning when we are solving those matters. They can be confidential, often the participant wants them to be confidential. There is a range of reasons.

That is not to say that we should be more transparent with those settlements, but I think I’ll be learning from it is your question. I think that is a good point and something we need to pick up on that.

LISA STUDDERT: I think I will add to that, absolutely keen to look at some regular dashboard we can view that tracks visibility. We are tracking closely internally and continuing to build out the visibility we have of the caseload.

The number of entities have asked us for reports on specific cases and how they are settled. I am going to be a bit hesitant about that in the first instance. I would like to get, in the days or months ahead if we get to a manageable caseload, then maybe we can commit resources to that. But it is a bit fraught.

Thanks, Ross, you are pulling the right place at the right time for me. I am worried about the resources I would have to commit that.

31 Page 363 of 390

MARY SAYERS:

I wasn’t talking about individual cases.

LISA STUDDERT:

Well, other people have.

MARY SAYERS:

It was more the thematic…

LISA STUDDERT:

Why people would be interested because there is learnings from them and internally, we are taking learnings from them. I personally have been sitting for the last six weeks in a weekly session going through a caseload with the teams.

Primarily to learn, but also where I can use my delegated responsibility helping reach quicker settlements. Also looking for ways where we can reach a quicker settlement, but help the participant onto a pathway where we support them to get more evidence for future decisions and plan reviews.

So that we are not just coming up with a near-term solution, but we are setting the pathway correctly, helpfully, for future plan reviews and decisions, so we don’t end up sort of in the same place two years later. So, we’re learning a lot and we will continue to do that and feedback as best we can to this group.

LIZ CALLAGHAN:

Thank you, Lisa, we will move on. Jen Blyth, you are online.

JEN BLYTH:

Thank you. I have typed out some comments on the chat. I will repeat everything I have said, but just talking about the process of AAT. It is seriously inaccessible for deaf people and I would assume for a number of people who have linguistic and cultural needs. Maybe the others might want to add to that, but it is heavily based on English and language and we need to have a lot of support for these people.

A lot of people don’t understand deafness and the whole field. So, organisations themselves don’t understand deafness. So, it is a real problem. So… And we have requested that we provide information in Auslan and you organise to have that translated.

For example, the statements, the life experience, lived experience. We said that we can sign this in Auslan and hand it over to you for translation processes and that has been rejected. So, it is inaccessible to us and we also want to complain about the timeframe.

Because if you are talking about deaf children. Parents who want Auslan access to learn Auslan, the extended process, the window for learning languages closing for these children and families, so there is a lot of English, a lot of problems with language deprivation for deaf children in Australia. So, this issue is banning Auslan basically and access to Auslan. You are denying parents to be able to learn Auslan and communicate with their children. I had someone contact me with a two-year-old who has been refused Auslan tutoring because the child has hearing aids.

Has no language, this child. The evidence that is required is just ridiculous. I am very angry about the situation and I’m coming across that way, I know. But I just wanted to make sure that it is on the record that the NDIS is causing long-term pain for deaf children and suffering for them and their families for not providing Auslan tuition.

LISA STUDDERT:

Thank you for that feedback. We will have a specific look at that issue in terms of accessibility to the processes and also any matters that we can identify.

LIZ CALLAGHAN:

Thanks, Jen. Simon, thanks for your patience.

SIMON:

Thanks for hearing us all up. I imagine it is like stepping into a cage of angry lines.

MATTHEW SWAINSON:

You have been very nice!

SIMON:

I thank you for having a look at ADR processes. I used to work in an agency and I can speak to the benefits of getting things under control before lawyers get involved, which we all want to avoid. It has only ever been in my

32 Page 364 of 390

experience effective if there is a genuine mediation where people are prepared to change their views on things.

What I would suggest is that you look at the review process and communicate an intent, communicate an intention to make a certain decision to the participants.

That way, if the participant is really not happy about that outcome, then there is an opportunity for the reviewer to speak directly to the participants and find out what the issues are and maybe come to a different assessment of the situation.

Rather than it being a situation where the mediation is just to help the people understand the supposedly reasonable decision of the reviewer. If there is no capacity to move the goalposts as it were, then it is going to fail. And you will end up in the AAT anyway.

Because as you heard, people are very upset about review decisions that deny them the supports that they think they need.

LIZ CALLAGHAN: Thanks, Simon. I am just mindful of time. We can have three more questions, four more questions, which means we are pushing probably our hold for DRCO items. Which, if we are comfortable doing that, because I think this is a really useful discussion and as someone said, it is a great opportunity.

So, we will go to Jean online if that is OK?

JEAN COTCHIN: Hello. Thank you. I am Jean. Nice to meet you virtually, Matt. I am a campaign manager at Every Australian Counts. Over the last few months in particular, we have heard from hundreds or thousands, I’ve lost count, of people who are really devastated with what is going on with AAT appeals, but also section 100 appeals, too.

And just kind of not having an easy time getting what they need or what they might have expected in the past. And so, this is really, it sounds very promising and I think this is a really excellent opportunity to both look at the root causes of these things and try and make very short-term fixes that can clear things up a bit, but also longer term strategic thinking.

