Hi s22(1)(a)(ii)!
Apologies for the wall of text – happy if you want to skip reading all this and we can talk about it tomorrow!
Today’s meeting went well and by the end of the discussion the PITC seemed happy with CI Connect. There are however a few questions they raised which we may need develop process for (similar to having a process for the review work to be done by the Quality and Sustainability Network). I have tried to capture the main points below but suspect more will come up as we work through the process. I have a meeting with s22(1)(a)(ii) this week so I will work through these with him initially, and then link with s22(1)(a)( i) - irr or the Partner Performance representative to go through the process and make sure it will work (and that ownership is established!).
Questions:
- How will Partners join into the training package for state-based topics?
- What happens if the quality issues for Partners are different in each state/from the state quality issues?
- What happens if different partner organisations want to address different topics?
- How will Partners be enrolled (will this need to be identified and nominated by different organisations? (I suspect
s22(1)(a)(ii)will have options for this)
After I had explained CI Connect is an approach which will help support change by providing structure to continuous improvement, there was still some concern from the group. In particular, Jan asked a few times about the additional impact of CI on the Forward View of Change for Partners, especially at the end of the year and everyone is learning about the Independent Assessment process. I kept laying out that CI Connect provides a structure to support CI which can be used to embed learning, and that this is a tool to lift performance rather than additional learning.
The question came up again, and then I said Continuous Improvement needs to be understood as a separate entity to training, which has time off tools specifically allocated to it. This provided a level of clarity which is missing from previous messaging, and s22(1)(a) said I should lead with that. But after the meeting when I thought back I felt a bit uncomfortable (especially as from our discussions I think there is a chance the ELT may want to incorporate training into CI Connect).
I think of training as a place and time where staff will learn something new or about a change in their ways of working, whereas CI was more likely to revisit and highlight areas where training had already been provided. With your approval I would like to put together a very direct statement along these lines to clarify the difference between training and CI, and perhaps we can have it endorsed by s22(1)(a) to go to the PED ELT for further approval. We can then add this to the documents and intranet page.
As always, happy to chat further!
Page 64 of 190
Kind Regards,
s22(1)(a)(ii) - irrelevant material Assistant Director – Performance, Learning and Change Performance, Management and Quality Branch Participant Experience Delivery (PED) Group National Disability Insurance Agency s22(1)(a)(ii) - irrelevant material
The NDIA acknowledges the Traditional Custodians of Country throughout Australia and their continuing connection to land, sea and community. We pay our respects to them and their cultures and to Elders past, present and emerging.
Page 65 of 190
🚩 Suggested fixes
Comments
Loading comments…
Comments are temporarily disabled.