NDIA Business Continuity Management Policy

FOI 20/21-0883 DOCUMENT 6

Item 2.4 Attachment A

April 2018

Draft for ELT Risk Committee Approval

Page 12 of 21

Version History

Version Author Date Comment
1.0 Risk and Assurance April 2015 Broadfoot/Rogan/Suter
1.1 Craig Rogan March 2018 Updated to reflect new framework
1.2 Craig Rogan April 2018 Minor content changes

Reviewers

Version Reviewer Date
1.2 Tammy Venturoni April 2018

Approvals

Version Name Position Signature Date
1.2 ELT Risk Committee

Distribution List

Name Position Organisation
ART

Page 13 of 21

1. Introduction

Business Continuity Management (BCM) encompasses a set of planning, preparatory and related activities that ensure the Agency:

  • responds in a timely, coordinated and effective manner to an interruption or declared disaster;
  • continue to be operational despite serious incidents or disasters that might otherwise have interrupted them; and
  • actively manage and resolve an incident in the shortest possible timeframe to minimise impacts.

Significant business disruption events can result from a wide range of causes including: loss of access to building(s); utility outages; ICT outages; and loss of staff. The National Disability Insurance Agency (NDIA or Agency) BCM arrangements are designed to minimise the impact of a significant business disruption on the Agency’s critical business functions and services and aims to ensure uninterrupted availability. Where this is not possible, the BCM activities will guide the rapid restoration of critical business activities and assist in the resumption of business as usual in an appropriately prioritised and orderly manner.

2. Objectives and Guiding Principles

The guiding principles of NDIA’s BCM Framework are:

  • we ensure access to medical and care supports for impacted staff members at all times and ensure participants are not put at risk; and
  • nationally consistent systems are in place to support the business.

These guiding principles drive the key objectives of NDIA’s BCM Framework, which are to:

  • minimise disruptions to time critical business activities;
  • ensure a timely resumption of operations following a disaster or other significant business disruption; and
  • preserve stakeholder confidence, credibility and goodwill.

These objectives are achieved by:

  • maintaining a set of plans to ensure that NDIA can manage and recover from emergencies, disasters and other business disruptive events;
  • fostering a culture and awareness of BCM within NDIA and promoting the practice of its planning as a routine part of business management;
  • the ongoing development, exercising and review of BCM plans and procedures; and
  • ensuring linkages with NDIA’s Risk Management Framework and Emergency Management procedures.

3. Scope

3.1 Scope inclusions

There are a number of scenarios that could seriously impact the ongoing functions and activities of NDIA, as such it is not possible to predict every possible scenario or cause of disruption. Whilst the BCM Framework provides direction, the unique nature of incidents requires that staff exercise judgment and tailor the response to their circumstances.

The NDIA BCM Framework is designed to address the following business disruption scenarios:

  • an event that creates a loss of physical access to the NDIA National Office buildings, Regional Office sites and the assets located at those sites;
  • loss of core utility services such as electricity, water and air-conditioning to the sites;
  • unavailability of personnel;
  • unavailability of ICT services including telephony, internet, intranet and email;
  • other scenarios specific for an individual critical business activity.

3.2 Scope Exclusions

The scope of the NDIA BCM Framework excludes detailed Information and Communications Technology (ICT) disaster recovery procedures, which are managed by the Department of Human Services (DHS). NDIA’s BCPs provide workarounds only, which allow the Agency to continue the identified critical business functions while ICT applications are recovered by DHS.

  1. Framework architecture

Figure 1 below illustrates the core documents within the NDIA BCM Framework and identifies accountabilities for BCM and related documents.

Figure 1 – NDIA Business Continuity Management and related frameworks

  1. Roles and responsibilities

                           Page 16 of 21
    

All staff play a key role in assisting the resumption of critical business activities in the time of a significant disruptive event.