I really, I like the idea of more transparency via data. I think it would be really helpful if, I know it’s going to be tricky because it might be really difficult to de-identify certain things in that data, but I think this would be a really good time to provide the public and all of us with more sort of raw data than we have sort of seen over the last year or two.

When it’s been presented in a way that tells a story. Instead, allow people to identify patterns themselves. If something like that is not possible and what I mean is a spreadsheet with as much raw data as we can get.

Part of the reason why I say that is because, for example, in a couple of the briefings we have had with the actuary office, some trends that were identified there didn’t match the trends that I’ve been hearing about from the appeals advocates.

As well as from the ground. And that’s not scientific, I know, but it would be really helpful and I think it would do done some good in repairing some of the trust that we are trying to resolve.

And I think, and if that’s not really possible, it would be, it’d be nice if you could consider the possibility of doing some, allowing for some more sort of independent analysis of it.

But in addition to that, I think this is also a really good opportunity to communicate like you have all said. That’s an important part of all of this and I think we can talk more about this off-line perhaps. But I think it would be nice to have a more direct conversation with people on the ground. And yourselves.

I’m sure you’ve heard it before… Sorry, Lisa, I didn’t catch that.

LISA STUDDERT: I probably cut you off. I think in your role with the campaign Director, you probably learn a lot. I’m sure Matt would be very happy to follow-up and hear some more from you from that first hand experience.

LIZ CALLAGHAN: Thanks, Jean. Did you have anything else?

JEAN COTCHIN: Just very quickly, I think, just for me and I think the people I represent would also appreciate hearing more detail or having more of an opportunity to discuss some of the proposed operational changes and processes that you

might be thinking about right now. For the other side of this journey if that is helpful. I’m sure everyone in the room can offer that sort of thing as well.

LISA STUDDERT:

Thanks, Jean. We will go to Robbi.

ROBBI WILLIAMS:

I’m Robbi Williams from JFA Purple Orange in Adelaide. I was on the radio this morning on the ABC because the health committee is meeting in Canberra today. That is something that the South Australian Health Minister (inaudible) these are NDIS participants. There is a process and it is taking time. (Inaudible) is a great idea. What are your thoughts about how that would reach into a third (inaudible) perspective (inaudible) that be a place where some of this resolution might then lead to some improvement in that interface?

MATTHEW SWAINSON:

I’m not sure of the numbers with that cohort. Very small or possibly none. Very small. It might be interesting where that is…

SPEAKER:

I think he was referring to one in particular. Certainly, we have a very high sensitivity to that. AAT, (unknown term), I have flags out on this and want to know about them if they have arrived at the AAT, and I am sure the numbers are very small.

MATTHEW SWAINSON:

Lisa flagged that with us pretty frequently. Conceptually, how would that work? We would like to talk about that before finalising the model. The idea is to have a pressure relief valve that facilitates a conversation that needs to be involved in that. We need to know what is going on on the ground before we finally something. That is why we need to talk to people.

LIZ CALLAGHAN:

Thank you. Bronwyn.

BRONWYN:

I join others in thanking you for coming along and having this opportunity. I’m grateful you are looking at the front end of things, of diverting people away from the AAT and am interested in hearing about some of the mechanisms. My questions are about people before the AAT and we have found that the AAT lawyers have been highly adversarial and I wondered if we could move that to a more collaborative approach to finding an outcome that benefits both parties.

MATTHEW SWAINSON:

I think what my four, five weeks has identified, our case numbers are too high and I think these are referred to that earlier. (Inaudible) put in place while we have volume of this type and trying to resources and meeting timeframes, so probably pretty immediate. I guess the other part I would go to and I’m pretty big on this is the primary duty of the lawyer in the AAT is to assist in reaching the correct decision and we need to focus more on that. It is what we are supposed to be doing, and I talked about putting a bit of a model, a framework around what we do and I think, for me, that is probably where it starts. It is a process so they will be an adversarial path. It does not need to be all of it.

BRONWYN PICKFORD:

Good to hear.

LIZ CALLAGHAN:

Mary Mallett?

MARY MALLETT:

The agency is stuck, the appeal is stuck, the processes itself. (Inaudible) from our perspective, we think there is a need for an injection of funding into the appeals advocacy. Appeals advocates are turning more people away than they can help and have been for some time and so a whole lot of people… There is even less funding into legal aid support so people who should be getting funding are getting nothing and either dropping out or are representing themselves and trying to do it themselves. That is an issue that (inaudible) Minister Rishworth and not Minister Shorten. Assuming that the current crisis situation gets reduced and resolved, we would like to see advocates involved early in the process. We have many anecdotal stories and data about the fact that for people who need an advocate, where an advocate can help them in their planning process or at the internal review stage, the matter gets resolved then and does not go… If it doesn’t go to an internal review, doesn’t go to the AAT. At the crisis, they haven’t got the time to be engaged early enough, so that is one issue. With the alternative dispute resolution and process or pilots, trials, whatever it involves, one thing in my mind, who will be involved, who will be involved? You have the participant hopefully with an advocate where they need one. Which people from the agency will be empowered to be the people in the room mediating? I don’t know the answer.

