FOI 23/24-1092 DOCUMENT 1
Standard Operating Procedure
OFFICIAL For Internal Use Only
Unable to Progress with planning
The content of this document is OFFICIAL. This Standard Operating Procedure will help you to follow the unable to progress procedure when the participant does not attend scheduled planning appointments. You can also use this SOP when you are unable to progress with planning due to known circumstances.
1. Recent updates
| Date | What’s changed |
|---|---|
| April 2021 | New format. New Standard Operating Procedure for when a participant is unable to progress with planning. Information previously incorporated in Standard Operating Procedure — Unable to Contact. |
2. Checklist
| Topic | Checklist |
|---|---|
| Pre-requisites | Q) You have been advised the participant cannot progress with planning due to known circumstances. For example, the participant is in hospital or incarcerated. |
| Actions | UW 3.1 Do I use UTC or UTP procedure? UO) 3.2 Circumstances where you may be unable to progress with planning 3.3 Update the application Sub Status 3.4 Reassign the application 4.1 When are automated system extensions applied to plans? |
V2.0 2021-03-31 Unable to progress a participant Page 1 of 8
OFFICIAL This document is uncontrolled when printed. Page 1 of 8
Standard Operating Procedure
OFFICIAL For Internal Use Only
Procedure
Do I use the UTC or UTP procedure?
- If you are unable to contact the participant and you do not know why, refer to Standard Operating Procedure – Unable to contact.
- If you know the circumstances around why you are unable to contact the participant and/or progress with planning, for example a family member lets you know they are in hospital, go to 3.2 Circumstances where you may be unable to progress with planning.
- If the circumstance means that you are unable to progress with planning, continue to 3.3 Update the application Sub Status.
Circumstances where you may be unable to progress with planning
There are circumstances where you may be unable to progress with planning or the review of the participant’s plan. For example, if the participant:
- is in hospital - refer to a Health Liaison Officer
- is incarcerated - refer to Our Guideline – Justice system (external) for circumstances where planning would still occur when a participant is incarcerated - refer to a Justice Liaison Officer
- has complex support needs - refer to Complex Support Needs
- has disengaged from the NDIS or their providers of support and the participant has indicated they want to cease their NDIS plan - refer to Standard Operating Procedure – Cease the Participant Status.
Update the application Sub Status
Note: When you update the Sub Status during plan review you need to update two applications. You need to update the In Progress review application and the current Approved application.
V2.0 2021-03-31 Unable to progress a participant Page 2 of 8 OFFICIAL This document is uncontrolled when printed. Page 2 of 8
Standard Operating Procedure
OFFICIAL For Internal Use Only
-
Update the application Sub Status.
-
The System will display the available Unable to Progress Sub Status options, depending where the application is in the Pathway. Only select Unable to Progress Sub Status options.
Choose the Sub Status option most closely aligned with the current status of the application. For example, if you know the participant is out of the country, deceased or incarcerated you can select the Sub Status that reflects the situation.
-
Once the Sub Status is chosen, select OK
-
A Success message will appear. Select OK
3.4 Reassign the application
-
Search for and select the participant.
-
Select Pathway.
-
The NDIS Account screen displays. Select the current In-Progress application or the current Approved application.
V2.0 2021-03-31 Unable to progress a participant Page 3 of 8 OFFICIAL This document is uncontrolled when printed. Page 3 of 8
Standard Operating Procedure
OFFICIAL For Internal Use Only
4. Select Action (double arrows).
5. Select Re-assign.
6. For short term UTP reassign the application to a jurisdictional CRM inbox in the System.
Search for jurisdictional inbox by typing SDS in the search field. All the inboxes will display. Select the UTP inbox for your jurisdiction and select Assign.
7. For long term UTP, reassign the application to the SDS AU UTP National Unable to Progress CRM inbox. Select Assign.
V2.0 2021-03-31 Unable to progress a participant Page 4 of 8 OFFICIAL This document is uncontrolled when printed. Page 4 of 8
3.4.1 Create a Contact attempt Interaction
-
Search for and select the participant.
-
The NDIS Account screen displays. Select Add Items.
-
Select Interaction from the menu options.
-
Use Interaction Templates – General - Contact attempt to record the interaction.
- Status – Open
- Notes – Add the circumstances of why the participant is unable to progress and the estimated duration.
V2.0 2021-03-31 Unable to progress a participant Page 5 of 8 OFFICIAL This document is uncontrolled when printed. Page 5 of 8
Select Assign.
- Select Assign.
Interaction Details
-
Category 1: Pathway
-
Category 2: General
-
Category 3: Contact attempt
-
Channel: Internal Notes
-
Status: Open
-
Link Transaction: redacted
Notes: Participant unable to progress with planning because circumstances, for a period of duration.
[“Submit”, “Assign”, “Cancel”]
Assign the interaction to same inbox you assigned the application to.
Select Team Responsible
[Search] 🔍
The Team Responsible is updated. Select Submit.
Interaction Details
-
Category 1: Pathway
-
Category 2: General
-
Category 3: Contact attempt
-
Channel: Internal Notes
-
Status: Open Team Responsible
-
Link Transaction: redacted
Notes: Participant unable to progress with planning because circumstances, for a period of duration.
[“Submit”, “Assign”, “Cancel”]
The Success message appears. Select OK
Standard Operating Procedure
OFFICIAL For Internal Use Only
4. Appendices
4.1 When are automated System extensions applied to plans?
The System will apply a 365 day System extension to the plan if it has not been replaced by a new plan prior to the scheduled review date. The intention of the System extension is to give the participant continued access to funded supports until a plan review is undertaken. It does not replace the requirement for a plan review to occur.
Important: This is not a plan extension but a System extension. The System extension will continue to be applied until the plan is replaced by a new plan.
When an automated extension has been applied, you must undertake a plan review as soon as possible.
The plan will appear on reporting for expired plans. Operational reporting will also include reporting on the number of times a System extension occurs.
A System extension will not generate any correspondence to the participant or providers relating to the plan, as a new plan has not come into effect. A message will display on the myplace participant and provider portal to advise of the automatic extension and that service bookings have been extended. Providers will need to manually adjust the service booking to include the appropriate funding for the extension period.
5. Related procedures or resources
- Standard Operating Procedure – Unable to contact
- Guide to Interactions in the NDIS Business System
- Practice Guide – Assisting Communication
- Standard Operating Procedure – Assign an Application Sub Status
- Standard CRM Inbox Structure – Service Delivery and Performance
- Interaction Templates – General
- Standard Operating Procedure – View an Extension or Indexation in the System
- Practice Guide – Scheduled Plan Reviews
6. Feedback
If you have any feedback about this Standard Operating Procedure please complete our Feedback Form
V2.0 2021-03-31 Unable to progress a participant Page 7 of 8 OFFICIAL This document is uncontrolled when printed. Page 7 of 8
7. Version control
| Version | Amended by | Brief Description of Change | Status | Date |
|---|---|---|---|---|
| 1.0 | CW0032 | New Standard Operating Procedure for when a participant is unable to progress with planning. Standard Operating Procedure — Unable to Contact replaced with two SOPs: Unable to Contact and Unable to Progress. Class 2 - Approval | APPROVED | 2021-02-17 |
| 2.0 | JS0082 | Minor wording changes Class 1 - Approval | APPROVED | 2021-03-31 |
V2.0 2021-03-31 Unable to progress a participant Page 8 of 8