Table 1 — Key BCM roles and responsibilities

Position / Role BCM Responsibilities
Chief Executive Officer Maintain communications with Government and Board in the event of a significant BCM incident.
Crisis Management Team Manages strategic issues, decisions and associated risks during a declared crisis event.
Agency Recovery Team Senior team responsible for coordinating the NDIA’s recovery from a major disruption. The team will focus on prioritising and coordinating restoration of core supporting functions required for NDIA to continue operations. Agency Recovery Team (ART) will be stood up by the Incident Leader to formulate and coordinate of action for ‘severe’ and ‘major’ incidents.
Incident Leader Chair of the ART.
National Business Resilience Team Develop and maintain the overall BCM Framework. Monitor, test and exercise the NDIA’s overall preparedness. Provide support to the ART as required. Foster a culture and awareness of BCM within NDIA and promote the practice of BCM as a routine part of business/operations management. Ensure best practice BCM in NDIA. Provide annual reports to the NDIA Board on the BCM Framework.
National Office Site Business Continuity Manager Sign-off relevant BCP(s) for the National Office site. Responsibility to confirm plans are fit for purpose for continuity of activities deemed time critical. Lead Site recovery efforts. National Office Site Business Continuity Teams (NO BCT) will be stood up for ‘major’ incidents impacting a National Office Site.
Regional Managers Sign-off relevant BCP(s) for the Region and each site within the Region. Responsibility to confirm plans are fit for purpose for continuity of activities deemed time critical. Lead Regional Business Continuity Teams and regional recovery efforts.
Regional Business Continuity Team (Regional BCT) Regional Business Continuity Team will be stood up for ‘major’ incidents by the Regional Manager.
Site Contacts Sign-off relevant BCP(s) for areas of responsibility to confirm plans are fit for purpose for continuity of activities deemed time critical. Lead local Business Continuity Teams and local recovery efforts.

Page 17 of 21

Local Business Continuity Teams (Local BCTs)

  • Maintain communications with the Regional manager in the event of an incident.
  • Ensure that the local BCP is reviewed, exercised and updated.
  • Maintain BCP kits which are accessible including in the event that local sites are closed.
  • Ensure all local staff are aware of their role or likely stand-down should a business continuity event occur.
  • Maintain an effective communication system to facilitate contact with local staff during a business continuity event (e.g. contact list).

All staff

  • Be familiar with emergency evacuation procedures for the building/facility.
  • Know the members of their local BCT.
  • Adhere to relevant business continuity procedures outlined in applicable BCPs.

Secretariat Support — National Business Resilience Team

  • Secretariat Support will provide administrative support as required.
  • Secretariat Support will provide the necessary tools, techniques and guidance material to Local BCTs to develop and exercise BCPs. Local BCTs will utilise the templates provided by the Secretariat.
  • Secretariat Support will report every twelve months to the Audit and Risk Committee on BCM activity and maturity.

6. Framework review requirements

The Agency’s BCM Framework and supporting documentation will be reviewed annually. The Business Impact Assessment will be reviewed following the introduction of any significant changes to business processes, structure or personnel.

Changes in policies and procedures will be endorsed by the Branch Manager — Risk, and approved, as necessary, by the Executive Leadership Team.

6.1 Document maintenance responsibilities and approvals

Ownership, maintenance responsibility and approval requirements for key BCM Framework documents are outlined in Table 2 on the following page.

Table 2: Document Maintenance Responsibilities and Review

Business Continuity Documents Document Owner Maintenance Responsibility Formal Review Frequency Approval
Contact Lists Site BC Contact Site BC Contact Monthly Local BC Contact
Business Continuity Management Policy BM Risk National Business Resilience Team Annual ELT Risk Committee
Training, and Exercise Guide Director — Business Resilience National Business Resilience Team Annually Chief Risk Officer
Business Impact Assessment Functional GM Functional BM or GM Annually Accountable General Manager
Agency Disaster Recovery Plan Chief Information Officer National Business Resilience Team Annually Chief Information Officer
Agency Recovery Plan DCEO Strategy Development and CRO National Business Resilience Team Annually Chief Risk Officer
National Office Business Continuity Plans Functional General Manager Function BM or GM Annually Accountable General Manager
Regional Business Continuity Plans Regional Manager Regional Business Continuity Teams Annually Regional Manager
Site Business Continuity Plans Pandemic Plan Site BC Contact Site BC Contact Annually Regional Manager
Content on intranet including templates, exercise schedules, contact lists and exercise scenarios Director — Business Resilience National Business Resilience Team As required BM Risk