34 Page 366 of 390

LISA STUDDERT:

I don’t think we have an answer. (Inaudible) what makes the power dynamic equal and fair but also construct is probably what you are worried about. We need some guidance…

(Multiple speakers)

LISA STUDDERT:

I think we can commit to not having external lawyers being part of that process. I am pretty keen on that.

(Multiple speakers)

SPEAKER:

Sometimes these external lawyers are actually being second reviewers if they are negotiating with the complainant and they say,

That would be a good start.

LIZ CALLAGHAN:

Thank you very much, Bob, and thank you, Matt, for meeting with the CEOs today. Our actions from this is to make sure we provide a regular update to this group on the progress at the AAT, including if we develop a regular dashboard of data to show going forward, and I think there was a commitment to follow up with EAC, with Jean, to hear about some more examples on the ground.

SPEAKER:

And an involvement with this group plus others.

LIZ CALLAGHAN:

Development of an engagement process on the dispute resolution model. Thank you. We will just do a seamless transition now to David Gifford.

MATTHEW SWAINSON:

Thank you for having me.

LIZ CALLAGHAN:

Thank you.

SPEAKER:

Good luck with your next five weeks.

(Laughter)

LISA STUDDERT:

Hopefully you will be back.

LIZ CALLAGHAN:

Thanks, David. We will move straight on. I know that was a but I think it was a very fruitful discussion. Sitting next to me is David Gifford. You probably… He is well known to you all, think, Deputy scheme actuary, to talk through the investment scheme program. Do you have slides?

DAVID GIFFORD:

I do have slides. They will magically appear. Wonderful. I’m conscious of your time. My intention is to talk and no more than 10 minutes and take any questions we can fit into the time. Thank you for having me here, everyone. As Liz said, my name is David and you have probably had presentations (inaudible) and speaking today, the first conversations, hopefully a first of a number, about the effectiveness program, the piece of work we are in the very early stages of, which is around working together scheme expenditure and benefits achieved and understand scheme effectiveness. I emphasise the work is only really at the very early stages. We really haven’t really started it. It is very important to come along and talk

Today is about giving you a high-level overview of the program and getting some early thoughts from yourselves about how we can best engage around this piece of work. Thank you. Next slide. Sorry.

So, the overview of what we are proposing to do here as I said is really around linking together the body of data that the scheme has around expenditure on funded supports and the outcomes that are achieved by participants.

We set out on slide three there three very broad stages around the work. The first is understanding the link between funded support and participant outcomes. The second one gets into what does that mean from a policy perspective.

In terms of what do we learn from all of that that then can be fed into, I guess what we describe there is a more outcomes focused NDIS. Then the third broad point on the slide is around what would that mean from an implementation perspective.

I guess the point I would emphasise here is that that is sort of a pretty long-term program. Really, in the next six to 12 months we are going to be very much focused on that first question, which is doing the analysis and understanding those links.

I think I would emphasise here that when we talk about the benefits achieved by participants, we talk about scheme effectiveness, it is really important that that be a view or a perspective that is shared broadly. I mean, it clearly can’t just be the agency’s view.

So, when we talk about those benefits and how we are measuring those, that is why it is really important that we have a lot of consultation as we go around this piece of work.

Thank you. Next slide please. This slide four, for those following along, gives a little bit of context around this piece of work and I guess what we would regard as the sort of environmental and sort of government motivators for us to undertake this piece of work.

So, we have noted there on the slide the sections of the legislation that point towards the need for us to understand the effectiveness of funded supports.

We have highlighted the, I suppose, government context. Noting the intent of the incoming government or the new government, sorry, I should say.

Noting that this item around understanding scheme effectiveness has been called out previously by the joint standing committee, by disability, previous disability reform ministers meeting.

And lastly on this slide noting that, whilst we within the agency have historically undertaken – there has obviously been a lot of work undertaken historically in relation to scheme expenditure and there has historically been a lot of work undertaken in relation to spending undertaken by participants. The two have not been connected together and that is what this piece of work is about.

I will note, we have been having several conversations both inside and outside the agency about this piece of work. One of the things that has come up pretty strongly is that when we talk about outcomes achieved by the scheme, we recognise that there is no one single perfect view on what they are.

It is recognised that probably some of the data that tells us about that is not data held by the agency. So, when we take a long-term view of the single piece of work, I think ideally, we want to not just consider data held by the agency about outcomes, but to draw in other data sources as well.

That will take time and I think we, our position would be, we don’t want to, we are going to start with the outcomes data that the agency has been collecting over a number of years. But over time, we would want to draw in other outcomes data that is held elsewhere. I think that is an important point to make here.

Thank you. Next slide. So, this slide, slide five goes to the point that we regarded as very important to get input. You know, from very early on in this piece of work from participants and from other key sector stakeholders.

And hence, this conversation is one such engagement. Particularly, I think, the question which I have alluded to previously around what outcomes matter? How do we actually measure effectiveness of the scheme?

There is an existing, the scheme or the agency has an existing outcomes framework that was developed in consultation with participants, with academics, with other stakeholders. But that was at the point prior to the scheme entering transition.

That is now six years old. So, given where the scheme is now at, it is timely to reopen the question around what outcomes matter. It is critical that we do that broadly.

So, really, the engagement plan, we haven’t yet developed an engagement plan, but as I said, we are in the process of doing that. Discussions such as this one are really important in putting into that engagement plan. We will set out, what are the key questions and really as I said, the number one key question we think we have is what outcomes matter?

How do we consult and co-work with stakeholders on those questions? That question in particular. And who are those stakeholders? We are in the process, as I said, developing that engagement plan and that will be developing that in the next few weeks or months or so.

Thank you. So, this gives a sort of high-level outline of the phases of the program. I have sort of alluded to those on the, a couple of slides back. What I would emphasise is the first, that first phase, that key question which is around what are the key outcomes that matter most.

Building upon the outcomes data that the scheme has, the agency, sorry, has collected over a number of years. But trying to understand whether there are any gaps. So, what they are, and how we would go about filling those.

Phase 2 is around linking together the outcomes data. The data on funded supports, understanding those relationships. Then we move through I suppose, move through phases four and five which are around looking at those, what might a more optimal funding mix look like and then how would we go about achieving that.

The other point I will just make on this slide, it is not actually explicit here and I do apologise for that.

We do think, as part of the governance of this piece of work, I think it is really important that we do have sufficient independent input into it.

So, it is not just the agency. As I said, we are the holders of the data, but we think it is really important that we have appropriate external input. We plan to have, we haven’t quite worked out the model yet, but the current thinking is that we will have some sort of reference group of external experts, including academics, to guide and oversee the program of work.

Because we think it’s really important that those perspectives are brought to the table. So, part of phase 1, which isn’t called out on the slide, is the oversight and governance of the piece of work. I think that moves me to my final slide.

This then goes to the sort of very high level view of the milestones around the program of work. At this point, we are sort of anticipating that to do a full assessment of the effectiveness across all the different cohorts or participants in the scheme. I should have made the point earlier, we are not going to be assessing all the participants in one big analysis because we recognise there is a whole range of reasons why that would make sense.

This analysis will be undertaken quite a detailed participant cohort level. Within about two years, we anticipate program of work will have undertaken that analysis across all participant cohorts.

And then stepping back from that, in about a year’s time, we would anticipate having I suppose a slightly higher level version of that analysis.

Looking back from that, the first milestone I call out on the slide is that in the, we anticipate that in this year’s annual financial sustainability report releasing a very preliminary – I would emphasise preliminary – but indicative set of results.

They are probably just as much about showing that when we talk about sustainability of the scheme, it needs to be about linking together the scheme expenditure and benefits that participants achieve. The intention is that in the ASFR report that will be released in about three months time, that initial analysis will be presented.

We think it is just then, what that does from our perspective then, show that this is the direction we want to take when we talk about sustainability and the analysis would take around that and we hope that then would invite conversation and debate about the topic.

So, that is it for my slides. I’m not sure how I went with my two minutes, Liz?

LIZ CALLAGHAN: Pretty good. We have got four questions lined up already.

DAVID GIFFORD: I would be a little surprised if we didn’t on this topic.

LIZ CALLAGHAN: We have Bill in the room, Robbi, Mary online, Catherine, and Mary in the room. That is five. And Neha. We will go to Bill first. Thank you.

BILL GYE: Thank you, David. Bill Guy from Community Mental Health Australia. Very, very important work that I believe you are working on. In fact, in many ways, possibly the most important project if we could get this right.

I think particularly in relation to people with psychosocial disability, the great shame of the scheme in many ways is that the size of investment has not realised the recovery outcomes that we should have achieved in the scheme.

The data, the evidence is clearly there that the recovery model is based on a reality of people’s capacity to improve their social and economic participation and other outcomes, if you have the right inputs in the investment.

What is not working and why is it not working becomes the key question. In that regard, I call as a witness, the proportion of funding that is still spent on core activities versus capacity building.

Part of the problem was to the creation of the recovery coach model, was a great model, it should not have gone to support coordination. Its role is to translate people from Core Supports budget capacity building. Wrong place for it to be.

38 Page 370 of 390

It also needs to be a more highly remunerated role because the skill set involved is very core.

I will briefly talk about this because this is probably more of a statement than a question and other people are keen to go. There are not many contexts where you get to put this out and I want to point to what I think is a conceptual complication but I don’t think we have fully wrested with just yet.

Many people if you asked them as a participant what are the goals and outcomes, won’t be able to answer. They don’t think in those terms initially.

What is lost really or what is not quite appreciated is that there is a set of competencies that need to be developed in a sequence, in a hierarchy with a lot of people. I guess I am saying this from 20 years of having worked on the front line where I am being paid to assist people through to outcomes and going spectacularly broke and being awake at 2 o’clock in the morning wrestling with this problem. For many, many years.

Some of those core capacities and the ones that are invisible is people’s capacity for agency itself. It needs and requires development there. Learned helplessness will actually freeze people in a state of lack of agency and capacity. If you presume that is there and people will be able to identify their goals and needs and you move forward from that, you will presume something that is not actually there.

That needs to be a pretty early part of the decision support system. And skilled workers intuit this and know that this needs to happen. They are very good at doing it. But they are few and far between and the competency and remuneration that you need to attract and retain them I don’t think is appreciated. Without that, we won’t have those economic and social participation outcomes and the independence that that actually brings and with its implication for scheme sustainability.