7. Business continuity planning

Each function of the Agency will undertake/ review an annual Business Impact Assessment (BIA) to identify critical business activities. Each critical activity identified in the BIA will be captured in a Business Continuity Plan (BCP).

7.1 BCP minimum requirements

The NDIA operates in a widely dispersed and complex operating environment. To ensure its BCM framework is fit for purpose, the Agency maintains a number of business continuity plans, as outlined in Figure 1 on the previous page.

At a minimum, all BCPs must specify:

  • critical business activities;
  • maximum tolerable period of disruptions for each activity;
  • alternative work locations;
  • minimum staffing requirements;
  • critical equipment requirements and alternative storage arrangements (including emergency kits, computers and motor vehicles);
  • local BCT responsibilities;
  • manual workarounds where available;
  • communication approach with staff and stakeholders;
  • interdependencies with other areas of NDIA;
  • any external stakeholders, including references to, or attachments of, formal agreements with external stakeholders; and
  • recovery checklists.

7.2 BCP maintenance and testing requirements

BCPs will be fully reviewed at least every 12 months to ensure they are fit for purpose. In addition to the annual assessment, a review of business continuity documents will occur following:

  • a business disruption or exercise to capture and address any gaps or lessons learnt;
  • significant organisational restructure;
  • relocation of NDIA or its Offices;
  • significant staff movements; or
  • a shift in the strategic direction of NDIA.

When updating business continuity documents, maintenance teams must ensure:

  • any new activities or services that need to be included in the document are identified;
  • the document is effective, up-to-date, fit-for-purpose, and appropriate to the level of risk faced;
  • the document is clear, simple and concise; and
  • any lessons learned and/or process improvements from exercises or actual business continuity events have been incorporated into the plan.

Copies of all BCPs must be stored:

  • At NDIA sites in hard copy with the Site Manager;
  • Electronically and hard copy with the National Business Resilience Team;
  • Electronically with the Incident Manager; and
  • With delegates as required.

Following an update to a BCP, all hardcopies are to be destroyed and replaced with the revised plans to maintain currency and consistency.

7.3 Post incident review

Where a BCP is invoked, a Post Incident Review (PIR) will be undertaken. Details of the requirements of a PIR are to form part of each BCP.

8. Glossary of Terms

Key term Definition
Business Continuity Management Deals with maintaining key business processes and outputs despite disruption
Emergency Management Deals with time critical threats to lives, livelihoods, assets and the environment
Incident An event that impacts or threatens to impact the operations of the Agency by exceeding existing processes and risk controls
Non-Business Disruption Event An event which causes, or could cause, adverse media attention, a legal or reputation impact to the Agency.
Business Disruption Event An event which causes, or could cause, an outage, stoppage, or failure of a process or system, which impacts the ability of the Agency to deliver services.
Recovery Time Objective The amount of time required for staff to return processes / infrastructure to normal
Maximum Tolerable Disruption Period The maximum disruption period before a business suffers significant and/or irreversible loss
Business Impact Analysis A systematic process to determine and evaluate the potential effects of an interruption to critical business operations as a result of a disaster, accident or emergency
IT Service Continuity Deals with maintaining / restoring IT services, despite disruption, failure and / or outage
Workaround Strategy The alternative processes in place to support the business while primary services are disrupted
Recovery Strategy Procedures of returning business capability back to normal functioning levels (e.g. repairs)
Resumption Strategy The strategy for returning business processes back to normal following a disruption or outage (e.g. backlog)
Business Continuity Plan A documented set of procedures and information intended to deliver continuity of critical business processes in the event of a disruption to business as usual operations.