I am not saying there is a simple solution, but I do think this is something that has been missed and somewhere that we need to talk about a bit more. My intention is to bring it up now from a 5000 feet distance. Pointed out.

DAVID GIFFORD:

I think as you said Bill, it is probably more of an observation than a question. The comment I would make is, and I will be, I want to manage expectations. As I said, it will basically be a years work to cover the breadth of cohorts across the scheme.

I guess I would hope that if this piece of work does its job properly, it would be a central place where we are looking at all cohorts across the scheme. The outcomes they are achieving and the relationship we can see. I would hope that it is doing its job properly, but suddenly my intention, that the points you made around, either it is particular supports such as recovery coaching or I suppose the sort of model more generally, it will highlight some of those gaps. And it will give it a bit more evidence to the extent that there is a lack of effectiveness in the current model. It will call that out and it will be more, it will be hard data to that effect. So, that is certainly the intention.

LIZ CALLAGHAN:

We will go to Robbie. Say your name again for the captioners.

ROBBI WILLIAMS:

Robbi Williams from JFA Purple Orange. We have had involvement in this space for a few years. I would probably go back about 15 years. We have been trying to understand outcomes, how to measure them and how that relates to investment. I remember having conversations with John Walsh and Sarah when they were at PricewaterhouseCoopers. I think… I’m a fan of social insurance and so… I think about outcomes. A fundamental challenge of the scheme is that if we want to measure impact, essential to what we are doing is gathering two sets of data, so outcome data is really the second dataset. The first dataset is the assessment and so to me, there is a compelling logic that the two sets of questions should be the same. When we think about outcomes, it is a bit… No one’s fault, the phrase of social and economic participation because what passes for social participation might be someone taken by their support coordinator to a cafe and have no engagement with anyone and yet that will count that in the data as spending more time in the community, but it is pretty thin, an outcome (inaudible) the scheme should be satisfied with. When we think about scheme outcomes, I think we are thinking about outcomes important to us all, like the opposite of learned helplessness, the opposite, which is about hope and self-belief and personal agency and autonomy of my decisions, support for my decision so those ideas, very transformational outcomes but also things like work, friends, a home of my own. These are the outcomes I think the scheme would want to pursue and be proud of and want to know what types of investments best support that. I think a hurdle of the scheme is to try to change the balance in thinking about assessments from trying to assess disability to assessing the consequences of disability. Because there are many questions around how disabled someone is. In PEDI-CAT, there are questions like can you climb a ladder? Can you walk a kilometre with a 7 kg bag? What is seven Ks? We should only think about those questions in terms of outcomes. It doesn’t make sense. With a scheme the size, there is nothing to stop the scheme, given outcomes are for half a million people that it should have its own instrument delivering on outcome data and a certain data.

39 Page 371 of 390

otherwise what you have is a disconnect because you have a bunch of questions being asked about people’s situations that lands (inaudible) investments but may have nothing to do with outcomes.

I will give a quick example.

LIZ CALLAGHAN:

We have eight people waiting.

ROBBI WILLIAMS:

People know what I am like. People have a 13 year old. Parents know what will be right that the child has a circle of supportive built friendship (inaudible) and other things that are meant to be helpful like therapy. They don’t want kids to have therapy but friends. The danger is we ask the wrong questions at assessment and measuring disability, not consequence.

DAVID GIFFORD:

We have the data, it is broader, I’m sure you are well aware of that. I think that has been the body of data we have collected for six years. This is the point which I think we need to reopen, that question, and I’m sure… I have already heard a number of inputs. I have heard a few more from you. I think we need to be realistic that, to sort of build upon or to systematise collections of those outcomes data across the whole population and to then have that longitudinally, there is a (inaudible) we would need to make to that. We absolutely have to do that. I suppose it is a question of we want to get started on the work with our existing body of data to emphasise how important this is while at the same time really genuinely we are asking the question about whether we have those outcomes captured. A point well made.

MARY SAYERS:

My question is like Robbi’s in terms of are we measuring the right outcomes? Obviously, for children and young people, sometimes we need to go by a theory of change rather than outcomes, so if children experience a high quality early childhood education, they are more likely to have a better transition to primary school. If they attend a mainstream school, they are more likely to have better outcomes than if they are segregated. So, I think we do need to have another look at the outcomes we are measuring because, under the NDIS, and we spoke about this earlier in the day, children in segregated education settings have actually increased rather than decreased and the evidence is very clear they have better life outcomes if they are fully included in Inclusive Education, so I think sometimes we are measuring the wrong things and calling them an outcome, and particularly the children and young people with disability who make up – I will say it again – 58% of scheme participants, I think now there has never been a better time now to look at outcomes of this cohort given they make up such a large proportion and if we look at lifetime investment, if we get these things right at the key transitions between preschools, schools, school to secondary school, post-school transition, the lifetime impacts will be so significant, so I would encourage you, David, to convene a special group to look at particularly children and young people because the outcomes are going to be different than for adults who the outcomes… There might be overlap but there will definitely be… And of course the data that is collected is often… That shows impact is often going to be outside the NDIA, things like education, jurisdictions.

If we look at children, for example, in out of home care, for example, you would hypothesise the children who have an NDIS plan would have a better transition to out-of-home care. We know that is not the case. I think there are nuances we want to look into in this outcomes discussion, so thank you.

DAVID GIFFORD:

Thank you, Mary. I’m repeating myself to a degree but hearing both the general support for considering the outcomes and some of the specific views for particular participant groups, that is an important part of this. I think what you have raised and proposed around just getting that detailed input, that is absolutely what we plan to do. Thank you.

LIZ CALLAGHAN:

Catherine Alpine?

CATHERINE McALPINE:

Catherine McAlpine. CEO of Inclusion Australia. Some people have said… There will be themes. Some people have said it more than me, but about bloody time! It is wonderful to hear you are doing this work. I would comment again – I completely agree with the questions about what are the outcomes? So, we would talk about links with Australia’s Disability Strategy and UNCRPD. Definitions of social and economic participation not consistent with article 27. It’s not economic participation if you are not earning a proper income and that we met at the moment your outcome, are you in paid employment? We have to look at definitions and what we mean by social and economic participation. We want to make sure you have a decent… It is representative of the participant mix. We don’t hear enough voices from the people in the segregated settings for the people in the group homes, in ADEs, which is a huge expense and in the scheme is not the people you are hearing from directly so we need to make sure you have mechanism so you can hear what those might be and just the back of Mary in terms of the… And I know this is convex but the interface of the system. One thing Mary and I both talked

about at the Disability Royal Commission is how early childhood early intervention practitioners in the NDIA

impact the choice of schools and part of the increase toward segregation is an interface between the NDIA and school systems and what can we do about that? Understand all of that is very complex but just really backing in the theme that you are hearing and to talk specifically of course about people with intellectual disability and particularly people in segregated settings.

DAVID GIFFORD: Again, really appreciate the point. I think the point around how we sort of consider aspects of participants’ environments and assistants other than the scheme and the scheme’s funded support is an important question and we don’t want to pretend it is part of the funded (inaudible) and it is long-term. I’m being idealistic. We are able to grapple with that together. The reality is that takes time but we have to start somewhere, starting now, and I think you’re only at the start of this journey. Those firm views, I guess they only strengthen the commitment to make this as holistic and as meaningful as it can be for everyone, so thank you.

LIZ CALLAGHAN: We will go to Mary Mallett in the room next.

MARY MALLETT: Thanks. A plea for all the engagement and communications about this has to be done so carefully or there is a really significant risk what will happen is people will leap to a conclusion that what this is all about is… It will make people really know this and they will think there are good participants achieving the goals and bad participants who do not achieve goals. And the ones who think they might be in the bad participants, obviously, this will not be anything coming out from the agency, but that is how people might see and perceive and feel it, that if they never get to be one of the good ones, they will kind of stay quiet and hide away and why would you participate in anything to do with having outcomes measured? They will be petrified that,

FOI 24/25-0332

We sort of, we don’t want to, if we waited to ask that question to collect more, to potentially gather more outcomes data and analyse that, we will be waiting a couple of years. We feel we have got to do both. But it definitely has to be both. It is not just using the data we have got. I think I missed your second question.

NEHA: I think you got them. Am I right that you are developing a model now that will be ongoing?

DAVID GIFFORD: We are building a mathematical model that links together the funded support and the outcomes. There is a pilot phase that we will be reporting in the annual financial sustainability report for a cohort of participants.

That will be the first, I guess the first set of results. As I said, I think the emphasis will not so much beyond the results themselves, but more around the fact that when we talk about sustainability, this is now what we mean.

We are really trying to flag that this is what we are undertaking without I suppose initially at least focusing on the results. It is probably that analysis that will be delivered in about 12 months time, which we will be building on the body of data we have got. But as I acknowledge, we will use the outcomes we have that will be that modelling.

As I said, that modelling between funded supports and the outcomes data.

NEHA: Apologies, one last thing. This is the bit I am having a talk about. There will be factors that will change over time, like policy and service delivery design that impacts outcomes. Is there a scope for that to be taken into consideration when you are developing that?

DAVID GIFFORD: I won’t go into the detail of the models now. I guess, we are intending to have a very academically rigorous methodology. As I said, we will definitely have external academic oversight of that. It is certainly not just a sort of, obviously we are looking at participants who have been in the scheme for different time periods, who have received different levels of funded support over that time period.

We need to have that dimension over time and what changes over time absolutely will be part of the models.

LIZ CALLAGHAN: Thanks, Neha. If we could go to Bob online, you have been very patient. Thank you.

BOB BUCKLEY: I guess these are sort of as much comments as questions really. My first concern really is, in a piece of work like this, you really need to have highly multifaceted outcomes.

There is not one sort of model of outcomes. One of the things that we really have to do is show for the whole community, not just for participants, what the benefits are.

One of the biggest challenges is working out how we describe the outcomes of the NDIS for the whole community. Now, legislatively and economically, we are probably going to be thinking primarily about participants.

But when it comes to messaging, it has to be the whole community and the politicians. It is really important that we do that. So, we sort of look at economic goals, which are things like employment.

But then I haven’t seen much measurement of independence or reporting of independence, which is probably a pretty important goal for a lot of participants.

To get both of those things, you actually have to have education outcomes. So, you can’t just look at the employment and independence outcomes without looking at how you get there through education.

And underlying all of this, you actually have to measure rights outcomes. So, the rights of people in so many areas. All of this comes down to a whole bunch of things around quality of life.

And how you choose which ones you make your sort of object function in your modelling varies depending on what your perspective is. So, it is actually a really complicated piece of work.

We need to be looking not only at these things, but health, we need to be looking at the outcomes for formal and informal carers. All of these things come into it.

So, there is a really challenging piece of work and I guess my really big question is, is what steps are you going to take to make sure that you don’t just focus within the silo of the NDIS. What are you going to do to make sure that you look across all those other areas of government that cover all of those outcomes areas?

It is a really essential thing that we measure way beyond just the sort of simple to measure things for participants. That is what I wanted to ask.

DAVID GIFFORD:

Look, hopefully it is at least a partial answer, Bob. We are currently in – the very initial work we are doing is around I suppose scanning and gathering at a participant cohort level, both outcome measures that are collected elsewhere that on, that complement what the scheme collects. Also, going to the point you just made, what other supports, funding elements, system components that contribute to the outcomes that participants achieve, other than those that are delivered by the scheme.

It certainly is, there is a recognition I can say genuinely upfront that the scheme is one part of a broader system. What that actually means from a sort of modelling and data point of view is complex as I think you would appreciate.

Because the data that we have most readily to hand is the sort of scheme data. But what I think is really important when we present results for the first time is to provide clarity that where we are aware that there are other funding, there are other inputs, funding sources that we recognise what we are doing is only a subset of all of that.

And that we have a process and a path to get there towards that broader perspective. So, as I said, I know I am reiterating this point. The purpose of coming along and having this conversation early is to hear that input and to, and so that the next time I come and talk you which I hope is not too far away, will give a bit more detail so you can actually see something on paper. It is not just me talking. That shows that path to sort of recognise the broader data, the broader ecosystem that we are operating within here.

So, hopefully that is at least partly adjust your question.

LIZ CALLAGHAN:

Thanks, David and Bob. Just go to the last question now before we wrap up. Leanne?

DR LEANNE BEAGLEY:

I am the CEO at Mental Health Australia. We cover the whole sector and that includes people with lived experience of mental illness and those that love and care for them. Just a couple of issues. There is a cohort issue that has been raised.

There is a cohort issue though about the intersectional issues, particularly from our perspective, children and young with mental illness. Or, you know, LGBTQI people with mental health issues et cetera.

I am hoping that your model will be able to understand or address that. It is people are not in discrete cohorts. The second issue is that when there is a recovery aim as Bill talked about earlier, people living in the community, we need to grapple with what the client themselves longs for and what they want to see.

The model somehow has to grab that and I think that is really challenging. A recent conversation I had with someone with that experience was that they wanted a house. Something to love and something to do. What do you want, Leanne?

Sector sustainability is a big issue in mental health. I’m sure it is in other sectors, but I am just speaking from the mental health sector. The workforce issues, the capability in the workforce, that might be turning over is a real problem around sustainability.

And a challenge that hopefully can be picked up in this model. The last issue is around transparency of what you learn. So, we have more probably interface engagement with the department of health.

They are good at consulting us up front, but not sharing what they learn. We need to know what you learn. And what we can contribute going forward to solutions that are identified through the model.

There are 140,000 people who have severe, enduring, persistent mental illness who do not access the NDIS and do not get state funded services. So, the states and territories, PHNs, and the water sector could learn a lot from the model you are developing. So, understanding the model and outcomes would be very important. Thank you very much.

DAVID GIFFORD:

FOI 24/25-0332

Thank you. I will comment. Suddenly, the principle around transparency and sharing this early and often I think is a really important one.

You know, I think the point, the other point you made around cohorts not being really discrete is a really important callout as well. Thank you.

LIZ CALLAGHAN: I got it wrong. Ross is in the queue. He is the last person in the queue, so we will take a question from Ross Joyce.

ROSS JOYCE: Thanks for the presentation. I will start off by saying I am alert, not alarmed. The reason I would say that is I am happy always to get involved in a process to look at outcomes measurement. I think that is a responsibility all of us have in any program or thing that we may be doing.

Certainly, in this one, which was a lot of money goes into that. A lot of money from taxpayers. And it impacts quite a lot across communities.

But I suppose my alert bit is just about, I think we need to be really clear about, you know, you are working on it, we need to be really clear about what are we doing this for. The end result. What other problems we want to store by that and work towards that as part of what the framework that is being put together.

And colleagues have mentioned a few things. I would like to reinforce Leanne’s. I think workforce and how that development is happening is another underlying issue with the outputs and the end result you can get.

So, there is quite a few things in there. It is not a simple case of looking at the participant data that we might have. We have to drill into that a lot further and look at the nuances of what else can impact on those outcomes.

Because I think Mary mentioned, we don’t want to end up in a situation where people with disability are feeling like you are either in the bad lot or a good lot. That is not what it is about. It is about looking at, what do we need to do to stop those blockages and encourage and ensure putting in other means that we can ensure better outcomes for the participants.

That has got to be reflective of where they are as well and we know that is a big issue. It is a big issue for getting supports and services here in Australia, but particularly for rural and remote and very remote stuff.

And finishing up point was… I need a coffee. The finishing up point was asked being more involved in the process and working on that. Which I know your intention is to do that. The other one though me to say was, it is not all just about data. Sorry to disappoint you, David. It is not all just data. It is about the stories and case studies that we do know and I will put that in the context of the good, the bad, and the ugly.

I think it is also about pulling that into the report as well, any sort of reporting that is going on. To reflect what is happening for people in more than just a data outcome context.

DAVID GIFFORD: The pedant in me would say it is data. Qualitative, rather than quantitative. I’m not trying to be a smart alec. I agree. It is qualitative data that brings it to life. I think we need the best… I guess, academics will have their own views, but in my personal view, is that the best research is mixed methods. It covers both. If all we have is a quantitative model, think it doesn’t really fully… Doesn’t fully go to effectiveness. I guess… A piece we haven’t really thought through… There are a couple of levels which can provide qualitative value. Do it with case studies but you can do more formal, qualitative research that accompanies that. I think that is something we need to have a think about.

LIZ CALLAGHAN: Thanks, David and Ross. I have taken a lot of notes that each person made starting from it is complicated work, right down to being clear why we are doing this and the communication has to be done really carefully and lots of interesting (inaudible) might be involved. Thanks a lot, David. It is 3:15 PM now, so we will move to Lisa’s last spot if that is OK. And… Can you see Lisa online or does she need to sit on the side? Can someone put something in the chat? Can see Lisa. Brilliant.

LISA STUDDERT: I won’t say very much. It has been really wonderful to be here in the room today with some of you, and I’m glad I could talk to some of you but not all of you and I of course am missing people on the screen but I’m intent on engaging with you more in coming months. I thank you for your genuine contribution, robust advice, honest feedback and that is very much welcomed. As Martin said at the beginning, I step into the shoes of the CEO from midnight tonight, acting CEO, for a period of months whilst CEO recruitment is underway. A bit of a daunting task. I feel the weight of the responsibility for such (inaudible) important scheme and for an agency full of colleagues

and professionals that I have an enormous amount of respect for at this time, but I also know I’m well supported

and I would ask the same from you in terms of honest and frank advice as we go forward as to what is working, what is not, what I can help with, what I cannot and I would like to do what I can with the full responsibility in mind. I have been saying to my team, I have in my mind three key objectives for the coming months given where we are at with the scheme, nine years old, the agency and the context of the current day.

I want to support the agency and the government by ensuring we support the new Minister and the new government. It is a time of change in Canberra, as the saying goes, but I think we feel that broadly across Australia and there’s some optimism, probably helped by the long tail end of the pandemic but we could work collectively to bring that spirit of renewal and change to the scheme and agency for participant benefits. It doesn’t serve any of us to feel sombre and negative about the future. So I would like to work with you all to support the Minister to do what his ambitions are and obviously, he is the elected official and he is who we serve and I would like to work with you, the sector, to deliver on the optimism and sense of renewal there is and of course my responsibilities are also for the agency to ensure it remains highly operational and CEO-ready for the next leader. So, I will have to do the things that have to be done as the CEO to keep an agency of over 5000 people to keep it running as it needs to.

So, that is my agenda, and I look forward to working with you to deliver that, but most importantly, continuing to improve the scheme and make it the best it can be for the participants and the Australian community. I will leave it at that.

LIZ CALLAGHAN: Thank you, Lisa. Lots of comments in the chat wishing you all the best and smiley faces.

We have some actions that have come out of today, quite a lot actually, which the team will distribute among the group after the meeting and I think we captured them all. I will not go through them now because I don’t want to (inaudible) play with the words a little bit but Garth has offered to go through the Community Connections, Community Practice about the community risk and Sam offered to provide a sandbox version of the PACE tools. Sam Bennett’s had a couple of actions around the theory of change and commitment to meet with Inclusion Australia and really identifying the codesign opportunities for this group, for the First Nations and CALD strategy refresh. An important session today was the AAT session and a strong commitment there to providing regular updates to this group including data and development and of course engagement processes for the model with this group and then with Dave just now, we have got a very clear message, everyone is keen to be involved so we will set up a process for that as well.

Thank you for everyone’s time today. It has been a long day for people online, so thank you for hanging in there. There are a couple of things in the chat about different summits and requests for speakers for conferences and things, so have a look at that. That will be good. And we will catch up and I am aware that we did have our future of the DRCO Forum discussion, we committed to doing strategic planning. We really need to talk to the Minister’s office around his preferred approach as well. We probably, realistically, would be looking to something in August, July’s school holidays and everything is getting away and it is 1 July today, but we will do our best, and as always, the stakeholder engagement team led by Matt Wright is an open door, as am I. Thanks to the team for organising the meeting today. Matt is unwell, so could not join us, but he was online and listening intently and messaging me all the time. And to the captioners, of course. Thanks, everyone, and thanks, Mary, for starting so early over in Perth. Enjoy the school holidays.

ALL: Thanks.